User contributions for Smithk
Jump to navigation
Jump to search
14 February 2022
- 14:1714:17, 14 February 2022 diff hist +14 m Recent Policy Changes in the EPG EPG 751.1.3.4, EPG 751.12.1.3, EPG 751.12.2
- 14:0814:08, 14 February 2022 diff hist +213 m 751.12 Barriers, Railings, Curbs and Fences Per BR, aligned bridge barrier and railing guidance between EPG 751.1 and 751.12.
- 13:5613:56, 14 February 2022 diff hist +1,093 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, aligned bridge barrier and railing guidance between EPG 751.1 and 751.12.
- 09:4809:48, 14 February 2022 diff hist −77 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Properties: Per BR, minor deletion associated with previous revision
10 February 2022
- 09:2109:21, 10 February 2022 diff hist +19 m Recent Policy Changes in the EPG EPG 616.13.2
- 08:3708:37, 10 February 2022 diff hist −37 m 147.3 Job Order Contracting (JOC) →147.3.11 Request to Subcontract Work (Form C-220): Per CM, updated guidance to reflect that as of Jan 3, 2022, MoDOT no longer monitors subcontractor insurance
9 February 2022
- 15:5215:52, 9 February 2022 diff hist 0 N File:616.13.2 Directions 2021.pdf No edit summary current
- 15:5115:51, 9 February 2022 diff hist 0 N File:616.13 WZ Impact 2022.xlsm No edit summary current
- 15:5115:51, 9 February 2022 diff hist +530 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.2 Interstate, Freeways and Multi-lane Roadways: Per TS, new version of the Work Zone Impact Analysis Spreadsheet and spreadsheet directions as well as adding in the smart work zone information.
- 14:3814:38, 9 February 2022 diff hist +59 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.2 Interstate, Freeways and Multi-lane Roadways: inserted link
- 14:0014:00, 9 February 2022 diff hist +2 m 237.8 Contract Time No edit summary
- 13:5113:51, 9 February 2022 diff hist +2 m 237.9 Submission of Plans and Supporting Documents updated Word Day Study to a dotx file
- 13:5013:50, 9 February 2022 diff hist −445 m Category:124 Quality Control / Quality Assurance (QC/QA) Per DE, deleted references to archaic Project Estimate Quality Assurance Report; also updated Work Day Study to a .dotx file
- 13:4613:46, 9 February 2022 diff hist −6 m Category:101 Standard Forms →Design Forms
- 13:4513:45, 9 February 2022 diff hist 0 N File:124 Work Day Study a.dotx No edit summary current
- 13:4513:45, 9 February 2022 diff hist +2 m Category:101 Standard Forms →Design Forms
- 13:4313:43, 9 February 2022 diff hist 0 m Category:101 Standard Forms →Design Forms
- 13:4113:41, 9 February 2022 diff hist 0 N File:124 Work Day Study.dotx No edit summary current
- 13:4113:41, 9 February 2022 diff hist −43 m 237.8 Contract Time updated archaic dot form to dotx
- 09:3309:33, 9 February 2022 diff hist −280 m Recent Policy Changes in the EPG EPG 242.2
- 09:2309:23, 9 February 2022 diff hist +88 m Category:242 Optional and Alternate Pavement Designs →242.2 Life Cycle Cost Adjustment (LCCA) Factor: Per Bidding, the calculation of the LCCA was clarified
8 February 2022
- 16:2716:27, 8 February 2022 diff hist +1 m Category:910 Intelligent Transportation Systems →910.2 How ITS Works
- 13:4513:45, 8 February 2022 diff hist −412 m Category:910 Intelligent Transportation Systems Per TS, moved Transportation Systems Management and Operations (TSM&O) Program and Action Plan link to EPG 909
- 12:0612:06, 8 February 2022 diff hist +289 m Category:909 Transportation Systems Management and Operations (TSMO) Per TS, moved Transportation Systems Management and Operations (TSM&O) Program and Action Plan link to EPG 909 from EPG 910
- 09:2309:23, 8 February 2022 diff hist +12 m Recent Policy Changes in the EPG EPG 238.2
- 09:1409:14, 8 February 2022 diff hist 0 N File:238.2 Exhibit A.docx No edit summary current
- 09:1409:14, 8 February 2022 diff hist −59 m 238.2 Land Surveying Per CADD Survey, minor update of Legal Description - Exhibit A to replace the term “Legal” with “Property” to comply with Code State Regulation for surveying.
7 February 2022
- 16:0116:01, 7 February 2022 diff hist −30 m 237.9 Submission of Plans and Supporting Documents updated archaic dot file form link to pdf file
- 15:3715:37, 7 February 2022 diff hist 0 N File:101 Utilities Checklist.dotx No edit summary current
- 15:3715:37, 7 February 2022 diff hist 0 N File:101 Traffic Checklist.dotx No edit summary current
- 15:3615:36, 7 February 2022 diff hist 0 N File:101 Right of Way Checklist.dotx No edit summary current
- 15:3615:36, 7 February 2022 diff hist 0 N File:101 Railroad Checklist.dotx No edit summary current
- 15:3615:36, 7 February 2022 diff hist 0 N File:101 Public Information and Outreach Checklist.dotx No edit summary current
- 15:3615:36, 7 February 2022 diff hist 0 N File:101 Planning Checklist.dotx No edit summary current
- 15:3515:35, 7 February 2022 diff hist 0 N File:101 Maintenance Checklist.dotx No edit summary current
- 15:3515:35, 7 February 2022 diff hist 0 N File:101 FHWA Checklist.dotx No edit summary current
- 15:3515:35, 7 February 2022 diff hist 0 N File:101 Construction and Materials Checklist.dotx No edit summary current
- 15:3415:34, 7 February 2022 diff hist 0 N File:101 Bridge Checklist.dotx No edit summary current
- 15:3415:34, 7 February 2022 diff hist −447 m Category:101 Standard Forms →Scoping: updated archaic .dot files to .dotx
- 13:4113:41, 7 February 2022 diff hist 0 N File:101 Public Hearing Statement Form.dotx No edit summary current
- 13:4013:40, 7 February 2022 diff hist −49 m Category:101 Standard Forms →Public Involvement: updated archaic .dot file to .dotx
- 13:2413:24, 7 February 2022 diff hist 0 N File:101 Turning Movement Traffic Count Request.dotx No edit summary current
- 13:2413:24, 7 February 2022 diff hist 0 N File:101 Fis Formc.dotx No edit summary current
- 13:2313:23, 7 February 2022 diff hist 0 N File:101 Conceptual Study Traffic Count Request.dotx No edit summary current
- 13:2313:23, 7 February 2022 diff hist 0 N File:101 ARAN Report Request.dotx No edit summary current
- 13:2313:23, 7 February 2022 diff hist +16 m Category:101 Standard Forms →Planning: updated archaic .dot files to .dotx
- 12:2512:25, 7 February 2022 diff hist 0 N File:101 Soil Survey Request.dotx No edit summary current
- 12:2412:24, 7 February 2022 diff hist 0 N File:101 Soil Info Request.dotx No edit summary current
- 12:2412:24, 7 February 2022 diff hist 0 N File:101 Request for Asphalt Cement % Grade.dotx No edit summary current
- 12:2312:23, 7 February 2022 diff hist +10 m Category:101 Standard Forms →Materials: updated archaic .dot files to .dotx