User contributions for Smithk
Jump to navigation
Jump to search
23 July 2018
- 13:1113:11, 23 July 2018 diff hist 0 File:104.11 Completed SIMS form.pdf Smithk uploaded a new version of File:104.11 Completed SIMS form.pdf current
8 March 2017
- 11:1611:16, 8 March 2017 diff hist +148 m Main Page EPG 751.22
- 11:1111:11, 8 March 2017 diff hist +522 m 751.22 Prestressed Concrete I Girders →751.22.2.2 Prestressing Strands: Per BR, new guidance to align NU top flange, straight & harped prestressing strands, when possible, in NU prestressed girders to aid fabricating flange blockouts
- 10:2710:27, 8 March 2017 diff hist +96 m Main Page EPG 751.1.2
- 10:2610:26, 8 March 2017 diff hist +79 m 751.1 Preliminary Design →751.1.2 Bridges/Boxes: inserted links
- 09:4009:40, 8 March 2017 diff hist +257 m 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per BR, expanded and clarified bridge approach slabs requirements for Bridge Memo and the Design Layout.
- 08:0608:06, 8 March 2017 diff hist −2 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
7 March 2017
- 11:2511:25, 7 March 2017 diff hist +402 m Main Page EPG 751
- 10:3710:37, 7 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.3 Encased Pile Cap Bent
- 10:3710:37, 7 March 2017 diff hist 0 N File:751.32.3.3 part section.jpg No edit summary current
- 10:3710:37, 7 March 2017 diff hist 0 N File:751.32.3.3 part elev.jpg No edit summary current
- 10:3610:36, 7 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2.1 Sway Bracing
- 10:3610:36, 7 March 2017 diff hist 0 N File:751.32.3.2.1 alternate.jpg No edit summary current
- 10:3510:35, 7 March 2017 diff hist 0 N File:751.32.3.2.1 steel bearing.jpg No edit summary current
- 10:3510:35, 7 March 2017 diff hist +5 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 10:3410:34, 7 March 2017 diff hist 0 N File:751.32 circled 7.gif No edit summary current
- 10:3410:34, 7 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 10:3310:33, 7 March 2017 diff hist 0 N File:751.32.3.2.jpg No edit summary current
- 10:3310:33, 7 March 2017 diff hist −109 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3 Details: Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 09:5009:50, 7 March 2017 diff hist +383 m 751.36 Driven Piles →751.36.2 Steel Pile: Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 09:1909:19, 7 March 2017 diff hist +6 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 09:1309:13, 7 March 2017 diff hist +18 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 08:5108:51, 7 March 2017 diff hist +3,117 m 751.50 Standard Detailing Notes Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
6 March 2017
- 12:0312:03, 6 March 2017 diff hist +660 m 751.6 General Quantities Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 11:5711:57, 6 March 2017 diff hist +50 m 751.5 Structural Detailing Guidelines →751.5.1.3.1 Abbreviations: Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 11:5411:54, 6 March 2017 diff hist +3,579 m 751.1 Preliminary Design Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
3 March 2017
- 15:0315:03, 3 March 2017 diff hist −98 m 616.22 Advanced Work Zone Training Per CM and TS, removed references of training courses to coordinate with Sec 616
- 14:2414:24, 3 March 2017 diff hist 0 m Main Page No edit summary
2 March 2017
- 15:4315:43, 2 March 2017 diff hist −3 m 751.10 General Superstructure →751.10.4 Conduit Systems: minor correction
- 13:5313:53, 2 March 2017 diff hist −3 m Main Page No edit summary
1 March 2017
- 14:3914:39, 1 March 2017 diff hist 0 N File:1040.2 Guardrail Inspection Guide.docx No edit summary current
- 14:3814:38, 1 March 2017 diff hist 0 N File:1040.2 Guardrail Inspection.ppt No edit summary current
- 14:3814:38, 1 March 2017 diff hist +224 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material Per CM, added links to a PowerPoint, a guide document and checklist for guardrail inspection.
- 12:1412:14, 1 March 2017 diff hist +80 m 751.10 General Superstructure →751.10.4 Conduit Systems: Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 12:1112:11, 1 March 2017 diff hist +18 m 751.8 Concrete Box Culverts Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 12:1012:10, 1 March 2017 diff hist +18 m 751.5 Structural Detailing Guidelines →751.5.9.2.7 Length Calculations: Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
28 February 2017
- 14:3014:30, 28 February 2017 diff hist +13 m 751.12 Barriers, Railings, Curbs and Fences →751.12.1.1 Standard Safety Barrier Curbs used in Missouri: Per BR, corrected TL level for the Type D Std Safety Barrier Curb
- 14:2314:23, 28 February 2017 diff hist 0 N File:Main Page February 28, 2017.jpg No edit summary current
- 14:2214:22, 28 February 2017 diff hist +34 m Main Page No edit summary
27 February 2017
- 16:2316:23, 27 February 2017 diff hist 0 N File:616.8.50 Feb 27 2017.pdf No edit summary
- 16:2316:23, 27 February 2017 diff hist +6 m 616.8 Typical Applications (MUTCD 6H) Per TS and CM, further clarification of TA 50
- 15:4015:40, 27 February 2017 diff hist 0 m Main Page No edit summary
- 14:2614:26, 27 February 2017 diff hist +13 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.3 WORK ZONE NO PHONE ZONE Sign: Per TS and CM, clarification of placement of the WZ No Phone sign
- 14:2214:22, 27 February 2017 diff hist 0 N File:616.8.50 Feb 2017.pdf No edit summary current
- 14:2214:22, 27 February 2017 diff hist +8 m 616.8 Typical Applications (MUTCD 6H) Per TS and CM, clarification of TA 50
- 13:0613:06, 27 February 2017 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:0811:08, 27 February 2017 diff hist +2 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:0811:08, 27 February 2017 diff hist −1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:0711:07, 27 February 2017 diff hist +28 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign: inserted link
- 11:0611:06, 27 February 2017 diff hist +45 m 616.8 Typical Applications (MUTCD 6H) inserted link