User contributions for Smithk
Jump to navigation
Jump to search
13 January 2017
- 08:5008:50, 13 January 2017 diff hist +23 m Category:101 Standard Forms Per BR, updated Structural Rehabilitation Checklist
- 08:4908:49, 13 January 2017 diff hist +46 m 751.1 Preliminary Design Per BR, updated Structural Rehab Checklist
- 08:4808:48, 13 January 2017 diff hist +46 m Category:747 Bridge Reports and Layouts Per BR, updated Structural Rehab Checklist
- 08:3708:37, 13 January 2017 diff hist −60 m 236.8 Relocation Assistance Program Per RW, updated Actual Cost Self Moves Form 236.8.7.8F
12 January 2017
- 14:4714:47, 12 January 2017 diff hist 0 N File:756 flow chart.pdf No edit summary
- 14:4714:47, 12 January 2017 diff hist −158 m Category:756 Seismic Design Per BR, updated flow chart
- 13:1613:16, 12 January 2017 diff hist −6 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, minor revision to abbreviations
- 13:1513:15, 12 January 2017 diff hist −6 m 751.5 Structural Detailing Guidelines →751.5.1.3.1 Abbreviations: Per BR, minor revision to abbreviations
- 13:0713:07, 12 January 2017 diff hist +47 m 643.2 Local Utility Adjustments - Public and Private No edit summary
- 13:0613:06, 12 January 2017 diff hist +94 m Category:124 Quality Control / Quality Assurance (QC/QA) No edit summary
- 13:0513:05, 12 January 2017 diff hist +94 m 237.9 Submission of Plans and Supporting Documents No edit summary
- 13:0413:04, 12 January 2017 diff hist +47 m Category:101 Standard Forms →Checklist
- 08:2208:22, 12 January 2017 diff hist 0 N File:237.9 D-12 2017.docx No edit summary
- 08:2208:22, 12 January 2017 diff hist −47 m Category:101 Standard Forms Per Bidding and Contract, updated D-12
- 08:2108:21, 12 January 2017 diff hist −47 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Contract, updated D-12
- 08:2008:20, 12 January 2017 diff hist −94 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Contracting, updated D-12
- 08:1908:19, 12 January 2017 diff hist −94 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Contracts, updated D-12
11 January 2017
- 16:0816:08, 11 January 2017 diff hist +87 m Main Page EPG 171.2.4
- 15:4815:48, 11 January 2017 diff hist +293 m 171.2 Buildings and Grounds →B&G(D2) Weigh Station Obligations: Per MT, changed maintenance responsibilities for weigh stations because of new MOU with MSHP current
10 January 2017
- 13:5213:52, 10 January 2017 diff hist −752 m 153.5 Bridge Per BR, BR14 is no longer a standard agreement. Updated BR10's title and description when it is to be used
6 January 2017
- 15:3615:36, 6 January 2017 diff hist −469 m Main Page No edit summary
5 January 2017
- 13:5313:53, 5 January 2017 diff hist 0 m Main Page No edit summary
- 11:5711:57, 5 January 2017 diff hist 0 m 751.13 Expansion Joint Systems No edit summary
- 09:5209:52, 5 January 2017 diff hist +94 m Category:124 Quality Control / Quality Assurance (QC/QA) updated D-12 links
- 09:5009:50, 5 January 2017 diff hist +94 m 237.9 Submission of Plans and Supporting Documents updated D-12 links
- 09:2509:25, 5 January 2017 diff hist +350 m LPA:136.13 LPA Policy Changes EPG 136.4.1.5
- 09:2109:21, 5 January 2017 diff hist +247 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1.5 Consultant Qualification: Per LPA, a firm is not required to submit a cert. of auth. to become prequalified when it does work outside the jurisdiction of the MO Board for APEPLSPLA.
- 09:1509:15, 5 January 2017 diff hist +13 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, minor clarification
4 January 2017
- 14:5914:59, 4 January 2017 diff hist +296 m LPA:136.13 LPA Policy Changes EPG 136.6.4.8
- 14:5514:55, 4 January 2017 diff hist +1,221 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.8 Stormwater and Erosion Control: Per LPA, minor revisions based on new stormwater permit
- 12:2112:21, 4 January 2017 diff hist +94 m Main Page EPG 134.1.3
- 12:1612:16, 4 January 2017 diff hist +221 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, a firm is not required to submit a cert. of auth. to become prequalified when it does work outside the jurisdiction of the MO Board for APEPLSPLA.
- 11:5811:58, 4 January 2017 diff hist −164 m Main Page EPG 756
- 11:5411:54, 4 January 2017 diff hist +473 m Category:756 Seismic Design Per BR, revised the Bridge seismic design process flowchart.
3 January 2017
- 09:2109:21, 3 January 2017 diff hist +50 m 153.23 Utility No edit summary
- 09:2009:20, 3 January 2017 diff hist +50 m 153.22 Transportation Planning No edit summary
- 09:2009:20, 3 January 2017 diff hist +50 m 153.21 Traffic No edit summary
- 09:1909:19, 3 January 2017 diff hist +50 m 153.20 Right of Way No edit summary
- 09:1909:19, 3 January 2017 diff hist +50 m 153.19 Multimodal No edit summary
- 09:1909:19, 3 January 2017 diff hist +50 m 153.18 Motor Carrier Services No edit summary
- 09:1809:18, 3 January 2017 diff hist +50 m 153.17 Medical Board Employee Benefits No edit summary
- 09:1809:18, 3 January 2017 diff hist +50 m 153.16 Maintenance No edit summary
- 09:1809:18, 3 January 2017 diff hist +50 m 153.15 Information Systems No edit summary
- 09:1709:17, 3 January 2017 diff hist +50 m 153.14 Human Resources No edit summary
- 09:1709:17, 3 January 2017 diff hist +50 m 153.13 Highway Safety No edit summary
- 09:1609:16, 3 January 2017 diff hist +50 m 153.12 General Services No edit summary
- 09:1609:16, 3 January 2017 diff hist +50 m 153.11 Financial Services No edit summary
- 09:1609:16, 3 January 2017 diff hist +50 m 153.10 Design – Escrow No edit summary
- 09:1509:15, 3 January 2017 diff hist +50 m 153.9 Design No edit summary
- 09:1509:15, 3 January 2017 diff hist +50 m 153.8 Customer Relations No edit summary