User contributions for Smithk
Jump to navigation
Jump to search
22 September 2016
- 14:3014:30, 22 September 2016 diff hist 0 N File:616.14.10 Rte 50.pdf No edit summary current
- 14:2914:29, 22 September 2016 diff hist +255 m 616.14 Work Zone Safety and Mobility Policy →616.14.10 Transportation Management Plan: Per CM, added two TMP examples
- 14:1414:14, 22 September 2016 diff hist +68 m 751.50 Standard Detailing Notes →A4a1. Steel Structures- Nonweathering Steel: Per BR, clarification by boxing the guidance
- 12:3612:36, 22 September 2016 diff hist −3 m Category:617 Traffic Barrier Per BR, minor correction
- 12:3512:35, 22 September 2016 diff hist −3 m 611.3 Concrete Slope Protection →611.3.2 Construction Inspection (Sec 611.60.3): Per BR, minor correction
- 12:3412:34, 22 September 2016 diff hist −3 m 620.5 Delineators (MUTCD Chapter 3F) →620.5.6 Barrier Wall Delineation: Per BR, minor correction
- 12:3312:33, 22 September 2016 diff hist −3 m 620.5 Delineators (MUTCD Chapter 3F) →620.5.5 Guardrail Delineation: Per BR, minor correction
- 12:3212:32, 22 September 2016 diff hist −3 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.1 Measurement for Payment: Per BR, minor correction
- 12:3112:31, 22 September 2016 diff hist −24 m 751.50 Standard Detailing Notes Per BR, minor correction
- 10:5310:53, 22 September 2016 diff hist −13 m Main Page EPG 109.1
- 10:3210:32, 22 September 2016 diff hist +264 m Category:109 Measurement and Payment →109.1 Measurement of Quantities (for Sec 109.1): Per CM, guidance about measuring quantities was clarified. Current guidance no longer exceeds the degree of accuracy requried by the specs or JSPs
- 09:3509:35, 22 September 2016 diff hist −38,199 m 751.5 Structural Detailing Guidelines Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:3108:31, 22 September 2016 diff hist −3,765 m 751.40 LFD Widening and Repair Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:2208:22, 22 September 2016 diff hist 0 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 08:2108:21, 22 September 2016 diff hist −560 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:1908:19, 22 September 2016 diff hist −468 m 751.35 Concrete Pile Cap Integral End Bents →751.35.5.2 Vertical Drains: Per BR, replaced outdated details with links to the internet
- 08:1408:14, 22 September 2016 diff hist +431 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.4 Exploded View of the End Bent: New EPG 751.34.3.5 (links to the internet in lieu of adding duplicate table)
- 08:1208:12, 22 September 2016 diff hist −1,488 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:0808:08, 22 September 2016 diff hist −4,294 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Devices - Details: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:0608:06, 22 September 2016 diff hist −782 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail (Top Mounted) TL-4 (NCHRP 350): Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:0108:01, 22 September 2016 diff hist −3,379 m 751.10 General Superstructure Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 07:5207:52, 22 September 2016 diff hist −1,483 m Category:503 Bridge Approach Slabs Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
15 September 2016
- 13:0213:02, 15 September 2016 diff hist 0 N File:Main Page September 15, 2016.jpg No edit summary current
- 13:0213:02, 15 September 2016 diff hist −184 m Main Page EPG 903
- 10:2210:22, 15 September 2016 diff hist −40 m 153.9 Design CCO renumbered the contracts. New links needed.
- 09:2709:27, 15 September 2016 diff hist +181 m 153.7 Construction and Materials CCO renumbered the contracts. New links needed.
- 09:0809:08, 15 September 2016 diff hist −46 m 153.5 Bridge CCO renumbered the contracts. New links needed.
- 08:3608:36, 15 September 2016 diff hist −1,027 m 903.3 Ground-Mounted Sign Supports Per TS, revisions bring guidance into conformance with recent standard plan and policy changes.
- 08:2108:21, 15 September 2016 diff hist +741 m 903.2 Extent of Signing →903.2.12 Quantity Computations: Per TS, revisions bring guidance into conformance with recent standard plan and policy changes.
14 September 2016
- 13:5213:52, 14 September 2016 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements No edit summary
- 10:3410:34, 14 September 2016 diff hist −199 m Main Page EPG 110.3
- 08:0408:04, 14 September 2016 diff hist +397 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, guidance updated to comply with the e-Construction JSP.
- 07:2007:20, 14 September 2016 diff hist +26 m 903.6 Warning Signs →903.6.33 LANE END Signs (W4-2, W9-1, W9-2) (MUTCD Section 2C.42): Per TS, clarification of the use of Lane Ends sign
13 September 2016
- 11:2911:29, 13 September 2016 diff hist +87 m Category:101 Standard Forms No edit summary
- 11:2811:28, 13 September 2016 diff hist +87 m 616.26 Work Zone User Training Per TS, updated WZ Inspection Form link
- 11:2711:27, 13 September 2016 diff hist +87 m Category:101 Standard Forms →Construction and Materials: Per TS, updated WZ Inspection Form link
- 11:0011:00, 13 September 2016 diff hist −2 m Main Page No edit summary
- 10:2410:24, 13 September 2016 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.1 Payments/Invoicing
- 10:1110:11, 13 September 2016 diff hist +54 m Category:101 Standard Forms Per TS, updated WZ Inspection Form links
- 10:1010:10, 13 September 2016 diff hist +27 m 616.26 Work Zone User Training Per TS, updated WZ Inspection Form link
9 September 2016
- 14:3614:36, 9 September 2016 diff hist 0 m Main Page No edit summary
8 September 2016
- 14:4414:44, 8 September 2016 diff hist 0 m Main Page No edit summary
7 September 2016
- 15:1015:10, 7 September 2016 diff hist −211 m Category:747 Bridge Reports and Layouts →747.1.3.5 Valley/Channel Section Sheets: Per BR, rvision brings guidance into line with related changes previously completed in EPG 238.3.36.3.6.
- 15:0715:07, 7 September 2016 diff hist −247 m 750.3 Bridges →750.3.2.5.2 Contraction Scour: Per BR, irrelevant paragraph removed
- 13:1913:19, 7 September 2016 diff hist +42 m 236.8 Relocation Assistance Program Per RW, updated link to Form 236.8.9.4.8, Replacement Housing Claim (Form 236.8.9.4(b))
- 12:5712:57, 7 September 2016 diff hist 0 N File:Main Page September 7, 2016.jpg No edit summary current
- 12:5712:57, 7 September 2016 diff hist +65 m Main Page No edit summary
- 07:2407:24, 7 September 2016 diff hist +35 m LPA:136.12 Figures, Glossary and Other Useful Links updated link to Form 136.8.7.1.11
- 07:1907:19, 7 September 2016 diff hist +35 m LPA:136.13 LPA Policy Changes No edit summary
- 07:1807:18, 7 September 2016 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition No edit summary