User contributions for Smithk
Jump to navigation
Jump to search
14 August 2015
- 07:4707:47, 14 August 2015 diff hist +32 m Category:151 Administrative Rule Creation or Modification Process added photo
13 August 2015
- 14:5014:50, 13 August 2015 diff hist −218 m LPA:136.9 Plans, Specs and Estimates (PSE) Updated the numerous 23 CFR 635 links
- 12:2612:26, 13 August 2015 diff hist −511 m Category:145 Transportation Management Systems (TMS) Per TP, updated links to TMS
- 12:2412:24, 13 August 2015 diff hist +1 m Category:145 Transportation Management Systems (TMS) No edit summary
12 August 2015
- 14:5814:58, 12 August 2015 diff hist +33 m 751.37 Drilled Shafts →Table 751.37.1.1 Summary of drilled shaft dimensions with minimum and maximum values
- 14:4114:41, 12 August 2015 diff hist +1 m 751.37 Drilled Shafts →Table 751.37.1.1 Summary of drilled shaft dimensions with minimum and maximum values: Per BR, correction of "inside" to "outside" diameter. This was overlooked in a previous revision.
- 11:1411:14, 12 August 2015 diff hist 0 N File:Main Page 4 Aug 12, 2015.jpg No edit summary current
- 11:1411:14, 12 August 2015 diff hist 0 N File:Main Page 3 Aug 12, 2015.jpg No edit summary current
- 11:1411:14, 12 August 2015 diff hist 0 N File:Main Page 2 Aug 12, 2015.jpg No edit summary current
- 11:1411:14, 12 August 2015 diff hist 0 N File:Main Page Aug 12, 2015.jpg No edit summary current
- 11:1311:13, 12 August 2015 diff hist +133 m Main Page new photos
- 10:5710:57, 12 August 2015 diff hist +2 m Category:200 GEOMETRICS No edit summary
- 10:5610:56, 12 August 2015 diff hist 0 N File:200 design.jpg No edit summary current
- 10:5610:56, 12 August 2015 diff hist +37 m Category:200 GEOMETRICS added photo
- 09:0609:06, 12 August 2015 diff hist +249 m Category:1029 Fabricating Prestressed Concrete Members for Bridges →1029.2.1 Materials: Per CM Physical Lab, clarified guidance by adding that ASTM A706 steel can be substituted for Gr 40/60
11 August 2015
- 07:4407:44, 11 August 2015 diff hist +58 m Main Page EPG 109.12
- 07:3007:30, 11 August 2015 diff hist +1,057 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per Envir'l, the EPA mandates the Stormwater Compliance and Environmental Specialist be able to execute change orders up to $100000 for erosion control items
10 August 2015
- 13:0513:05, 10 August 2015 diff hist −2 m Main Page No edit summary
7 August 2015
- 13:5313:53, 7 August 2015 diff hist +15 m Main Page No edit summary
- 13:4713:47, 7 August 2015 diff hist +98 m Main Page EPG 606.1.3.1
- 13:4313:43, 7 August 2015 diff hist +544 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Per EPG, requires replacement of ET-Plus end treatment during constr'n or repair, including anytime existing adjacent guardrail is raised or end treatment modified
6 August 2015
- 08:0208:02, 6 August 2015 diff hist +34 m 751.4 Reinforced Concrete Design Properties →751.4.1 Reinforced Concrete: Per BR, added non-integral end bents to the list of concrete classes
- 07:5407:54, 6 August 2015 diff hist 0 N File:Main Page Aug 6, 2015.jpg No edit summary current
- 07:5407:54, 6 August 2015 diff hist +249 m Main Page EPG 751
- 07:1307:13, 6 August 2015 diff hist −274 m 751.6 General Quantities Per BR, concrete coring coring of drilled shafts was removed because it is no longer specified on a set of bridge plans for integrity testing of drilled shafts.
- 07:1007:10, 6 August 2015 diff hist −180 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, concrete coring coring of drilled shafts removed because it is no longer specified on bridge plans for integrity testing of drilled shafts.
- 07:0807:08, 6 August 2015 diff hist −205 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, concrete coring coring of drilled shafts was removed because it is no longer specified on a set of bridge plans for integrity testing of drilled shafts.
5 August 2015
- 08:3608:36, 5 August 2015 diff hist +47 m 236.17 Junkyards Per RW, updated Controlled Travelways Map
- 07:1707:17, 5 August 2015 diff hist +18 m 236.7 Negotiation updated link
4 August 2015
- 08:4308:43, 4 August 2015 diff hist +3 m Main Page No edit summary
31 July 2015
- 10:3110:31, 31 July 2015 diff hist −10 m Main Page No edit summary
- 10:3110:31, 31 July 2015 diff hist 0 N File:Main Page July 31, 2015.jpg No edit summary current
- 10:3010:30, 31 July 2015 diff hist −18 m Main Page EPG 234.2
- 09:4709:47, 31 July 2015 diff hist +282 m 234.2 Diamond Interchanges →234.2.1.1 Ramp and Preliminary Plan Criteria: added clarifying note
- 09:3009:30, 31 July 2015 diff hist 0 N File:234.2.1.1 Diamond Interchange.pdf No edit summary current
- 09:3009:30, 31 July 2015 diff hist +597 m 234.2 Diamond Interchanges Per Design, updated 700' dimension between ramp termini in the conventional diamond to 800' to reflect FHWA guidance
30 July 2015
- 14:3614:36, 30 July 2015 diff hist 0 m Main Page No edit summary
29 July 2015
- 12:3412:34, 29 July 2015 diff hist −37 m Main Page No edit summary
- 12:3212:32, 29 July 2015 diff hist 0 N File:Main Page July 29, 2015.jpg No edit summary current
- 12:3112:31, 29 July 2015 diff hist +312 m Main Page No edit summary
- 07:1207:12, 29 July 2015 diff hist 0 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.10 Approach Markings for Obstructions (MUTCD Section 3B.10)
- 07:1207:12, 29 July 2015 diff hist 0 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.10 Approach Markings for Obstructions (MUTCD Section 3B.10)
27 July 2015
- 14:3514:35, 27 July 2015 diff hist 0 m Main Page No edit summary
- 13:3913:39, 27 July 2015 diff hist +395 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.5
- 13:3713:37, 27 July 2015 diff hist −60 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.5 Suspension and Debarment Certification (23 CFR 635.112): Per LPA, replaced outdated link with a new, useful one
- 09:4109:41, 27 July 2015 diff hist +62 N 751.40 Widening and Repair (Non-LFD) 751.40 Widening and Repair (Non-LFD) moved to 751.40 Widening and Repair (LFD and Not Updated): New title requested by BR current
- 09:4109:41, 27 July 2015 diff hist 0 m 751.40 LFD Widening and Repair 751.40 Widening and Repair (Non-LFD) moved to 751.40 Widening and Repair (LFD and Not Updated): New title requested by BR
- 09:1609:16, 27 July 2015 diff hist 0 m 751.40 LFD Widening and Repair →751.40.2.5 Temporary Traffic Control Device: Per BR, updated link
- 09:1409:14, 27 July 2015 diff hist +89 m 751.1 Preliminary Design →751.1.2.11 Temporary Barriers: Per BR, an update that was inadvertently not included in a 2012 revision. Revised guidance for bolt-through-deck when lateral deflection cannot be tolerated.
24 July 2015
- 11:2911:29, 24 July 2015 diff hist −9 m Category:1113 Double Boiled Linseed Oil and Mineral Spirits Per BR, clarification