User contributions for Smithk
Jump to navigation
Jump to search
13 January 2015
- 12:2812:28, 13 January 2015 diff hist +10 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.9 Details of Mounting Light Poles on Safety Barrier Curbs: Per Bridge, updated ASTM reference
12 January 2015
- 16:1416:14, 12 January 2015 diff hist 0 N File:Main Page Jan 12, 2015.jpg No edit summary current
- 16:1416:14, 12 January 2015 diff hist +117 m Main Page No edit summary
- 14:2214:22, 12 January 2015 diff hist 0 m Category:239 Construction Inspection Guidelines for Final Plans →239.10.1 Pay Quantity (DWR) Entries: Per CM, clarified one step in the Daily Work Reports QRG
- 14:2114:21, 12 January 2015 diff hist 0 m Category:105 Control of Work →105.9.3 Daily Work Reports: Per CM, clarified one step in the Daily Work Reports QRG
- 14:2014:20, 12 January 2015 diff hist 0 N File:Daily Work Reports 2015.docx No edit summary current
- 14:2014:20, 12 January 2015 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, clarified one step in the Daily Work Reports QRG
- 08:1008:10, 12 January 2015 diff hist +67 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, clarification of "checking 50% of the payrolls" in Item 7 Rate of Pay
9 January 2015
- 14:1814:18, 9 January 2015 diff hist 0 N File:Main Page Jan 9, 2015.jpg No edit summary current
- 14:1814:18, 9 January 2015 diff hist +293 m Main Page No edit summary
- 14:0114:01, 9 January 2015 diff hist 0 N File:110.3.1 wage interview.pdf No edit summary
- 14:0114:01, 9 January 2015 diff hist 0 N File:110.2 checklist 2015.pdf No edit summary
- 14:0114:01, 9 January 2015 diff hist −32 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, update of two forms: jobsite checklist and the wage interview
- 13:5513:55, 9 January 2015 diff hist 0 N File:146 CUF 2015.pdf No edit summary
- 13:5513:55, 9 January 2015 diff hist 0 m Category:146 Disadvantaged Business Enterprise (DBE) Per CM, update of CUF
8 January 2015
- 14:3614:36, 8 January 2015 diff hist 0 N File:Main Page Jan 8, 2015.jpg No edit summary current
- 14:3514:35, 8 January 2015 diff hist −140 m Main Page EPG 121.3
- 14:1314:13, 8 January 2015 diff hist +65 m 121.3 The Statewide Transportation Improvement Program (STIP) added link
- 14:0714:07, 8 January 2015 diff hist +216 m 121.3 The Statewide Transportation Improvement Program (STIP) Per Asst. Chief Engineer, documentation clarification
- 13:3713:37, 8 January 2015 diff hist +144 m LPA:136.13 LPA Policy Changes Fig 136.9.3
- 13:3513:35, 8 January 2015 diff hist −4 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated Fig 136.9.3 with the new link to the ADA checklist
- 13:3513:35, 8 January 2015 diff hist 0 N File:136.9.3 2015.doc No edit summary
- 13:3413:34, 8 January 2015 diff hist −28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated Fig 136.9.3 with the new link to the ADA checklist
- 13:0113:01, 8 January 2015 diff hist 0 N File:101 Precon letter, state 2015.docx No edit summary
- 13:0113:01, 8 January 2015 diff hist 0 N File:101 Precon letter, federal 2015.docx No edit summary
- 13:0113:01, 8 January 2015 diff hist 0 N File:101 Precon letter, federal no trainees 2015.docx No edit summary
- 13:0013:00, 8 January 2015 diff hist −3 m Category:101 Standard Forms →Construction and Materials: Per CM, updated three forms for Preconference letters
7 January 2015
- 15:5515:55, 7 January 2015 diff hist 0 m Main Page No edit summary
- 10:1510:15, 7 January 2015 diff hist −9 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): minor correction
- 10:1210:12, 7 January 2015 diff hist −419 m Main Page QRG Change Orders – Mobilization and Contract Bond
- 08:5008:50, 7 January 2015 diff hist 0 m Category:109 Measurement and Payment Per CM, QRG Change Orders – Mobilization & Contract Bond updated. Our new agreement with FHWA eliminates the need to send any Level 1 or 2 change orders to FHWA for review.
- 08:4808:48, 7 January 2015 diff hist 0 N File:Change Orders – Mobilization and Contract Bond 2015.docx No edit summary
- 08:4808:48, 7 January 2015 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, QRG Change Orders – Mobilization & Contract Bond updated. New FHWA agreement eliminates the need to send Level 1 or 2 change orders to FHWA for review
6 January 2015
- 16:2216:22, 6 January 2015 diff hist 0 N File:Main Page Jan 6, 2015.jpg No edit summary current
- 16:2116:21, 6 January 2015 diff hist +84 m Main Page EPG 109.12
- 15:5915:59, 6 January 2015 diff hist 0 N File:109.12 Truth Table 2015.docx No edit summary
- 15:5915:59, 6 January 2015 diff hist −593 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per CM, revised to conform with new change order approval criteria reducing number of change orders reviewed by FHWA and to improve the process's efficiency
- 15:2315:23, 6 January 2015 diff hist +11 m 236.8 Relocation Assistance Program →236.8.1.1 Applicability of the Relocation Program: Per RW, updated link
- 10:5010:50, 6 January 2015 diff hist 0 m 751.50 Standard Detailing Notes →H11. Miscellaneous: Per Bridge, minor clarification
5 January 2015
- 15:5615:56, 5 January 2015 diff hist +1 m Main Page No edit summary
2 January 2015
- 16:2616:26, 2 January 2015 diff hist +16 m Category:903 Highway Signing →MoDOT 5-Year Plan for Signing – Practical Operations: updated links
- 13:1213:12, 2 January 2015 diff hist −502 m Main Page EPG 751.37
- 12:2612:26, 2 January 2015 diff hist 0 N File:751.37.1.1 Design Aid.pdf No edit summary current
- 12:2512:25, 2 January 2015 diff hist +522 m 751.37 Drilled Shafts Per Bridge, clarified minimum rock socket length requirements.
31 December 2014
- 13:2413:24, 31 December 2014 diff hist 0 N File:Main Page Dec 31, 2014.jpg No edit summary current
- 13:2413:24, 31 December 2014 diff hist −40 m Main Page No edit summary
- 11:5111:51, 31 December 2014 diff hist +25 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per Bridge, clarified guidance
- 10:0510:05, 31 December 2014 diff hist +4 m LPA:136.13 LPA Policy Changes No edit summary
- 08:4608:46, 31 December 2014 diff hist +535 m LPA:136.13 LPA Policy Changes EPG 136.7.3.1.2.1.10 and Fig. 136.9.3
- 08:3808:38, 31 December 2014 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated Fig 136.9.3 Federal Project Bid Proposal Boilerplate to add reference to new JSPs: LD's Specified for Winter Months and Safety Requirements