User contributions for Smithk
Jump to navigation
Jump to search
1 July 2014
- 13:5013:50, 1 July 2014 diff hist +433 m Main Page EPG 109.8
- 12:4012:40, 1 July 2014 diff hist +1,893 m Category:109 Measurement and Payment →109.8 Final Acceptance and Payment (for Sec 109.8): Per CM, provided guidance reflecting existing C-242 practice
- 12:3012:30, 1 July 2014 diff hist −223 m Category:134 Engineering Professional Services →134.2.1 Professional Services Committee (PSC): Per Bridge and Design, clarified the PSC's potential membership
30 June 2014
- 13:3313:33, 30 June 2014 diff hist 0 m Category:127 MoDOT and the Environment No edit summary
- 13:3113:31, 30 June 2014 diff hist +22 m 127.1 Request for Environmental Services updated link
- 12:3212:32, 30 June 2014 diff hist −217 m 616.5 Flagger Control (MUTCD Chapter 6E) →616.5.2 High-Visibility Safety Apparel (MUTCD 6E.02): Updated PPE link
- 12:1712:17, 30 June 2014 diff hist +8 m 903.4 Overhead Sign Mounting →903.4.1 Overhead Sign Installations (MUTCD Section 2A.17)
- 12:1612:16, 30 June 2014 diff hist −29 m 903.4 Overhead Sign Mounting new photo
- 12:1512:15, 30 June 2014 diff hist 0 N File:903.4.jpg No edit summary current
- 10:5810:58, 30 June 2014 diff hist +344 m Main Page EPG 127.1
- 10:1810:18, 30 June 2014 diff hist +273 m Category:128 Conceptual Studies Per Environmental, updated RES form and associated instructions
- 10:1510:15, 30 June 2014 diff hist +290 m 127.1 Request for Environmental Services Per Environmental, updated RES form and instructions
- 08:3508:35, 30 June 2014 diff hist +1 m Category:703 Concrete Masonry Construction →703.2.9 Curing: minor correction, per Bridge
- 07:3707:37, 30 June 2014 diff hist +113 m 748.7 Bridge Reports and Layouts →748.7.3.9.4 GEO File (Stream Crossings): Per Brdige, additional guidance for profile stationing
27 June 2014
- 08:0908:09, 27 June 2014 diff hist 0 N File:Main Page 2 June 27, 2014.jpg No edit summary current
- 08:0908:09, 27 June 2014 diff hist 0 N File:Main Page June 27, 2014.jpg No edit summary current
- 08:0808:08, 27 June 2014 diff hist −678 m Main Page new photos
- 07:3107:31, 27 June 2014 diff hist −6 m 751.50 Standard Detailing Notes →A2. Concrete Box Culverts and Other Type Structures: Per Bridge, minor clarification to A2.16
- 07:2907:29, 27 June 2014 diff hist +410 m 751.1 Preliminary Design Per Bridge, several minor clarifications
- 07:2007:20, 27 June 2014 diff hist +177 m 750.7 Non-Hydraulic Considerations →750.7.11.1 Minimum Fill Heights: Per Bridge, added link as part of clarification
26 June 2014
- 09:2409:24, 26 June 2014 diff hist +7 m 127.29 Stormwater →127.29.5 Post Construction Runoff
- 09:0609:06, 26 June 2014 diff hist −51 m Main Page EPG 129.27
- 08:4408:44, 26 June 2014 diff hist +6,312 m 127.29 Stormwater Per Environmental, clarified existing guidance
- 07:2607:26, 26 June 2014 diff hist 0 m 127.29 Stormwater 127.29 Stormwater moved to 127.29 Storm Water: Environemental's preference is "storm water" instead of "stormwater"
25 June 2014
- 15:2115:21, 25 June 2014 diff hist −180 m Main Page EPG 110.3
- 15:1815:18, 25 June 2014 diff hist +218 m Category:110 State and Federal Wage Rates and Other Requirements →Owner-Operator: Per CM, a clarification on what is requiree before an RE can approve this owner-operator arrangement.
- 14:4014:40, 25 June 2014 diff hist 0 m Main Page No edit summary
- 11:3311:33, 25 June 2014 diff hist −10 m Environmental Studies Per Environmental, updated Storm Water Management Plan
- 11:2911:29, 25 June 2014 diff hist 0 N File:127.29 SWMP 2014.pdf No edit summary
- 11:2911:29, 25 June 2014 diff hist −26 m 127.29 Stormwater Per Environmental, updated Storm Water Management Plan
24 June 2014
- 15:0515:05, 24 June 2014 diff hist 0 m 751.1 Preliminary Design →Common Bridge Rails (for Rehabilitations)
- 15:0515:05, 24 June 2014 diff hist 0 N File:751.1.3.4 thrie.jpg No edit summary current
- 15:0415:04, 24 June 2014 diff hist 0 m 751.1 Preliminary Design →Common Bridge Rails (for Rehabilitations): Per Bridge, updated photo
- 13:5413:54, 24 June 2014 diff hist 0 m 236.5 Property Management Per CCO, updated RW4 contract link
- 10:3510:35, 24 June 2014 diff hist +14 m Category:122 Aviation updated Aeronautical Chart link
- 10:2210:22, 24 June 2014 diff hist 0 N File:Main Page June 24, 2014.jpg No edit summary current
- 10:2210:22, 24 June 2014 diff hist +441 m Main Page new photo
23 June 2014
- 10:5210:52, 23 June 2014 diff hist +68 m Main Page EPG 703.2.8
- 10:5110:51, 23 June 2014 diff hist +226 m Category:703 Concrete Masonry Construction →703.2.8 Concrete Placement: Per Bridge and CM, guidance about pouring backwalls and associated construction joints conforming with the roadway crown was clarified
- 10:2210:22, 23 June 2014 diff hist 0 N File:Main Page June 23, 2014.jpg No edit summary current
- 10:2110:21, 23 June 2014 diff hist −148 m Main Page EPG 703.2.9
- 09:5809:58, 23 June 2014 diff hist +64 m Category:703 Concrete Masonry Construction →703.2.9 Curing: inserted link
- 09:4909:49, 23 June 2014 diff hist +98 m Category:703 Concrete Masonry Construction →703.2.9 Curing
- 09:4709:47, 23 June 2014 diff hist +7 m Category:703 Concrete Masonry Construction →703.2.9 Curing
- 09:4609:46, 23 June 2014 diff hist +541 m Category:703 Concrete Masonry Construction →703.2.9 Curing: Per CM and Bridge, additional guidance about laying sprinkler hoses and sprayers before the concrete has proper set was provided
- 09:4409:44, 23 June 2014 diff hist 0 N File:703.2.9.jpg No edit summary current
- 09:1709:17, 23 June 2014 diff hist +96 m LPA:136.13 LPA Policy Changes Fig. 136.8.8
- 09:1609:16, 23 June 2014 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Updated Fig. 136.8.8
- 09:1609:16, 23 June 2014 diff hist 0 N File:136.8.8 2014.doc No edit summary current
- 09:1509:15, 23 June 2014 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Fig. 136.8.8 RW Clearance Certification Statement Sample Letter