User contributions for Smithk
Jump to navigation
Jump to search
23 June 2014
- 08:5508:55, 23 June 2014 diff hist +51 m 750.1 Open Channels →750.1.4.1.1 Manning's n: minor clarification
- 08:4708:47, 23 June 2014 diff hist +281 m 751.1 Preliminary Design →751.1.2.6 Box Culverts: Per Bridge, minor clarifications
- 08:4308:43, 23 June 2014 diff hist 0 N File:750.7.13 Slopes for Skewed Culvert Sections.pdf No edit summary current
- 08:4308:43, 23 June 2014 diff hist +3 m 750.7 Non-Hydraulic Considerations →750.7.13 Culvert Lengths: Per Bridge, provided improved figure
- 08:4108:41, 23 June 2014 diff hist +151 m 750.6 Erosion Control and Energy Dissipation →750.6.2.1 Shear Stress: Per Bridge, minor clarifications
- 08:2808:28, 23 June 2014 diff hist +39 m 750.3 Bridges →750.3.2.4 Hydraulic Analysis of Bridges: added link
- 08:2608:26, 23 June 2014 diff hist 0 N File:750.1.4.1.1 Manning.pdf No edit summary current
- 08:2508:25, 23 June 2014 diff hist −32 m 750.1 Open Channels →750.1.4.1.1 Manning's n: minor clarifications, per Bridge
- 08:0008:00, 23 June 2014 diff hist +17 m 750.1 Open Channels →750.1.4.1.1 Manning's n
- 07:5607:56, 23 June 2014 diff hist 0 N File:750.1.4.1.1 mean boundary shear.jpg No edit summary current
- 07:2607:26, 23 June 2014 diff hist +4 m 748.3 Freeboard →748.3.4 Levees: Per Bridge, minor clarification current
20 June 2014
- 12:1112:11, 20 June 2014 diff hist +1,728 m 236.15 Requests from Cities for Annexations updated CCO contract link
- 12:0912:09, 20 June 2014 diff hist +1,450 m 236.14 Change in Route Status Report updated CCO contract links
- 12:0712:07, 20 June 2014 diff hist +1,181 m 236.11 Mediation udpated CCO contract links
- 12:0412:04, 20 June 2014 diff hist +1,448 m 236.8 Relocation Assistance Program CCO contract link updated
- 12:0212:02, 20 June 2014 diff hist +14,113 m 236.7 Negotiation numerous CCO contract links updated
- 11:1411:14, 20 June 2014 diff hist +1,820 m 236.5 Property Management updated CCO contract links
- 11:1211:12, 20 June 2014 diff hist +2,189 m 236.4 Description Writing and Titles updated CCO contract links
- 11:0711:07, 20 June 2014 diff hist +4,396 m 236.6 Appraisal and Appraisal Review updated numerous CCO contract links
- 10:5910:59, 20 June 2014 diff hist +9,285 m 236.5 Property Management updated numerous contract links
- 10:4110:41, 20 June 2014 diff hist +4,658 m 236.4 Description Writing and Titles updated numerous contract links
- 10:0810:08, 20 June 2014 diff hist +121 m Main Page EPG 751.50
- 09:5109:51, 20 June 2014 diff hist +1,170 m 751.50 Standard Detailing Notes →H. Superstructure Notes: Per Bridge, removed rustication requirements and revised outdated or incorrect guidance on permissible alternate barrier curb reinforcing shapes
19 June 2014
- 12:2012:20, 19 June 2014 diff hist −4,188 m LPA:136.3 Federal Aid Basics →136.3.18 Transportation Alternatives Program (TAP): EPG 136.3.18 deleted, since it was moved to EPG 136.3.8 in March 2014.
18 June 2014
- 12:3312:33, 18 June 2014 diff hist 0 m 171.6 Roadsides →171.6.4 Vegetation Management: updated link
- 12:2912:29, 18 June 2014 diff hist +1,737 m 903.15 Signing Agreements updated links to CCO contracts
- 12:1512:15, 18 June 2014 diff hist +159 m Category:903 Highway Signing updated CCO contract link
- 10:5010:50, 18 June 2014 diff hist +344 m 171.1 Administration →ADM(C2) Maintenance Contracts: added link, per CM
- 10:4710:47, 18 June 2014 diff hist −29 m 171.1 Administration updated three CCO links in ADM(B1) and ADM(B2)
- 08:4108:41, 18 June 2014 diff hist +13 m Help Article →Division Contacts: EPG contact for CCO
17 June 2014
- 14:4514:45, 17 June 2014 diff hist +78 m Category:235 Preliminary Plans updated CCO links to DE10 and DE11
- 12:4912:49, 17 June 2014 diff hist 0 m Main Page No edit summary
- 10:4410:44, 17 June 2014 diff hist 0 N File:236.6.3.3 Waiver Valuation (Form 6.3.3).docx No edit summary
- 10:4410:44, 17 June 2014 diff hist +3 m 236.6 Appraisal and Appraisal Review Per RW, updated Waiver Valuation (Form 6.3.3)
- 10:4110:41, 17 June 2014 diff hist +48 m 236.3 Administration →236.3.3.2 Right of Way Cost Estimates: Per RW, minor clarification
- 10:0610:06, 17 June 2014 diff hist 0 N File:Main Page June 17, 2014.jpg No edit summary current
- 10:0510:05, 17 June 2014 diff hist +376 m Main Page EPG 110.3.1, EPG 238.3.37 and EPG 748.7.3
- 08:1708:17, 17 June 2014 diff hist 0 N File:238.3.37.12.jpg No edit summary current
- 08:1608:16, 17 June 2014 diff hist 0 N File:236.6.3.2 Value Finding Appraisal 2014.docx No edit summary
- 08:1608:16, 17 June 2014 diff hist 0 N File:236.6.3.1 Standard Appraisal 2014.docx No edit summary
- 08:1608:16, 17 June 2014 diff hist 0 N File:236.6.3.7B.docx No edit summary
- 08:1508:15, 17 June 2014 diff hist −69 m 236.6 Appraisal and Appraisal Review Per RW, updated three forms
- 08:0208:02, 17 June 2014 diff hist −2,576 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.1 Wage Interviews
- 08:0208:02, 17 June 2014 diff hist +2,157 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.1 Wage Interviews: Per CM, clarified wage rate interview requirements to meet federal requirements. Main change combines all frequency rates into one (except for JOCs, which are being added)
- 07:5307:53, 17 June 2014 diff hist −449 m 238.3 Route Surveying →238.3.37 Bridge Survey Information: Per Bridge, updated guidance to match survey needs for geo files. Clarified subarticles' organization and added a typical valley section location sketch.
- 07:3107:31, 17 June 2014 diff hist +1,792 m 748.7 Bridge Reports and Layouts →748.7.3 Preparation of Bridge Survey Report: Per Bridge, removed the requirement for districts to calculate drainage area for bridge surveys. Also added guidance/requirements for GEO files.
16 June 2014
- 15:0715:07, 16 June 2014 diff hist 0 m Main Page No edit summary
- 15:0515:05, 16 June 2014 diff hist −143 m Main Page EPG 751.50 and EPG 101
- 14:4814:48, 16 June 2014 diff hist +553 m 751.50 Standard Detailing Notes Per Bridge, additional guidance for notes A1.2 and H1.3
- 14:4014:40, 16 June 2014 diff hist +4 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per CM, updated QRG Subcontracts