User contributions for Smithk
Jump to navigation
Jump to search
30 April 2014
- 10:0210:02, 30 April 2014 diff hist +186 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.4.3.3 Consultant Evaluations for On-Call Services: Per LPA, clarified who signs the LPA On-Call Consultant Evaluation and what happens to it afterwards
- 09:5309:53, 30 April 2014 diff hist +4 m 771.9 Temporary Bridge Deck Repair No edit summary
- 09:0909:09, 30 April 2014 diff hist +10 m Category:609 Paved Drainage updated link
- 08:1908:19, 30 April 2014 diff hist −45 m 616.26 Work Zone User Training Per Traffic, updated WZ Inspection Form
- 08:1708:17, 30 April 2014 diff hist 0 N File:WZ Inspection.docx No edit summary
- 07:2507:25, 30 April 2014 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links No edit summary
29 April 2014
- 12:4512:45, 29 April 2014 diff hist +78 m Category talk:806 Pollution, Erosion and Sediment Control No edit summary current
- 12:2812:28, 29 April 2014 diff hist 0 N File:702 Pile Driving Set Calculator.xlsx No edit summary current
- 12:2812:28, 29 April 2014 diff hist −36 m Category:702 Load-Bearing Piles Per Bridge, updated Pile Driving Set Calculator
- 12:0512:05, 29 April 2014 diff hist +96 m Category:806 Pollution, Erosion and Sediment Control added link
- 08:5608:56, 29 April 2014 diff hist +2 m Main Page No edit summary
- 08:2708:27, 29 April 2014 diff hist +179 m Main Page No edit summary
- 08:2508:25, 29 April 2014 diff hist 0 N File:Main Page 2 Apr 29, 2014.jpg No edit summary current
- 08:2508:25, 29 April 2014 diff hist 0 N File:Main Page Apr 29, 2014.jpg No edit summary current
- 08:2508:25, 29 April 2014 diff hist +284 m Main Page EPG 751.40.4.3
- 07:1207:12, 29 April 2014 diff hist +12 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Per Bridge, minor clarifications
- 07:0607:06, 29 April 2014 diff hist +15 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: minor cosmetic adjustment
28 April 2014
- 15:2515:25, 28 April 2014 diff hist +10 m 751.40 LFD Widening and Repair Per Bridge, clarified EPG 751.40.4.3 guidance by replacing the text with a table
- 15:2015:20, 28 April 2014 diff hist −5,949 m 751.40 LFD Widening and Repair Per Bridge, clarified EPG 751.40.4.3 guidance by replacing the text with a table
- 13:5613:56, 28 April 2014 diff hist +34 m Category:900 TRAFFIC CONTROL new photo
- 13:5413:54, 28 April 2014 diff hist 0 N File:900.jpg No edit summary current
- 12:2712:27, 28 April 2014 diff hist +155 m LPA:136.13 LPA Policy Changes Fig. 136.4.6
- 12:2512:25, 28 April 2014 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.6
- 12:2312:23, 28 April 2014 diff hist 0 N File:136.4.6.docx No edit summary current
- 12:2312:23, 28 April 2014 diff hist +3 m LPA:136.4 Consultant Selection and Consultant Contract Management Per Audits and Investigations, updated Fig. 136.4.6 List of Unallowable Costs
- 12:0912:09, 28 April 2014 diff hist 0 N File:134.3.6.1.1.docx No edit summary
- 12:0812:08, 28 April 2014 diff hist +3 m Category:134 Engineering Professional Services Per Audits and Investigations, updated Fig. 134.3.6.1.1 List of Unallowable Costs
25 April 2014
- 12:1012:10, 25 April 2014 diff hist −61 m Main Page EPG 147.3.5
- 11:2411:24, 25 April 2014 diff hist +72 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: Per Estimate and Review, clarification of the process of revising the job order contract bonds
24 April 2014
- 12:4412:44, 24 April 2014 diff hist 0 N File:Main Page Apr 24, 2014.jpg No edit summary current
- 12:4312:43, 24 April 2014 diff hist 0 N File:Main Page 2 Apr 24, 2014.jpg No edit summary current
- 12:4312:43, 24 April 2014 diff hist +196 m Main Page new photos
- 07:2407:24, 24 April 2014 diff hist +1 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.1 Introduction
- 07:0307:03, 24 April 2014 diff hist −7 m 771.2 Bridge Cleaning and Flushing Per Maint., clarified the Bridge Cleaning and Flushing code as only R327, not both R327 or R913.
23 April 2014
- 15:1915:19, 23 April 2014 diff hist 0 N File:505.1.2.4.jpg No edit summary current
- 15:1915:19, 23 April 2014 diff hist +36 m Category:505 Bridge Deck Concrete Wearing Surface →505.1.2.4 Finishing Equipment (for Sec 505.20.7)
- 15:0715:07, 23 April 2014 diff hist 0 N File:703.1.12.jpg No edit summary current
- 15:0715:07, 23 April 2014 diff hist +35 m Category:703 Concrete Masonry Construction →703.1.12 Anchor Bolt Wells: new photo
- 14:4314:43, 23 April 2014 diff hist 0 m Main Page No edit summary
22 April 2014
- 12:3412:34, 22 April 2014 diff hist +43 m Main Page No edit summary
- 12:3212:32, 22 April 2014 diff hist −643 m Main Page No edit summary
- 12:3112:31, 22 April 2014 diff hist 0 N File:Main Page Apr 22, 2014.jpg No edit summary current
- 12:3112:31, 22 April 2014 diff hist +1,069 m Main Page EPG 751, EPG 703
- 12:2012:20, 22 April 2014 diff hist +22 m 751.31 Open Concrete Intermediate Bents →751.31.2.3 General Design Assumptions: added link
- 12:1712:17, 22 April 2014 diff hist +50 m 751.10 General Superstructure →751.10.1.5 Interior Section Design: added link
- 12:1212:12, 22 April 2014 diff hist +53 m 751.8 Concrete Box Culverts →751.8.2.6.1 Strength Limit Design: added link
- 11:1111:11, 22 April 2014 diff hist +792 m Category:703 Concrete Masonry Construction →703.3 Bridge Barrier Wall: Per CM, the intent on when barrier wall placement is allowed was clarified
- 11:0511:05, 22 April 2014 diff hist +3,574 m 751.37 Drilled Shafts Per Bridge, numerous clarifications of drilled shafts lateral movements requirements and drilled shafts diameter for axial and settlement computations.
- 10:3410:34, 22 April 2014 diff hist −1 m 751.8 Concrete Box Culverts →751.8.1.1 Material Properties
- 10:3210:32, 22 April 2014 diff hist −102 m 751.35 Concrete Pile Cap Integral End Bents →751.35.1.1 Material Properties: Per Bridge, revised modulus of rupture information to meet latest AASHTO LRFD bridge design specifications.