User contributions for Smithk
Jump to navigation
Jump to search
25 November 2013
- 12:2812:28, 25 November 2013 diff hist 0 N File:616.23.2.5.7 Type 2.jpg No edit summary current
- 12:2812:28, 25 November 2013 diff hist 0 N File:616.23.2.5.7.jpg No edit summary current
- 12:2812:28, 25 November 2013 diff hist 0 m 616.23 Traffic Control for Field Operations →616.23.2.5.7 Pavement Markings
- 12:2712:27, 25 November 2013 diff hist +116 m 616.23 Traffic Control for Field Operations Per Traffic, added photo
- 12:2612:26, 25 November 2013 diff hist +107 m 616.23 Traffic Control for Field Operations Per traffic, added photo
- 12:2012:20, 25 November 2013 diff hist −43 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.47 NO CENTER LINE Sign (WO8-12) (MUTCD 6F.47): Per Traffic, minor clarification about the old NO PASSING ZONES UNMARKED signs (that have been replaced by the NO CENTER STIPE sign)
- 12:1912:19, 25 November 2013 diff hist −240 m 616.23 Traffic Control for Field Operations Per Traffic, minor clarification about the old NO PASSING ZONES UNMARKED signs (that have been replaced by the NO CENTER STIPE sign)
- 11:3911:39, 25 November 2013 diff hist +571 m 236.6 Appraisal and Appraisal Review Replaced link to former EPG 941.1 with the brief content of the former EPG 941.1.
- 11:3711:37, 25 November 2013 diff hist −26 m 171.4 Shoulders and Approaches Updated link to EPG 941
- 11:2911:29, 25 November 2013 diff hist −13 m Category:900 TRAFFIC CONTROL Per Traffic, EPG 941 has been almost entirely re-written to reflect the Commission Policies.
- 11:2811:28, 25 November 2013 diff hist +84,370 Nm Category:941 Permits and Access Requests Per Traffic, EPG 941 has been almost entirely re-written to reflect the Commission Policies.
- 11:1311:13, 25 November 2013 diff hist +135 903.9 General Information Signs Per Traffic, updated links
- 11:0611:06, 25 November 2013 diff hist +45 m 171.4 Shoulders and Approaches Per Traffic, updated link
- 11:0511:05, 25 November 2013 diff hist +45 m 750.7 Non-Hydraulic Considerations Per Traffic, updated link
- 11:0411:04, 25 November 2013 diff hist +84 m 233.2 At-Grade Intersections with Stop and Yield Control Per Traffic, updated links
- 11:0211:02, 25 November 2013 diff hist −2 m 905.1 Traffic Data Collection No edit summary
- 10:5910:59, 25 November 2013 diff hist +42 m 905.1 Traffic Data Collection Per Traffic, updated link
- 10:5810:58, 25 November 2013 diff hist +41 m Category:240 Maintenance and Emergency Crossovers Per Traffic, updated link
- 10:5310:53, 25 November 2013 diff hist 0 N File:941 Value.pdf No edit summary current
- 10:5210:52, 25 November 2013 diff hist −51 m 236.5 Property Management Per Traffic, updated link
22 November 2013
- 16:0516:05, 22 November 2013 diff hist −4 m Category:503 Bridge Approach Slabs →503.1 Major Roads: updated link
- 16:0416:04, 22 November 2013 diff hist −16 m Category:144 Practical Operations updated link
21 November 2013
- 14:4714:47, 21 November 2013 diff hist +265 m Main Page EPG 620.12 revision re-instated
- 14:4614:46, 21 November 2013 diff hist +148 m 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4): CM's revision re-instated
- 14:1114:11, 21 November 2013 diff hist −149 m 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4): Per Traffic, CM's revision from a few minutes ago replaced with previous guidance.
- 14:0514:05, 21 November 2013 diff hist −265 m Main Page EPG 620.12 revision removed
- 13:4513:45, 21 November 2013 diff hist +33 m Main Page EPG 6320.12.2.4
- 13:4213:42, 21 November 2013 diff hist +49 m 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4): inserted link
- 13:4113:41, 21 November 2013 diff hist +98 m 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4): Per CM, clarification of guidance for retroreflectivity readings following seal coats as opposed to readings following UBAWS or other treatments.
- 12:2712:27, 21 November 2013 diff hist 0 File:Main Page Nov 21, 2013.jpg uploaded a new version of "Image:Main Page Nov 21, 2013.jpg" current
- 12:2712:27, 21 November 2013 diff hist 0 N File:Main Page Nov 21, 2013.jpg No edit summary
- 12:2712:27, 21 November 2013 diff hist +218 m Main Page EPG 748.7.6
- 12:0512:05, 21 November 2013 diff hist +68 m 104.7 Scoping Estimates Per Planning, updated two links
- 11:5011:50, 21 November 2013 diff hist +224 m 104.7 Scoping Estimates Added historical engineering factor reports, per Planning
- 11:0811:08, 21 November 2013 diff hist +360 m 751.1 Preliminary Design →751.1.1.2 Bridge Survey: added link, per Bridge
- 11:0311:03, 21 November 2013 diff hist 0 N File:748.7.6.3 Opt 3.jpg No edit summary current
- 11:0211:02, 21 November 2013 diff hist 0 N File:748.7.6.3 Videos.jpg No edit summary current
- 11:0211:02, 21 November 2013 diff hist 0 N File:748.7.6.3 Opt 1.jpg No edit summary current
- 11:0111:01, 21 November 2013 diff hist +6,666 m 748.7 Bridge Reports and Layouts →748.7.5.3.3 Guidelines for the Design of Miscellaneous Foundations: Per Bridge and CADD, optional procedure for districts and Bridge to produce a Bridge Survey Aerial
20 November 2013
- 15:5515:55, 20 November 2013 diff hist −64 m 106.3 Samples, Tests and Cited Specifications →106.3.1.1 Random Sampling: Per CM, removed the guidance that the contractor is responsible to request inspection. Inspection responsibilities have shifted to the contractor.
- 15:3715:37, 20 November 2013 diff hist 0 N File:Main Page 2 Nov 20, 2013.jpg No edit summary current
- 15:3715:37, 20 November 2013 diff hist 0 N File:Main Page Nov 20, 2013.jpg No edit summary current
- 15:3615:36, 20 November 2013 diff hist +382 m Main Page new photos
19 November 2013
- 13:0313:03, 19 November 2013 diff hist −2 m Category:712 Structural Steel Construction →712.3.2.2 Physical Tests - Bolts and Nuts: Per Bridge, reference to AASHTO M164 removed since it has been discontinued. Replaced with ASTTM A325
- 12:2812:28, 19 November 2013 diff hist −56 m 751.50 Standard Detailing Notes Per Bridge, reference to AASHTO M291 removed since it has been discontinued
- 11:5911:59, 19 November 2013 diff hist −187 m Main Page EPG 134
- 11:3511:35, 19 November 2013 diff hist −215 m Category:134 Engineering Professional Services Per Design, MOU ceiling raised to $200,000. Also, AI is no longer required to review supplemental agreements
- 11:0911:09, 19 November 2013 diff hist +86 m 616.25 MoDOT Work Zone Guidelines Per Traffic, updated link
- 09:2409:24, 19 November 2013 diff hist −369 m Other Aspects of Pavement Design →Purpose of Alternate and Optional Pavement Bidding: Per Bidding, further clarification
- 08:1308:13, 19 November 2013 diff hist −31 m 236.5 Property Management →236.5.20.2 Transaction Agreements: Per RW, minor clarification