User contributions for Smithk
Jump to navigation
Jump to search
18 November 2013
- 15:3015:30, 18 November 2013 diff hist −14 m 751.50 Standard Detailing Notes →H3a. Type C & D: Per CM, reference to AASHTO M291 removed since it has been discontinued
- 13:2513:25, 18 November 2013 diff hist −1 m Other Aspects of Pavement Design →Life-Cycle Cost Adjustment (LCCA)
- 13:1813:18, 18 November 2013 diff hist −2 m Main Page No edit summary
- 13:1313:13, 18 November 2013 diff hist +37 m Main Page No edit summary
- 12:3012:30, 18 November 2013 diff hist 0 N File:Main Page Nov 18, 2013.jpg No edit summary current
- 12:3012:30, 18 November 2013 diff hist +278 m Main Page EPG Other Aspects
- 12:1812:18, 18 November 2013 diff hist +501 m Other Aspects of Pavement Design →Purpose of Alternate and Optional Pavement Bidding: Per Design, "continuous paving" defined
15 November 2013
- 16:2116:21, 15 November 2013 diff hist −2 m Category:1036 Reinforcing Steel for Concrete →1036.4 Epoxy Coated Reinforcing Steel
- 16:1616:16, 15 November 2013 diff hist −4 m Category:1036 Reinforcing Steel for Concrete →1036.4 Epoxy Coated Reinforcing Steel: Per CM, AASHTO spec has been discontinued in favor of the ASTM specification
- 13:1113:11, 15 November 2013 diff hist +7 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: minor clarification, per Bridge
- 12:0512:05, 15 November 2013 diff hist +181 m Main Page EPG 902.5
- 11:2911:29, 15 November 2013 diff hist +125 m 902.15 Designing a Traffic Signal →902.15.1 Preparation of Plans: Per Traffic, clarifications about the allowance of U-turns at signals.
- 11:2111:21, 15 November 2013 diff hist +865 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) Per Traffic, clarifications about the allowance of U-turns at signals. Also, some U-turn sign numbers (R10-30a, R10-30b, R10-30c) were added.
- 10:2110:21, 15 November 2013 diff hist 0 N File:Nov 14, 2013.docx No edit summary
- 10:2110:21, 15 November 2013 diff hist −25 m Main Page No edit summary
14 November 2013
- 16:1616:16, 14 November 2013 diff hist 0 N File:806 MT Training 2013.pdf No edit summary
- 16:1516:15, 14 November 2013 diff hist +5 m Category:806 Pollution, Erosion and Sediment Control Per Environmental, minor updates to "Maintenance Land Disturbance Training, 2013"
- 14:5114:51, 14 November 2013 diff hist 0 m Main Page No edit summary
13 November 2013
- 14:4014:40, 13 November 2013 diff hist +11 m Main Page No edit summary
- 12:0212:02, 13 November 2013 diff hist 0 N File:Main Page 2 Nov 13, 2013.jpg No edit summary current
- 12:0212:02, 13 November 2013 diff hist 0 N File:Main Page Nov 13, 2013.jpg No edit summary current
- 12:0112:01, 13 November 2013 diff hist +178 m Main Page new photos
12 November 2013
- 13:3713:37, 12 November 2013 diff hist −53 m 940.9 Auxiliary Acceleration and Turning Lanes Per Traffic, EPG 940.9.6's heading clarified; content from EPG 940.9.6 moved into EPG 940.9.7
- 12:0612:06, 12 November 2013 diff hist −39 m Category:101 Standard Forms →Scoping: Per Design, revised Design Liaison Checklist's title
- 12:0412:04, 12 November 2013 diff hist 0 N File:104.6 Design Liaison Checklist.doc No edit summary current
- 12:0312:03, 12 November 2013 diff hist −39 m 104.6 Project Scoping Checklists Per Design, revised Design Liaison Checklist's title
- 10:5910:59, 12 November 2013 diff hist +273 m Main Page EPG 907.1
- 10:2510:25, 12 November 2013 diff hist +44 m 907.1 Safety Program Guidelines No edit summary
- 10:1810:18, 12 November 2013 diff hist +590 m 907.1 Safety Program Guidelines Per Traffic, safety money “pots” were combined; districts should reserve $ to help counties implement County Strategic Hwy Safety Plans; recommend each district to have a 3-5 year safety plan
8 November 2013
- 14:3914:39, 8 November 2013 diff hist +163 m 238.1 Aerial Mapping and LiDAR Surveys →238.1.6 Aerial Mapping and LiDAR MOU: updated link
- 14:3314:33, 8 November 2013 diff hist +5 m 238.1 Aerial Mapping and LiDAR Surveys →238.1.3 Standard Deliverables for LiDAR Data
- 13:4113:41, 8 November 2013 diff hist −633 m Main Page EPG 238.1
- 13:3513:35, 8 November 2013 diff hist 0 N File:238.1.3.pdf No edit summary current
- 13:3513:35, 8 November 2013 diff hist −12,057 m 238.1 Aerial Mapping and LiDAR Surveys Per CADD, this article almost entirely rewritten to reflect changes from the new LiDAR technology.
- 13:3413:34, 8 November 2013 diff hist +52 N 238.1 Photogrammetric Surveying 238.1 Photogrammetric Surveying moved to 238.1 Aerial Mapping and LiDAR Surveys: Per CADD, this article almost entirely rewritten to reflect changes from the new LiDAR technology. current
- 13:3413:34, 8 November 2013 diff hist 0 m 238.1 Aerial Mapping and LiDAR Surveys 238.1 Photogrammetric Surveying moved to 238.1 Aerial Mapping and LiDAR Surveys: Per CADD, this article almost entirely rewritten to reflect changes from the new LiDAR technology.
- 12:2112:21, 8 November 2013 diff hist −32 m 640.2 Median Drainage →640.2.5 Median Inlet Capacities: Per Bridge, removed metric equivalents
- 09:4909:49, 8 November 2013 diff hist 0 N File:Main Page 2 Nov 8, 2013.jpg No edit summary current
- 09:4909:49, 8 November 2013 diff hist 0 N File:Main Page Nov 8, 2013.jpg No edit summary current
- 09:4909:49, 8 November 2013 diff hist +153 m Main Page EPG 751.37.3.1
- 08:3908:39, 8 November 2013 diff hist +272 m 751.37 Drilled Shafts →751.37.3.1 Axial Resistance for Individual Drilled Shafts in Rock (qu ≥ 100 ksf): Per Bridge, clarification of Eq'n 751.37.3.4
7 November 2013
- 14:5914:59, 7 November 2013 diff hist 0 m Main Page No edit summary
- 14:3314:33, 7 November 2013 diff hist +2 m Category:134 Engineering Professional Services updated name
- 14:3114:31, 7 November 2013 diff hist +2 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant: updated name
- 14:0414:04, 7 November 2013 diff hist +34 m 236.13 Designing Right of Way Plans added photo
- 14:0314:03, 7 November 2013 diff hist 0 N File:236.13.8.jpg No edit summary current
- 13:3813:38, 7 November 2013 diff hist +38 m 234.3 Directional Interchanges new photo
- 13:3613:36, 7 November 2013 diff hist 0 N File:234.3.15.jpg No edit summary current
- 11:3411:34, 7 November 2013 diff hist −1 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.7 Work on the Shoulder with No Encroachment (MUTCD 6G.07)
- 11:2211:22, 7 November 2013 diff hist +48 m LPA:136.1 Introduction →136.1.3.2 Preliminary and Final Design: updated link