User contributions for Smithk
Jump to navigation
Jump to search
21 October 2013
- 09:5309:53, 21 October 2013 diff hist +34 m 230.2 Vertical Alignment →230.2.4 Sight Distance: new photo
- 09:5209:52, 21 October 2013 diff hist 0 N File:230.2.4.jpg No edit summary current
18 October 2013
- 14:2014:20, 18 October 2013 diff hist +209 m Main Page EPG 130.1.3
- 14:0114:01, 18 October 2013 diff hist +90 m Category:130 Value Engineering Per Design, in order to comply with MAP-21, NHS projects costing at least $50M and NHS bridge projects costing at least $40M require a VE
- 13:3513:35, 18 October 2013 diff hist +550 m LPA:136.13 LPA Policy Changes EPG 136.7.2.10
- 13:2813:28, 18 October 2013 diff hist −1 m LPA:136.7 Design →136.7.2.10 Value Engineering: Per Design, in order to comply with MAP-21, NHS projects costing at least $50M and NHS bridge projects costing at least $40M require a VE
- 13:1913:19, 18 October 2013 diff hist −155 m Main Page EPG 806 and 134
- 11:2311:23, 18 October 2013 diff hist −135 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per Design, the invoicing requirements were updated. Design no longer gets the letters; only Finc'l Services.
- 11:1411:14, 18 October 2013 diff hist 0 N File:806 ESC Quick Reference.docx No edit summary
- 11:1411:14, 18 October 2013 diff hist 0 N File:806 ESC.docx No edit summary
- 11:1411:14, 18 October 2013 diff hist 0 N File:806 Online ESC.docx No edit summary
- 11:1311:13, 18 October 2013 diff hist +596 m Category:806 Pollution, Erosion and Sediment Control Per Environmental, new forms added
17 October 2013
- 15:2215:22, 17 October 2013 diff hist +4,181 m 750.7 Non-Hydraulic Considerations moved guidance for greater clarity
- 15:2115:21, 17 October 2013 diff hist +18 m 750.2 Culverts updated link
- 13:5513:55, 17 October 2013 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition →136.8.10.1 General
- 12:5812:58, 17 October 2013 diff hist −43 m LPA:136.8 Local Public Agency Land Acquisition →136.8.10.1 General: removed archaic link
- 12:4212:42, 17 October 2013 diff hist 0 N File:941.2 coordination 2013.jpg No edit summary current
- 12:0912:09, 17 October 2013 diff hist 0 N File:Main Page Oct 17, 2013.jpg No edit summary current
- 12:0912:09, 17 October 2013 diff hist −616 m Main Page new photo
- 11:1211:12, 17 October 2013 diff hist +16 m 751.1 Preliminary Design →751.1.2.16 Preliminary Cost Estimate: Per Bridge, updated Bridge section name
- 11:0911:09, 17 October 2013 diff hist +22 m 751.6 General Quantities Per Bridge, updated Bridge section name
16 October 2013
- 10:2810:28, 16 October 2013 diff hist +1 m Main Page No edit summary
- 10:2710:27, 16 October 2013 diff hist 0 N File:Main Page 2 Oct 16, 2013 2.jpg No edit summary current
- 10:2610:26, 16 October 2013 diff hist 0 N File:Main Page 2 Oct 16, 2013.jpg No edit summary current
- 10:2610:26, 16 October 2013 diff hist 0 N File:Main Page Oct 16, 2013.jpg No edit summary current
- 10:2610:26, 16 October 2013 diff hist +462 m Main Page new photos
15 October 2013
- 12:4512:45, 15 October 2013 diff hist 0 m Main Page No edit summary
- 12:3212:32, 15 October 2013 diff hist −2 m 751.50 Standard Detailing Notes →H3a. Type C & D: Per Bridge, minor correction
- 10:2110:21, 15 October 2013 diff hist 0 N File:751.22.3.8 camber 2013.jpg No edit summary current
- 10:2010:20, 15 October 2013 diff hist +5 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps: Per Bridge, updated figure with a minor clarification
- 07:1107:11, 15 October 2013 diff hist 0 m 751.50 Standard Detailing Notes →H3a. Type C & D: Per Bridge, minor corrections
- 07:0707:07, 15 October 2013 diff hist +35 m LPA:136.13 LPA Policy Changes Clarification, per LPA, of most recent change
11 October 2013
- 15:2115:21, 11 October 2013 diff hist +215 m LPA:136.13 LPA Policy Changes EPG 136.3
- 15:1915:19, 11 October 2013 diff hist −1 m LPA:136.3 Federal Aid Basics Per LPA, moved EPG 136.15.1 Progress Invoice to EPG 136.3.7.3, per a federal request. There was no change in policy.
- 15:1515:15, 11 October 2013 diff hist −2 m LPA:136.4 Consultant Selection and Consultant Contract Management updated link
- 14:3014:30, 11 October 2013 diff hist +1 m Main Page No edit summary
- 13:4113:41, 11 October 2013 diff hist 0 N File:Main Page 2 Oct 11, 2013.jpg No edit summary current
- 13:4113:41, 11 October 2013 diff hist 0 N File:Main Page Oct 11 2013.jpg No edit summary current
- 13:4013:40, 11 October 2013 diff hist −652 m Main Page EPG 616.18, EPG 751.22.3.8, EPG 101
- 12:5712:57, 11 October 2013 diff hist +383 m 237.1 Plan Details added link
- 12:5512:55, 11 October 2013 diff hist +383 m 903.11 Specific Service Signs - Logos →903.11.3 Logos and Logo Sign Panels (MUTCD Section 2J.03): added link
- 12:4112:41, 11 October 2013 diff hist +4,825 m 616.18 Construction Inspection Guidelines for Sec 616 Per CM and Traffic, guidance in line with existing practice added on how to perform temporary or permanent relocation of Logo signs.
- 12:2112:21, 11 October 2013 diff hist −62 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps
- 12:1812:18, 11 October 2013 diff hist 0 N File:751.22.3.8 haunch.jpg No edit summary current
- 12:1712:17, 11 October 2013 diff hist 0 N File:751.22.3.8 camber.jpg No edit summary current
- 12:1712:17, 11 October 2013 diff hist +114 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps: Per Bridge, at the request of AGC, limits for prestressed girder haunching will be reported to the nearest 1/8”. We currently use 1/16”.
- 11:1711:17, 11 October 2013 diff hist 0 N File:Equipment Verification Samples.docx No edit summary
- 11:1711:17, 11 October 2013 diff hist +131 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, new QRG, Equipment Verification Samples
- 10:1910:19, 11 October 2013 diff hist +49 m Category:910 Intelligent Transportation Systems →910.2 How ITS Works: added photo
- 10:1610:16, 11 October 2013 diff hist 0 N File:910.2 motorist assist.jpg No edit summary current