User contributions for Smithk
Jump to navigation
Jump to search
25 July 2013
- 08:5408:54, 25 July 2013 diff hist −1 m Category:Minor Routes Shouldering Project Guidelines →Constructability
- 07:5207:52, 25 July 2013 diff hist 0 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.18 Visibility, Aiming, and Shielding of Signal Faces (MUTCD Section 4D.12)
- 07:0907:09, 25 July 2013 diff hist +192 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.18 Visibility, Aiming, and Shielding of Signal Faces (MUTCD Section 4D.12): Updated link
24 July 2013
- 13:2013:20, 24 July 2013 diff hist +1 m Main Page No edit summary
- 12:5512:55, 24 July 2013 diff hist +135 m Main Page EPG 413.3
- 12:5212:52, 24 July 2013 diff hist 0 N File:413.3.xlsx No edit summary current
- 12:5212:52, 24 July 2013 diff hist −33 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per Construction and Materials, replaced old Ashpalt Cement Price Index Example file with the new Asphalt Cement Price Adjustment spreadsheet for sq. yd. items.
- 11:2211:22, 24 July 2013 diff hist −186 m Main Page EPG Minor Routes
- 10:2010:20, 24 July 2013 diff hist 0 N File:Optional Shoulder JSP.doc No edit summary current
- 10:1910:19, 24 July 2013 diff hist −154 m Category:Minor Routes Shouldering Project Guidelines →Constructability: Per Design, replaced the reference to the obsolete Modified Shoulder JSP with the Optional Shoulder JSP.
- 07:2607:26, 24 July 2013 diff hist −62,233 m 620.14 3M Installation Contract Per Traffic, since the 3M contract has expired, this article has been archived current
23 July 2013
- 13:2513:25, 23 July 2013 diff hist −158 m Main Page EPG 147.1
- 13:1913:19, 23 July 2013 diff hist 0 N File:147.3.1 FAQ.pdf No edit summary
- 13:1913:19, 23 July 2013 diff hist 0 N File:147.3.1 white paper.pdf No edit summary
- 13:1913:19, 23 July 2013 diff hist 0 N File:147.3.1 guidelines.pdf No edit summary
- 13:1813:18, 23 July 2013 diff hist +441 m 147.1 Alternative Technical Concepts →147.1.3.1 The Standard ATC: Per Design, added Std ATC guidelines
- 11:0611:06, 23 July 2013 diff hist 0 N File:Main Page July 23, 2013.jpg No edit summary current
- 11:0511:05, 23 July 2013 diff hist −209 m Main Page new photo
22 July 2013
- 15:1015:10, 22 July 2013 diff hist 0 N File:616.25 WZ Coord Contacts July 22 2013.docx No edit summary
- 15:1015:10, 22 July 2013 diff hist +3 m 616.25 MoDOT Work Zone Guidelines Per Traffic, updated the WZ Coordination Contacts list
- 14:4514:45, 22 July 2013 diff hist 0 m Main Page No edit summary
- 14:4414:44, 22 July 2013 diff hist +1 m Main Page No edit summary
19 July 2013
- 12:4412:44, 19 July 2013 diff hist +117 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.18 Crosswalk Markings (MUTCD Section 3B.18): Per Traffic, updated Zebra marking guidance to comply with Std. Plan 620.00
- 12:1412:14, 19 July 2013 diff hist 0 N File:Main Page July 19, 2013.jpg No edit summary current
- 12:1412:14, 19 July 2013 diff hist +9 m Main Page new photo
18 July 2013
- 14:2514:25, 18 July 2013 diff hist +16 m Main Page No edit summary
17 July 2013
- 15:0215:02, 17 July 2013 diff hist +8 m Main Page No edit summary
- 13:2213:22, 17 July 2013 diff hist 0 N File:Main Page 2 July 17, 2013.jpg No edit summary current
- 13:2213:22, 17 July 2013 diff hist 0 N File:Main Page 3 July 17, 2013.jpg No edit summary current
- 13:2213:22, 17 July 2013 diff hist +234 m Main Page new photos
- 11:0111:01, 17 July 2013 diff hist 0 N File:Main Page July 17, 2013.jpg No edit summary current
- 10:5910:59, 17 July 2013 diff hist +51 m 751.36 Driven Piles added photo
16 July 2013
- 14:5014:50, 16 July 2013 diff hist −106 m Main Page EPG 104.7
- 14:4514:45, 16 July 2013 diff hist 0 N File:Fig 104.7.pdf No edit summary
- 14:4514:45, 16 July 2013 diff hist 0 m 104.7 Scoping Estimates Per Design, updated Cost Estimate Guide
- 13:1713:17, 16 July 2013 diff hist 0 m Main Page No edit summary
15 July 2013
- 14:1714:17, 15 July 2013 diff hist 0 N File:720.1.1.jpg No edit summary current
- 14:1714:17, 15 July 2013 diff hist +33 Category:720 Mechanically Stabilized Earth Wall Systems No edit summary
- 14:1214:12, 15 July 2013 diff hist 0 N File:751.22.1.1.jpg No edit summary current
- 14:1214:12, 15 July 2013 diff hist +36 m 751.22 Prestressed Concrete I Girders →751.22.1 General: new photo
- 14:0014:00, 15 July 2013 diff hist 0 N File:127.13.1.jpg No edit summary current
- 13:5913:59, 15 July 2013 diff hist +35 m 127.13 Noise new photo
- 13:3813:38, 15 July 2013 diff hist 0 N File:Main Page July 15, 2013.jpg No edit summary current
- 13:3713:37, 15 July 2013 diff hist −83 m Main Page new photo
- 12:0812:08, 15 July 2013 diff hist −15 m 643.3 Policy, Standards and Regulations →643.3.2 Roadway Classification: updated link
12 July 2013
- 13:2513:25, 12 July 2013 diff hist +81 m LPA:136.13 LPA Policy Changes Fig. 136.3.19
- 13:2313:23, 12 July 2013 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.19 updated
- 13:2313:23, 12 July 2013 diff hist 0 N File:Fig.136.3.19 2013.pdf No edit summary
- 13:2213:22, 12 July 2013 diff hist +10 m LPA:136.3 Federal Aid Basics Per Bridge, the BEAP Consultant List was updated
- 10:4310:43, 12 July 2013 diff hist 0 N File:Main Page July 12, 2013.jpg No edit summary current