User contributions for Smithk
Jump to navigation
Jump to search
12 July 2013
- 10:4310:43, 12 July 2013 diff hist −172 m Main Page EPG 751.1.2.18
- 10:0210:02, 12 July 2013 diff hist 0 N File:751.1.2.18 M40a Guidance.docx No edit summary
- 10:0210:02, 12 July 2013 diff hist +389 m 751.1 Preliminary Design →751.1.2.18 Soundings (Borings): Per Bridge, added guidance for filling out the Sounding Request Form M-40a, especially about bridge and roadway classifications.
- 09:2109:21, 12 July 2013 diff hist +8 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.4 Steel Girder or Beam End Bent: Per Bridge, a couple of clarifications
- 09:2009:20, 12 July 2013 diff hist +282 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders: Per Bridge, several clarifications
11 July 2013
- 14:3514:35, 11 July 2013 diff hist −15 m Main Page No edit summary
- 12:3512:35, 11 July 2013 diff hist +366 m Main Page EPG 751.11 and EPG 751.22
- 11:1211:12, 11 July 2013 diff hist +2 m Category:134 Engineering Professional Services No edit summary
- 11:0911:09, 11 July 2013 diff hist +4 m Category:134 Engineering Professional Services No edit summary
- 10:5210:52, 11 July 2013 diff hist +89 m Main Page EPG 134.3
- 10:4610:46, 11 July 2013 diff hist 0 N File:134.3.1.doc No edit summary current
- 10:4410:44, 11 July 2013 diff hist −2,940 m Category:134 Engineering Professional Services Per Design and Audits & Investigations, revisions result from AI ceasing the pre-negotiations reviews & shifting the reviews to project managers and/or contract administrators. Added Fig. 134.3.1.
- 10:2010:20, 11 July 2013 diff hist +1,921 m 751.11 Bearings Per Bridge, clarified usage of plain and laminated bearing pads. Added bearing pad length requirements for P/S NU girders and P/S Spread Box Beams.
- 10:0310:03, 11 July 2013 diff hist +13 m 751.22 Prestressed Concrete I Girders →751.22.1.4 Span and Structure Lengths
- 10:0010:00, 11 July 2013 diff hist 0 N File:751.22.1.4 coping detail.jpg No edit summary current
- 09:5909:59, 11 July 2013 diff hist 0 N File:751.22.1.4 Non-integral end bents.jpg No edit summary current
- 09:5909:59, 11 July 2013 diff hist 0 N File:751.22.1.4 Integral end bents.jpg No edit summary current
- 09:5809:58, 11 July 2013 diff hist +209 m 751.22 Prestressed Concrete I Girders →751.22.1.4 Span and Structure Lengths: Per Bridge, clarified usage of plain and laminated bearing pads. Added bearing pad length requirements for P/S NU girders and P/S Spread Box Beams.
- 09:2709:27, 11 July 2013 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.14
- 09:2609:26, 11 July 2013 diff hist +148 m LPA:136.13 LPA Policy Changes Fig. 136.4.14
- 09:2509:25, 11 July 2013 diff hist 0 N File:Fig. 136.4.14 July 2013.doc No edit summary current
- 09:2409:24, 11 July 2013 diff hist +3 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated Fig. 136.4.14's checklist to be more helpful
- 08:5408:54, 11 July 2013 diff hist +1 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.9 MoDOT Review of Consultant Contract
- 08:4008:40, 11 July 2013 diff hist +535 m LPA:136.13 LPA Policy Changes EPG 136.4
- 08:3508:35, 11 July 2013 diff hist +581 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA and Audits and Investigations, revisions result from AI ceasing the pre-negotiations reviews and shifting the reviews to project managers and/or contract administrators
- 07:5707:57, 11 July 2013 diff hist 0 N File:Main Page 2 July 11, 2013.jpg No edit summary current
- 07:5707:57, 11 July 2013 diff hist 0 N File:Main Page July 11, 2013.jpg No edit summary current
- 07:5607:56, 11 July 2013 diff hist +66 m Main Page new photos
10 July 2013
- 13:4513:45, 10 July 2013 diff hist −16 m 751.6 General Quantities →751.6.2.17 Excavation
- 11:2711:27, 10 July 2013 diff hist −45 m Main Page EPG 751.6.2
- 11:2111:21, 10 July 2013 diff hist +100 m 751.50 Standard Detailing Notes →B3c. Slabs: Per Bridge, updated note to clarify measurement
- 11:1811:18, 10 July 2013 diff hist −170 m 751.6 General Quantities Per Bridge, expanded guidance for Bridge Slabs (formerly "Slab Quantity")
- 09:0209:02, 10 July 2013 diff hist +103 m Main Page EPG 121.3
- 08:3708:37, 10 July 2013 diff hist +18 m 121.3 The Statewide Transportation Improvement Program (STIP) Updated STIP link
- 08:1908:19, 10 July 2013 diff hist −63 m LPA:136.3 Federal Aid Basics →136.3.8.2.2 Project Eligibility and Selection
- 08:1108:11, 10 July 2013 diff hist −8 m LPA:136.3 Federal Aid Basics Updated Fig. 136.4.10
9 July 2013
- 10:1510:15, 9 July 2013 diff hist 0 N File:134.2.2.2 July 2013.doc No edit summary current
- 10:1510:15, 9 July 2013 diff hist 0 m Category:134 Engineering Professional Services Per Design, minor cosmetic update for Fig. 134.2.2.2
- 10:0810:08, 9 July 2013 diff hist 0 N File:Main Page July 9, 2013.jpg No edit summary current
- 10:0810:08, 9 July 2013 diff hist +142 m Main Page new photo
- 07:5507:55, 9 July 2013 diff hist 0 N File:616.19 Quality Standards 2013.pdf No edit summary
- 07:5507:55, 9 July 2013 diff hist +5 m 616.19 Quality Standards for Temporary Traffic Control Devices updated pdf with new pictures
- 07:1907:19, 9 July 2013 diff hist 0 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.2.8 Sign Innovations
- 07:1807:18, 9 July 2013 diff hist 0 N File:616.19.2.2.8 2013.jpg No edit summary current
- 07:1807:18, 9 July 2013 diff hist 0 N File:616.19.2.2.6 1 2013.jpg No edit summary current
- 07:1807:18, 9 July 2013 diff hist +10 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.2 Signs: Per Traffic, updated pictures
- 07:0207:02, 9 July 2013 diff hist −2 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, minor clarification
8 July 2013
- 14:4514:45, 8 July 2013 diff hist +21 m Main Page EPG 236.7.2.3
- 14:4014:40, 8 July 2013 diff hist +120 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, a minimum offer has been established when acquiring realty rights
- 12:3012:30, 8 July 2013 diff hist +61 m Main Page EPG 134.3.6