- 08:4708:47, 4 January 2013 diff hist +59 N 132.2 Missouri's Blueprint to Arrive Alive 132.2 Missouri's Blueprint to Arrive Alive moved to 132.2 Missouri's Blueprint to Save More Lives
- 08:4708:47, 4 January 2013 diff hist 0 m 132.2 Missouri's Blueprint - A Partnership Toward Zero Deaths 132.2 Missouri's Blueprint to Arrive Alive moved to 132.2 Missouri's Blueprint to Save More Lives
- 08:3008:30, 4 January 2013 diff hist −14 m 147.3 Job Order Contracting (JOC) Per Bidding and Contracts, guard cable jsp not sufficiently ready for display
- 08:2508:25, 4 January 2013 diff hist +44 m 147.3 Job Order Contracting (JOC) added link
- 08:2408:24, 4 January 2013 diff hist 0 N File:148 asphalt pavement repair 2013.doc No edit summary current
- 08:2408:24, 4 January 2013 diff hist 0 N File:148 bridge 2013.doc No edit summary current
- 08:2308:23, 4 January 2013 diff hist 0 N File:148 concrete pavement repair 2013.doc No edit summary current
- 08:2308:23, 4 January 2013 diff hist 0 N File:148 fence 2013.doc No edit summary current
- 08:2308:23, 4 January 2013 diff hist 0 N File:148 guard cable 2013.doc No edit summary current
- 08:2308:23, 4 January 2013 diff hist 0 N File:148 guardrail 2013.doc No edit summary current
- 08:2208:22, 4 January 2013 diff hist +35 m 147.3 Job Order Contracting (JOC) Per Bidding and Contract Services, updated JOC JSPs.
2 January 2013
- 08:2108:21, 2 January 2013 diff hist 0 m Main Page No edit summary
31 December 2012
- 14:0214:02, 31 December 2012 diff hist +44 m Main Page EPG 105.23
- 13:4413:44, 31 December 2012 diff hist +6,410 m Category:105 Control of Work Per CM, new subarticle. More info will follow. QM is now being included in almost all (95%) projects. QM is now being included in almost all projects. QM is not optional & is part of Bolder 5 Yr.
28 December 2012
- 14:2914:29, 28 December 2012 diff hist 0 m Main Page No edit summary
27 December 2012
- 13:1313:13, 27 December 2012 diff hist −5 m Main Page No edit summary
- 11:3511:35, 27 December 2012 diff hist +7 m Main Page No edit summary
- 11:3411:34, 27 December 2012 diff hist −7 m Main Page No edit summary
- 11:2111:21, 27 December 2012 diff hist 0 N File:748.7 Figure Example Grade Separation Profile without Borings.pdf No edit summary
- 11:1211:12, 27 December 2012 diff hist 0 N File:Main Page 3 Dec 27, 2012.jpg No edit summary current
- 11:1211:12, 27 December 2012 diff hist 0 N File:Main Page 2 Dec 27, 2012.jpg No edit summary current
- 11:1211:12, 27 December 2012 diff hist 0 N File:Main Page Dec 27, 2012.jpg No edit summary current
- 11:1111:11, 27 December 2012 diff hist −59 m Main Page new photos
- 09:5709:57, 27 December 2012 diff hist 0 N File:643.2 Certification of Consultant 2012.doc No edit summary current
- 09:5709:57, 27 December 2012 diff hist +10 m 643.2 Local Utility Adjustments - Public and Private Per Design, correct "Certification of Consultant" form now provided
- 08:1408:14, 27 December 2012 diff hist +207 m LPA:136.13 LPA Policy Changes Fig. 136.11.9
- 08:1208:12, 27 December 2012 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.11.9
- 08:1108:11, 27 December 2012 diff hist +8 m LPA:136.11 Local Public Agency Construction Per LPA, updated reference of Fig. 136.11.9 from "Contractor Certification" to "Contractor DBE Certification".
26 December 2012
- 09:3009:30, 26 December 2012 diff hist 0 m Main Page No edit summary
21 December 2012
- 15:2815:28, 21 December 2012 diff hist +185 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.12 Signal Indications – Design, Illumination, Color, and Shape (MUTCD Section 4D.06): Per Traffic, added reference to two documents
- 11:4411:44, 21 December 2012 diff hist 0 m LPA:136.13 LPA Policy Changes No edit summary
- 11:4311:43, 21 December 2012 diff hist +118 m LPA:136.13 LPA Policy Changes Fig. 136.4.17
- 11:4111:41, 21 December 2012 diff hist −3 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.17
- 11:4011:40, 21 December 2012 diff hist 0 N File:136.4.17 Dec 2012.xlsx No edit summary current
- 11:4011:40, 21 December 2012 diff hist −6 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, note in Fig. 136.4.17 added about PE ceiling or CE ceiling amounts
20 December 2012
- 13:3513:35, 20 December 2012 diff hist −320 m Main Page No edit summary
- 13:3313:33, 20 December 2012 diff hist 0 N File:Main Page Dec 20, 2012.jpg No edit summary current
- 13:3313:33, 20 December 2012 diff hist −516 m Main Page No edit summary
- 11:5511:55, 20 December 2012 diff hist −35 m Category:206 Excavation for Structures →206.2 Class 3 Excavation
- 10:5610:56, 20 December 2012 diff hist −59 m Main Page EPG 206
- 10:4310:43, 20 December 2012 diff hist 0 N File:206.2.jpg No edit summary current
- 10:4210:42, 20 December 2012 diff hist −114 Category:206 Excavation for Structures →206.2 Class 3 Excavation: Per CM, revision provides pay quantities that allow the contractor to bid more accurately
19 December 2012
- 14:4714:47, 19 December 2012 diff hist +1 m Main Page No edit summary
- 11:5211:52, 19 December 2012 diff hist +712 m Category:138 Project Development Chronology →Speaking of road maps...: added app info
- 08:1508:15, 19 December 2012 diff hist +167 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts: Per Design, updated links
18 December 2012
- 13:3313:33, 18 December 2012 diff hist +52 m Main Page E 101 QRG
- 13:3113:31, 18 December 2012 diff hist 0 N File:Sample Record General December 2012.docx No edit summary
- 13:3013:30, 18 December 2012 diff hist +14 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated Sample Record General QRG
- 11:0311:03, 18 December 2012 diff hist 0 m 903.5 Regulatory Signs →903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30) (MUTCD Sections 2B.53 and 2B.54)
- 10:5310:53, 18 December 2012 diff hist +27 m Main Page EPG 903.5.30