User contributions for Smithk
Jump to navigation
Jump to search
18 December 2012
- 09:1809:18, 18 December 2012 diff hist +17 m LPA:136.10 Advertisement for Bid and Project Award →136.10.7.1.2 Responsible Bidder: updated link
- 09:1509:15, 18 December 2012 diff hist +12 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.7: updated link
- 09:1409:14, 18 December 2012 diff hist +11 m 902.6 Pedestrian Control Features (MUTCD Chapter 4E) updated links
- 09:1309:13, 18 December 2012 diff hist −80 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) updated links
- 09:0809:08, 18 December 2012 diff hist +11 m 903.20 Signing for Bicycle Facilities updated link
- 09:0809:08, 18 December 2012 diff hist +11 m 234.6 Diverging Diamond Interchanges →234.6.2.2.12 Signals: updated link.
- 09:0509:05, 18 December 2012 diff hist +11 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.17 Do Not Block Intersection Markings (MUTCD Section 3B.17): updated link
- 09:0409:04, 18 December 2012 diff hist +11 m 903.19 Signing for Rail and Light Rail Transit Grade Crossings →903.20.8 Turn Restrictions During Preemption (MUTCD Section 8B.08): updated link
- 09:0309:03, 18 December 2012 diff hist +11 m Main Page No edit summary
- 09:0209:02, 18 December 2012 diff hist −12 m 903.5 Regulatory Signs →Table 903.5.3 Regulatory Sign and Plaque Sizes
- 09:0009:00, 18 December 2012 diff hist 0 N File:R10-30.jpg No edit summary current
- 08:5908:59, 18 December 2012 diff hist 0 N File:R10-15.jpg No edit summary current
- 08:5908:59, 18 December 2012 diff hist +437 m 903.5 Regulatory Signs Per Traffic, general clarifications to EPG 903.5.30.
- 07:3307:33, 18 December 2012 diff hist 0 Main Page No edit summary
- 07:2507:25, 18 December 2012 diff hist −159 m Main Page EPG 606.2.3
17 December 2012
- 14:3214:32, 17 December 2012 diff hist 0 m Main Page No edit summary
14 December 2012
- 07:4307:43, 14 December 2012 diff hist 0 m Main Page No edit summary
- 07:3907:39, 14 December 2012 diff hist 0 N File:Main Page Dec 14, 2012.jpg No edit summary current
- 07:3907:39, 14 December 2012 diff hist −74 m Main Page new photo
13 December 2012
- 10:4810:48, 13 December 2012 diff hist 0 N File:Main Page 4 Dec 13, 2012.jpg No edit summary current
- 10:4810:48, 13 December 2012 diff hist +54 m Main Page new photo
- 07:1107:11, 13 December 2012 diff hist −1 Main Page No edit summary
- 07:1007:10, 13 December 2012 diff hist +39 m Main Page No edit summary
12 December 2012
- 15:0915:09, 12 December 2012 diff hist +308 m 106.19 Materials Acceptance →106.19.2.3 Leftover Material: Per CM, clarification
- 14:5714:57, 12 December 2012 diff hist 0 N File:Main Page 3 Dec 12, 2012.jpg No edit summary current
- 14:5714:57, 12 December 2012 diff hist +653 m Main Page EPG 172
- 14:0414:04, 12 December 2012 diff hist −487 m Category:172 Maintenance Facility Performance Expectations Environmental Compliance Per Environmental, minor clarifications and added a link to tools to assist with SPCC plan development.
- 07:4607:46, 12 December 2012 diff hist 0 N File:Main Page Dec 12, 2012.jpg No edit summary current
- 07:4507:45, 12 December 2012 diff hist −122 m Main Page new photo
11 December 2012
- 13:4313:43, 11 December 2012 diff hist −54 m Main Page EPG 134
- 13:2713:27, 11 December 2012 diff hist +930 m Category:134 Engineering Professional Services Per Design, added numerous group email addresses as well as an adjustment in the distribution and copies of executed contracts.
10 December 2012
- 14:4014:40, 10 December 2012 diff hist +6 m 902.3 Traffic Control Signal Needs Studies (MUTCD Chapter 4C) Per Traffic, updated link
- 12:5412:54, 10 December 2012 diff hist −8 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per Design, forms presented in numerical order
- 11:1511:15, 10 December 2012 diff hist +101 m Main Page EPG 108.11
- 11:0111:01, 10 December 2012 diff hist +284 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): added links
- 10:5910:59, 10 December 2012 diff hist +141 m 104.13 Construction Inspection Guidance for Sec 104 →Concept Proposal: added link
- 10:5310:53, 10 December 2012 diff hist +1,717 m Category:108 Prosecution and Progress →108.11 Termination of Contract for Convenience of the Commission: Per CM, added guidance for more statewide consistency in resolving payment for leftover material.
- 08:0508:05, 10 December 2012 diff hist +526 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.11
- 08:0008:00, 10 December 2012 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 08:0008:00, 10 December 2012 diff hist 0 N File:136.9.3 Dec 2012.doc No edit summary
- 07:5907:59, 10 December 2012 diff hist +15 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LP Administrator, EPG 136.9.1.1.11 updated (bid proposal must state that the E-verify affidavit and MOU must be submitted prior to award of the contract). Also Fig. 136.9.3 clarified.
- 07:2807:28, 10 December 2012 diff hist 0 N File:139 Manchester Trafficway.jpg No edit summary current
- 07:2807:28, 10 December 2012 diff hist +290 m Category:139 Design - Build added link
6 December 2012
- 14:5814:58, 6 December 2012 diff hist +236 m 903.3 Ground-Mounted Sign Supports →903.3.1 Post-Mounted Sign Installation: Per Traffic, minor clarification
- 08:1208:12, 6 December 2012 diff hist +103 m Main Page EPG 234.6.2.2.14
- 07:5607:56, 6 December 2012 diff hist 0 N File:234.6.2.2.14 DDI.jpg No edit summary current
- 07:5507:55, 6 December 2012 diff hist +1,049 m 234.6 Diverging Diamond Interchanges →234.6.2.2.14 Signing: Per Traffic, additional guidance about the new DDI warning sign assembly
5 December 2012
- 14:3814:38, 5 December 2012 diff hist +153 m LPA:136.13 LPA Policy Changes Fig. 136.9.1
- 14:3714:37, 5 December 2012 diff hist −2 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per LPA, updated Fig. 136.9.1 with a minor revision
- 14:3614:36, 5 December 2012 diff hist 0 N File:136.9.1 Dec 5, 2012.xlsx No edit summary