User contributions for Smithk
Jump to navigation
Jump to search
29 October 2012
- 12:5612:56, 29 October 2012 diff hist 0 N File:Main Page Oct 29, 2012.jpg No edit summary current
- 12:5612:56, 29 October 2012 diff hist +69 m Main Page new photo
- 09:5209:52, 29 October 2012 diff hist 0 N File:147.6.jpg No edit summary current
- 09:5209:52, 29 October 2012 diff hist 0 m 147.3 Job Order Contracting (JOC) Per TP, updated figure
- 09:0909:09, 29 October 2012 diff hist 0 N File:146 CUF 2012.pdf No edit summary
- 09:0809:08, 29 October 2012 diff hist +15 m Category:146 Disadvantaged Business Enterprise (DBE) minor update of the CUF form
- 08:2608:26, 29 October 2012 diff hist −39 m Main Page EPG 236.17
- 08:2408:24, 29 October 2012 diff hist +12,993 m 236.17 Junkyards Per RW, minor clarifications
- 07:4007:40, 29 October 2012 diff hist −225 m Main Page EPG 612.1
- 07:2507:25, 29 October 2012 diff hist +396 m Category:612 Impact Attenuators →612.1 Truck- and Trailer-Mounted Attenuators: Per Traffic, additional guidance about hauling material in the back of a TMA.
26 October 2012
- 12:4912:49, 26 October 2012 diff hist 0 N File:902.11 Advance Flasher Figures 2012.doc No edit summary current
- 12:4812:48, 26 October 2012 diff hist +5 m 902.12 Flashing Beacons (MUTCD Chapter 4L) →902.12.7 Procedures For Advance Beacon Installations by Outside Parties: Updated Fig. 902.11 to correct an EPG article reference.
- 12:1912:19, 26 October 2012 diff hist −5,870 m 751.40 LFD Widening and Repair →751.40.2 Typical Sections of Concrete Repairs: Per Bridge, replaced deck repair and filled joint figures and guidance with links
25 October 2012
- 13:3113:31, 25 October 2012 diff hist +30 m Main Page EPG 134
- 13:2813:28, 25 October 2012 diff hist +368 m LPA:136.13 LPA Policy Changes EPG 136.4
- 13:2713:27, 25 October 2012 diff hist 0 N File:Fig. 136.4.14 2012.doc No edit summary current
- 13:2613:26, 25 October 2012 diff hist +15 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated Fig. 136.4.14 to reflect changing mileage reimbursable rates from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
- 13:2213:22, 25 October 2012 diff hist +64 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7.2 Basis of Payment: Per LP, changed the mileage reimbursable rates from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
- 13:2013:20, 25 October 2012 diff hist +64 m Category:134 Engineering Professional Services →134.3.5 Basis of Payment: Per Design, changed the mileage reimbursable rates from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
- 12:5512:55, 25 October 2012 diff hist −2 m 751.50 Standard Detailing Notes →A4b. Steel Structures- Weathering Steel: Per Bridge, minor correction
- 12:2312:23, 25 October 2012 diff hist 0 m Main Page No edit summary
24 October 2012
- 09:4309:43, 24 October 2012 diff hist 0 N File:Figure 903.2.26.1 2012.jpg No edit summary current
- 09:4309:43, 24 October 2012 diff hist +5 m 903.2 Extent of Signing →903.2.26 Location Standardization (MUTCD Section 2A.16): Per Traffic, updated figure to correspond to EPG guidance
23 October 2012
- 14:0614:06, 23 October 2012 diff hist −131 m 903.6 Warning Signs →903.6.6 Placement of Warning Signs (MUTCD Section 2C.05)
- 14:0414:04, 23 October 2012 diff hist +30 m Main Page EPG 903.6.6
- 13:4813:48, 23 October 2012 diff hist +10 m 903.6 Warning Signs →903.6.6 Placement of Warning Signs (MUTCD Section 2C.05)
- 13:4613:46, 23 October 2012 diff hist +433 m 903.6 Warning Signs →903.6.6 Placement of Warning Signs (MUTCD Section 2C.05): Per Traffic, added a statement reiterating useful guidance for the districts
- 13:3613:36, 23 October 2012 diff hist −11 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.46 STEEL PLATE AHEAD Sign (WO8-24) (MUTCD 6F.46): Per Traffic, minor clarification
- 06:0806:08, 23 October 2012 diff hist +314 m LPA:136.13 LPA Policy Changes Fig. 136.12 removed
- 06:0506:05, 23 October 2012 diff hist −101 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.3.1 Commonly Used Forms: Per LPA, removed "Fig. 136.12 Sample Form for Submitting Invoices". This form is out-of-date and has been relabeled elsewhere.
22 October 2012
- 12:4912:49, 22 October 2012 diff hist +2 m LPA:136.13 LPA Policy Changes No edit summary
- 12:4812:48, 22 October 2012 diff hist +113 LPA:136.13 LPA Policy Changes Fig. 136.9.12
- 12:4712:47, 22 October 2012 diff hist −2 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, slightly modified cross slope compliance guidance in Fig. 136.9.12
- 12:4612:46, 22 October 2012 diff hist 0 N File:136.9.12 Oct 2012.doc No edit summary current
- 12:4612:46, 22 October 2012 diff hist −1 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, slightly modified cross slope compliance guidance in Fig. 136.9.12
- 10:2110:21, 22 October 2012 diff hist −31 m Main Page EPG 101
- 09:5309:53, 22 October 2012 diff hist 0 N File:Job Order Contracts Oct 22, 2012.docx No edit summary
- 09:5209:52, 22 October 2012 diff hist 0 N File:101 Request for Transfer of Inpsected Materials.pdf No edit summary
- 09:5109:51, 22 October 2012 diff hist −35 m Category:101 Standard Forms Per CM, updated two forms. One of the forms, "Request for Transfer of Inspected Materials", was completely replaced with new form with same title.
19 October 2012
- 14:0214:02, 19 October 2012 diff hist +6 m Main Page No edit summary
- 12:3012:30, 19 October 2012 diff hist 0 m Main Page No edit summary
18 October 2012
- 13:1913:19, 18 October 2012 diff hist 0 N File:104.11 Completed SIMS form 2012.pdf No edit summary
- 13:1813:18, 18 October 2012 diff hist +2 m 104.11 Project Scoping Documentation Updated completed SIMS form
- 13:1313:13, 18 October 2012 diff hist +84 m Main Page No edit summary
- 12:2412:24, 18 October 2012 diff hist 0 N File:Main Page 3 Oct 18, 2012.jpg No edit summary current
- 12:2412:24, 18 October 2012 diff hist 0 N File:Main Page 2 Oct 18, 2012.jpg No edit summary current
- 12:2412:24, 18 October 2012 diff hist 0 N File:Main Page Oct 18, 2012.jpg No edit summary current
- 12:2312:23, 18 October 2012 diff hist −51 m Main Page new photos
- 11:5711:57, 18 October 2012 diff hist +95 m Main Page EPG 616.23, QRG, EPG FAST
- 11:3811:38, 18 October 2012 diff hist −1,131 m Federal-Aid Acceptance Sampling and Testing Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing approach on "On-system" work. current