User contributions for Smithk
Jump to navigation
Jump to search
30 August 2012
- 08:5808:58, 30 August 2012 diff hist +238 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, "Federal-Aid Program Overview" video replaced with three other videos
- 08:2008:20, 30 August 2012 diff hist +1,807 m Category:107 Legal Relations and Responsibility to the Public →107.13 Insurance Requirements: Per CM, added guidance to help REs understand when this special type of insurance is required and what is needed to verify coverage
- 07:4807:48, 30 August 2012 diff hist −2 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) No edit summary
- 07:1907:19, 30 August 2012 diff hist −8 m 620.12 Construction Inspection for Sec 620 →620.12.2.2 Permanent Pavement Marking (Sec 620.2.2): updated link
- 07:1507:15, 30 August 2012 diff hist −35 m Category:Safe and Sound →Pavements and Depth Transitions: updated link
- 07:1107:11, 30 August 2012 diff hist −47 m Category:643 Utility Procedures updated link
- 07:0707:07, 30 August 2012 diff hist −37 m 133.5 Operator’s Guide for Anti-Icing →133.5.2 Glossary: updated link
- 06:5806:58, 30 August 2012 diff hist −47 m 236.13 Designing Right of Way Plans →236.13.2.1 Major Routes: updated link
- 06:5706:57, 30 August 2012 diff hist −35 m 616.14 Work Zone Safety and Mobility Policy →616.14.8 Significant Projects: updated link
- 06:4906:49, 30 August 2012 diff hist −35 m 626.3 Construction Inspection Guidelines for Sec 626 updated link
- 06:4106:41, 30 August 2012 diff hist −47 m 643.3 Policy, Standards and Regulations →643.3.4.1 Major Routes: updated link
- 06:3906:39, 30 August 2012 diff hist −47 m 606.1 Guardrail →606.1.3.9 Bridge Ends: updated link
- 06:3706:37, 30 August 2012 diff hist −35 m 822.5 Definitions updated link
- 06:3606:36, 30 August 2012 diff hist −47 m 231.4 Shoulder Width →231.4.1.1 Rural Major Routes: updated link
- 06:3406:34, 30 August 2012 diff hist −47 m Category:170 Maintenance Activity Planning Guidelines →Introduction: updated link
- 06:3006:30, 30 August 2012 diff hist −47 m Category:232 Facility Selection updated link
- 06:2906:29, 30 August 2012 diff hist −43 m Category:626 Rumble Strips updated links
- 06:2006:20, 30 August 2012 diff hist −8 m Category:503 Bridge Approach Slabs →503.1 Major Roads: updated link
- 06:1706:17, 30 August 2012 diff hist −140 m Category:144 Practical Operations Updated link
- 06:1606:16, 30 August 2012 diff hist 0 N File:Major highways.pdf No edit summary
29 August 2012
- 11:0311:03, 29 August 2012 diff hist −26 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7.3.1 Subconsultant cost exceeding $25,000: minor clarification
- 11:0111:01, 29 August 2012 diff hist +62 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7.3.1 Subconsultant cost exceeding $25,000: updated link
- 09:5409:54, 29 August 2012 diff hist −23 m Main Page EPG 134.
- 09:3309:33, 29 August 2012 diff hist +471 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: EPG 136.4.1.5 and EPG 136.4.3.2
- 09:2909:29, 29 August 2012 diff hist +2 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.2 Supplement Agreements: Minor clarification, per LPA
- 09:2609:26, 29 August 2012 diff hist −66 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.2 Supplement Agreements: Per LPA, DBE requirement guidance clarified
- 09:2109:21, 29 August 2012 diff hist +1,277 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1.5 Consultant Qualification: Per LP, clarification of guidance.
- 09:1809:18, 29 August 2012 diff hist +613 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per Design, clarified guidance
- 07:3907:39, 29 August 2012 diff hist +61 m Category:134 Engineering Professional Services Updated links, per Design
28 August 2012
- 10:2010:20, 28 August 2012 diff hist −70 m Main Page EPG 751.11 and EPG 613
- 10:0810:08, 28 August 2012 diff hist +28 m Category:613 Pavement Repair →Method of Measurement: inserted link
- 09:5109:51, 28 August 2012 diff hist −29 m Category:712 Structural Steel Construction →712.2.4.1 High Strength Bolts: Per Bridge, removed reference to AASHTO M164 since it has been deleted by AASHTO.
- 09:4409:44, 28 August 2012 diff hist −6 m 902.20 Material Inspection for Sec 902 →Procedure: Per Bridge, revised AASHTO M164 to ASTM A 325 since former has been deleted by AASHTO.
- 09:4009:40, 28 August 2012 diff hist 0 N File:751.11.3.5 Swedge Notes.jpg No edit summary current
- 09:4009:40, 28 August 2012 diff hist 0 N File:751.11.3.5 Detail Wells and Reinforcement.jpg No edit summary current
- 09:3909:39, 28 August 2012 diff hist 0 N File:751.11.3.5 Part Plan.jpg No edit summary current
- 09:3809:38, 28 August 2012 diff hist 0 N File:751.11.3.3 Part Plan.jpg No edit summary current
- 09:3809:38, 28 August 2012 diff hist 0 N File:751.11.3.3 Sec AA.jpg No edit summary current
- 09:3709:37, 28 August 2012 diff hist 0 N File:751.11.3.2.2 Laminated Fixed.jpg No edit summary current
- 09:3709:37, 28 August 2012 diff hist 0 N File:751.11.3.2.1 Laminated Fixed.jpg No edit summary current
- 09:3709:37, 28 August 2012 diff hist 0 N File:751.11.3.2.2 Laminated Expansion.jpg No edit summary current
- 09:3609:36, 28 August 2012 diff hist 0 N File:751.11.3.2.1 Laminated Expansion.jpg No edit summary current
- 09:3609:36, 28 August 2012 diff hist 0 N File:751.11.3.1.2.jpg No edit summary current
- 09:3509:35, 28 August 2012 diff hist 0 N File:751.11.3.1.1.jpg No edit summary current
- 09:3409:34, 28 August 2012 diff hist −86 m 751.11 Bearings Per Bridge, clarification. Change requirement for anchor bolts used on weathering steel bridges to coated w/ inorganic zinc primer. Secondary, change "rod" to "bolt" as in "anchor bolt".
- 07:3307:33, 28 August 2012 diff hist +299 m 751.50 Standard Detailing Notes →H3. Bearings: Per Bridge, clarification. Change requirement for anchor bolts used on weathering steel bridges to coated w/ inorganic zinc primer. Secondary, change "rod" to "bolt"
- 06:2606:26, 28 August 2012 diff hist +280 m Category:613 Pavement Repair →Method of Measurement: Clarification, per CM. New guidance, Dowel Bars, instructs designers calculating quantities for full depth repairs that each dowel bar is counted separately as a pay item
27 August 2012
- 12:5912:59, 27 August 2012 diff hist −98 m LPA:136.2 Certification and Training Non-functioning link to tutorial removed, per CM and LPA.
- 12:5312:53, 27 August 2012 diff hist −100 m 106.18 Technician Certification Program Non-functioning link to tutorial removed, per CM.
- 12:3612:36, 27 August 2012 diff hist +755 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: FHWA video links added