User contributions for Smithk
Jump to navigation
Jump to search
25 July 2012
- 15:1015:10, 25 July 2012 diff hist 0 N File:148.6.jpg No edit summary current
- 15:1015:10, 25 July 2012 diff hist 0 N File:148.6 email.jpg No edit summary current
- 15:1015:10, 25 July 2012 diff hist 0 N File:148.3.jpg No edit summary
- 15:0915:09, 25 July 2012 diff hist 0 N File:148 asphalt pavement repair.doc No edit summary current
- 15:0915:09, 25 July 2012 diff hist 0 N File:148 bridge.doc No edit summary current
- 15:0915:09, 25 July 2012 diff hist 0 N File:148 concrete pavement repair.doc No edit summary current
- 15:0915:09, 25 July 2012 diff hist 0 N File:148 fence.doc No edit summary current
- 15:0915:09, 25 July 2012 diff hist 0 N File:148 guard cable.doc No edit summary current
- 15:0815:08, 25 July 2012 diff hist 0 N File:148 guardrail.doc No edit summary current
- 15:0215:02, 25 July 2012 diff hist 0 N File:148.jpg No edit summary current
- 15:0115:01, 25 July 2012 diff hist +14,634 N 147.3 Job Order Contracting (JOC) New page: right|300px MoDOT uses a procurement process called Job Order Contracting (JOC) for traditional on-call maintenance repair contracts, including asphalt and concrete pavem...
- 15:0015:00, 25 July 2012 diff hist +8,248 N 147.2 Add Alternate Bidding New page: ==147.2.1 Purpose of Add Alternate Bidding== In an effort to fully utilize the budget available and maximize the amount of work awarded within a project budget, the district may use a bid...
- 14:5914:59, 25 July 2012 diff hist +65 m Category:100 GENERAL added link
- 14:5814:58, 25 July 2012 diff hist 0 N File:147.3.3.pdf No edit summary
- 14:5814:58, 25 July 2012 diff hist 0 N File:147.3.2 Rte 65.pdf No edit summary
- 14:5714:57, 25 July 2012 diff hist 0 N File:147.3.2.pdf No edit summary
- 14:5714:57, 25 July 2012 diff hist 0 N File:147.3.1.pdf No edit summary
- 14:5614:56, 25 July 2012 diff hist +10,956 N 147.1 Alternative Technical Concepts New article
- 14:5514:55, 25 July 2012 diff hist +2,538 N Category:147 Innovative Contracting New article, per Design
- 14:4614:46, 25 July 2012 diff hist +822 Category:450 Bituminous Pavement Design New safety edge guidance, per Design
- 14:2814:28, 25 July 2012 diff hist +79 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: added link
- 14:2414:24, 25 July 2012 diff hist +40 m 606.1 Guardrail Added link, and clarified a statement, per EP Administrator
- 09:2009:20, 25 July 2012 diff hist −115 m Main Page EPG 606.2.4.1
24 July 2012
- 15:1115:11, 24 July 2012 diff hist −239 m Main Page TM-64 and TM-67
- 14:5614:56, 24 July 2012 diff hist −5,027 m 106.3.2.67 TM-67, Preparation of Concrete for Use in AASHTO T161 Freeze and Thaw TM-67 was deleted, per CM. It is no longer valid. current
- 14:5514:55, 24 July 2012 diff hist −3,080 m 106.3.2.64 TM-64, Void Detection and Undersealing Verification Testing of Concrete Pavement with a Falling Weight Deflectometer TM-64 was deleted, per CM. It is no longer valid.
- 14:5214:52, 24 July 2012 diff hist +248 m 106.3.2.62 TM-62, Prequalification of Dust Suppressants Moved AASHTO T 119 video from deleted EPG 103.6.2.67 TM-67 to this article. current
- 13:5613:56, 24 July 2012 diff hist −85 m Category:1001 General Requirements for Material Per CM, link removed.
- 13:5213:52, 24 July 2012 diff hist −129 m 106.3.2.62 TM-62, Prequalification of Dust Suppressants Per CM, link removed.
- 13:4913:49, 24 July 2012 diff hist +2 m 106.3.2.62 TM-62, Prequalification of Dust Suppressants No edit summary
23 July 2012
- 12:3612:36, 23 July 2012 diff hist 0 N File:134.2.2.5.4 July 2012.doc No edit summary current
- 12:3612:36, 23 July 2012 diff hist 0 N File:134.5.2 July 2012.docx No edit summary
- 12:3512:35, 23 July 2012 diff hist 0 N File:134.4.1 July 2012.docx No edit summary
- 12:3512:35, 23 July 2012 diff hist 0 N File:134.2.2.5.3 July 2012.doc No edit summary current
- 12:3512:35, 23 July 2012 diff hist +100 m Category:134 Engineering Professional Services Per Design, updated several figures to meet the PSC approval requests
- 10:1910:19, 23 July 2012 diff hist +1 m 903.6 Warning Signs →903.6.50 SHARE THE ROAD Supplemental Plaque (W16-1P) (MUTCD Section 2C.60)
- 10:1810:18, 23 July 2012 diff hist +239 m 903.6 Warning Signs →903.6.50 SHARE THE ROAD Supplemental Plaque (W16-1P) (MUTCD Section 2C.60): added two links
- 10:1010:10, 23 July 2012 diff hist 0 N File:134.5.1.1 July 2012.xlsx No edit summary current
- 10:0910:09, 23 July 2012 diff hist +20 m Category:134 Engineering Professional Services Fig. 134.5.1.1 updated with a minor revision, per LPA
- 10:0510:05, 23 July 2012 diff hist +132 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: Fig. 136.4.10 updated
- 10:0210:02, 23 July 2012 diff hist 0 N File:136.4.10 July 23, 2012.xlsx No edit summary current
- 10:0110:01, 23 July 2012 diff hist +8 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, minor update to Fig. 136.4.10
- 09:5209:52, 23 July 2012 diff hist +1 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: minor update
- 09:3409:34, 23 July 2012 diff hist +2 m 751.22 Prestressed Concrete I Girders →751.22.2.4 Shear
- 09:3109:31, 23 July 2012 diff hist +47 m 751.22 Prestressed Concrete I Girders added a link, and updated a link
- 09:2609:26, 23 July 2012 diff hist +53 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: added links, per Bridge
- 09:0809:08, 23 July 2012 diff hist +358 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: EPG 136.4.2.4.1
- 09:0609:06, 23 July 2012 diff hist +114 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.4.1 Advertising on MoDOT’s Site: Per LPA, clarified guidance by adding "When advertising on MoDOT's website, the LPA can choose to also advertise in a newspaper but it is not required."
- 08:1308:13, 23 July 2012 diff hist +109 m Main Page EPG 236.5.18
- 07:3707:37, 23 July 2012 diff hist +134 m 236.5 Property Management →236.5.18 Categorical Exclusion (CE) Review: Per RW, update allows the review time for a CE to be extended from 1 to 3 years.