User contributions for Smithk
Jump to navigation
Jump to search
23 July 2012
- 06:1106:11, 23 July 2012 diff hist 0 m Category:822 Roadside Vegetation Management Per Maintenance, minor correction
19 July 2012
- 11:5111:51, 19 July 2012 diff hist −41 m Main Page EPG 751.50
- 11:3311:33, 19 July 2012 diff hist +179 m 751.22 Prestressed Concrete I Girders →751.22.2.3 Flexure: Per Bridge, minor clarification about effective slab thickness
- 11:3111:31, 19 July 2012 diff hist +155 m 751.14 Steel Superstructure →751.14.4.1 General: Per Bridge, minor clarification about effective slab thickness
- 11:2811:28, 19 July 2012 diff hist +77 m 751.36 Driven Piles Per Bridge, minor clarifications
- 11:2511:25, 19 July 2012 diff hist −3 m 751.10 General Superstructure Per Bridge, minor clarifications
- 11:2111:21, 19 July 2012 diff hist +685 m 751.50 Standard Detailing Notes Per Bridge, minor edits for clarifications
- 11:0311:03, 19 July 2012 diff hist +1,592 m 751.50 Standard Detailing Notes Per Bridge, the C2 and H2 notes in E 751.50 were reorganized.
18 July 2012
- 08:1008:10, 18 July 2012 diff hist 0 N File:Main Page July 18, 2012.jpg No edit summary current
- 08:0908:09, 18 July 2012 diff hist −121 m Main Page new photo
- 07:1407:14, 18 July 2012 diff hist +71 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.1 update
- 07:1107:11, 18 July 2012 diff hist 0 N File:Fig. 136.4.1.docx No edit summary
- 07:0707:07, 18 July 2012 diff hist −1 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, minor clarifications to Fig. 136.4.1.
- 06:3706:37, 18 July 2012 diff hist −214 m Category:134 Engineering Professional Services Per Design, updated several links
- 06:2706:27, 18 July 2012 diff hist +308 m LPA:136.12 Figures, Glossary and Other Useful Links EPG 136.4 and Fig. 136.4.17.
- 06:2306:23, 18 July 2012 diff hist 0 N File:136.4.17 July 2012.xlsx No edit summary current
- 06:2106:21, 18 July 2012 diff hist +88 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated links and Fig. 136.4.17 and corrected attachment references
17 July 2012
- 11:1011:10, 17 July 2012 diff hist +100 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.10 updated
- 11:0711:07, 17 July 2012 diff hist 0 File:136.4.10 July 2012.xlsx uploaded a new version of "Image:136.4.10 July 2012.xlsx" current
- 11:0711:07, 17 July 2012 diff hist 0 N File:136.4.10 July 2012.xlsx No edit summary
- 11:0511:05, 17 July 2012 diff hist +20 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated Fig. 136.4.10 with minor changes
- 07:0407:04, 17 July 2012 diff hist +1 m Category:1033 Precast Drainage Units →1033.2 Procedure: minor correction
- 06:4106:41, 17 July 2012 diff hist +311 m LPA:136.7 Design →136.7.5 Innovative Contracting: Per LPA, added links
- 06:3306:33, 17 July 2012 diff hist +253 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: clarification
- 06:3106:31, 17 July 2012 diff hist +12 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.2.3 Utility Status: Per LPA, clarification: "bid opening" replaced with "construction obligation".
16 July 2012
- 13:4113:41, 16 July 2012 diff hist 0 N File:402 Contract Leveling Course Guidelines July 16, 2012.doc No edit summary current
- 13:4013:40, 16 July 2012 diff hist 0 m Category:402 Bituminous Surface Leveling Per Design, CLC Guidelines further revised (the list of pay items was corrected)
- 09:0409:04, 16 July 2012 diff hist 0 N File:Main Page July 16, 2012.jpg No edit summary current
- 09:0309:03, 16 July 2012 diff hist −1 m Main Page new photo
13 July 2012
- 13:2213:22, 13 July 2012 diff hist +142 m Main Page EPG 402
- 12:5212:52, 13 July 2012 diff hist 0 N File:402 CLC Templates July 13, 2012.pdf No edit summary
- 12:5112:51, 13 July 2012 diff hist 0 N File:402 JSP July 13, 2012.doc No edit summary current
- 12:5012:50, 13 July 2012 diff hist 0 File:402 Contract Leveling Course Guidelines July 13, 2012.pdf uploaded a new version of "Image:402 Contract Leveling Course Guidelines July 13, 2012.pdf"
- 12:5012:50, 13 July 2012 diff hist 0 N File:402 Contract Leveling Course Guidelines July 13, 2012.pdf No edit summary
- 12:4912:49, 13 July 2012 diff hist +4 m Category:402 Bituminous Surface Leveling Per Design, updated Contract Leveling Course Guidelines, JSPs for CLC and PDFs of the Contract Leveling Course Plan Templates
- 12:3012:30, 13 July 2012 diff hist +46 m Category:128 Conceptual Studies →128.2 Preventive Maintenance Projects (1R and 2R): added link
- 08:2108:21, 13 July 2012 diff hist −13 m Main Page No edit summary
- 06:1706:17, 13 July 2012 diff hist −55 m 903.11 Specific Service Signs - Logos →903.11.2 Application (MUTCD Section 2J.02): Per Traffic, "No service type shall appear on more than one sign." removed, since it is no longer true.
12 July 2012
- 12:4212:42, 12 July 2012 diff hist +11 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.1 updated
- 12:4112:41, 12 July 2012 diff hist 0 N File:136.9.1 July 2012.xlsx No edit summary
- 12:4012:40, 12 July 2012 diff hist −15 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated Fig. 136.9.1 with a minor revision
- 10:1710:17, 12 July 2012 diff hist +47 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.18 updated
- 10:1510:15, 12 July 2012 diff hist 0 N File:136.4.18.docx No edit summary
- 10:1510:15, 12 July 2012 diff hist −28 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, Fig. 136.4.18 updated with minor corrections
- 09:5809:58, 12 July 2012 diff hist +80 m Main Page EPG 238.3.37
- 09:3709:37, 12 July 2012 diff hist +1,760 m 238.3 Route Surveying →238.3.37 Bridge survey information: Per Bridge, guidance for setting valley sections was improved
11 July 2012
- 13:5413:54, 11 July 2012 diff hist +11 m 238.3 Route Surveying →238.3.42 Recording accuracy: minor clarification
- 12:3112:31, 11 July 2012 diff hist −274 m Main Page EPG 121.3 STIP
- 12:1812:18, 11 July 2012 diff hist −24 m 121.3 The Statewide Transportation Improvement Program (STIP) Updated STIP links
- 12:1812:18, 11 July 2012 diff hist −12 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) Updated STIP link