User contributions for Smithk
Jump to navigation
Jump to search
27 April 2012
- 13:0713:07, 27 April 2012 diff hist 0 N File:207.4.jpg No edit summary current
- 13:0513:05, 27 April 2012 diff hist +98 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.1 Yellow Centerline Pavement Markings and Warrants (MUTCD Section 3B.01): added photo
- 13:0413:04, 27 April 2012 diff hist 0 N File:620.2.1.jpg No edit summary current
- 07:4707:47, 27 April 2012 diff hist +176 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: EPG 136.6.4.8
- 07:4607:46, 27 April 2012 diff hist +27 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.8 Stormwater and Erosion Control: Per Design, in paragraph #3, SWPPP does not need to be site-specific, but the erosion control plan does need to be site-specific.
- 07:4107:41, 27 April 2012 diff hist +276 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy
- 07:3707:37, 27 April 2012 diff hist +193 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.8 Stormwater and Erosion Control: Per Design, clarified guidance on the need for a erosion control plan
- 07:3207:32, 27 April 2012 diff hist +67 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →1020.3 Sample Record: Per CM, updated form
- 07:3107:31, 27 April 2012 diff hist +27 m Category:101 Standard Forms →Materials Related: Per CM, updated form
26 April 2012
- 13:2213:22, 26 April 2012 diff hist −134 m Main Page EPG 135.1
- 13:0913:09, 26 April 2012 diff hist 0 N File:135.doc No edit summary current
- 13:0713:07, 26 April 2012 diff hist −1,355 m Category:135 The Section 106 Process Per Environmental, revision reflects the new guidance for Local Public Agencies.
- 12:5212:52, 26 April 2012 diff hist +103 m 751.5 Structural Detailing Guidelines →751.5.2.2 Boring Data Sheet: Per Bridge, replace figure of boring log with two new figures of this log.
- 12:4912:49, 26 April 2012 diff hist 0 N File:751.5.2.2 Ex 2.jpg No edit summary current
- 12:4912:49, 26 April 2012 diff hist 0 N File:751.5.2.2 Ex 1.jpg No edit summary current
- 12:3212:32, 26 April 2012 diff hist −55 m Category:101 Standard Forms →Scoping: Per Design, updated three forms
- 12:3012:30, 26 April 2012 diff hist 0 N File:104.6 Project Scoping Checklist Apr 26, 2012.doc No edit summary current
- 12:3012:30, 26 April 2012 diff hist 0 N File:104.6 Project Development Liaison Checklist Apr 26, 2012.doc No edit summary current
- 12:3012:30, 26 April 2012 diff hist 0 N File:104.6 Design Checklist Apr 26, 2012.doc No edit summary current
- 12:3012:30, 26 April 2012 diff hist +50 m 104.6 Project Scoping Checklists Per Design, updated three forms
- 09:1409:14, 26 April 2012 diff hist +33 m Where to Find PDM Information in the EPG No edit summary
- 09:1209:12, 26 April 2012 diff hist +398 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: Per Traffic, updated links
- 08:4408:44, 26 April 2012 diff hist +86 m Main Page E 124
- 08:3908:39, 26 April 2012 diff hist +113 m 104.6 Project Scoping Checklists Per Design, added new Project Estimate Record Sheet form.
- 08:3608:36, 26 April 2012 diff hist +312 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Design, added new Project Estimate Record Sheet form. Other minor updates.
- 08:3008:30, 26 April 2012 diff hist 0 N File:124 Project Estimate Record Sheet.xlsx No edit summary current
- 08:0608:06, 26 April 2012 diff hist +117 m Main Page video link
25 April 2012
- 11:0311:03, 25 April 2012 diff hist −121 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per ECR, the Spanish version of MCHR9 is not required at the project site and was removed from the listing.
- 10:2210:22, 25 April 2012 diff hist +40 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.85 Temporary Traffic Barriers (MUTCD 6F.85): updated link
- 10:1710:17, 25 April 2012 diff hist +6 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.60 Portable Changeable Message Signs (MUTCD 6F.60)
- 09:2909:29, 25 April 2012 diff hist +6 m Category:101 Standard Forms →Forms for Contractor Use
- 09:2509:25, 25 April 2012 diff hist −6 m Category:101 Standard Forms →Posters, State Aid
- 09:2509:25, 25 April 2012 diff hist −6 m Category:101 Standard Forms →Posters, Federal Aid
- 09:2409:24, 25 April 2012 diff hist −3,141 m Category:101 Standard Forms →Forms for Contractor Use: Per ECR, established new link for posters
- 08:4808:48, 25 April 2012 diff hist +30 m Category:950 Automated Traffic Enforcement added photo
- 08:4708:47, 25 April 2012 diff hist 0 N File:950.jpg No edit summary current
24 April 2012
- 14:5314:53, 24 April 2012 diff hist 0 N File:136.6.14 Apr 24, 2012.doc No edit summary current
- 14:5314:53, 24 April 2012 diff hist 0 N File:136.6.3 Apr 24, 2012.doc No edit summary
- 14:5214:52, 24 April 2012 diff hist +26 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: updated forms
- 14:5114:51, 24 April 2012 diff hist +52 m LPA:136.6 Environmental and Cultural Requirements Updated forms, per Environmental
- 14:4314:43, 24 April 2012 diff hist 0 N File:751.5 Apr 2012.jpg No edit summary current
- 14:4214:42, 24 April 2012 diff hist +9 m 751.5 Structural Detailing Guidelines →751.5.2.1 Front Sheet: Per Bridge, corrected figure
- 14:2514:25, 24 April 2012 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Part Section Apr 2012.jpg No edit summary current
- 14:2514:25, 24 April 2012 diff hist +9 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Curb with Thrie Beam Rail: Per Bridge, corrected figure
- 13:5113:51, 24 April 2012 diff hist −128 m Main Page EPG 950, etc.
- 13:3713:37, 24 April 2012 diff hist +1 m Category:1029 Fabricating Prestressed Concrete Members for Bridges →1029.2.8.1 Concrete Testing
- 13:3613:36, 24 April 2012 diff hist +3,363 Category:1029 Fabricating Prestressed Concrete Members for Bridges →1029.2 Procedure: Per CM, revision tolerates greater sweep in precast products and align MoDOT guidance with industry practices.
- 13:0313:03, 24 April 2012 diff hist +67 m Category:900 TRAFFIC CONTROL added link
- 13:0113:01, 24 April 2012 diff hist 0 N File:950.2.jpg No edit summary current
- 13:0113:01, 24 April 2012 diff hist 0 N File:950 photo enforced and plaque.jpg No edit summary current