User contributions for Smithk
Jump to navigation
Jump to search
6 March 2012
- 12:5212:52, 6 March 2012 diff hist 0 m 751.8 Concrete Box Culverts →751.8.1.5 Precast Culvert: Per Bridge, corrected link
- 11:2811:28, 6 March 2012 diff hist −141 m Category:130 Value Engineering Per CM, updated VE Change Proposal C-104
- 11:2511:25, 6 March 2012 diff hist 0 N File:C-104.doc No edit summary current
- 11:2511:25, 6 March 2012 diff hist −70 m Category:101 Standard Forms →Construction and Contractor Related: Per CM, updated VE Change Proposal C-104
- 11:1511:15, 6 March 2012 diff hist +69 m Category:1002 Aggregate for Asphaltic Concrete →1002.4 Qualified Mineral Filler for Stone Matrix Asphalt (SMA): Per CM, added link to suppliers for Qualified Mineral Filler for SMA.
- 11:1311:13, 6 March 2012 diff hist +159 m 460.3 Plant Inspection →460.3.9 Mineral Filler, Hydrated Lime, and Baghouse Fines: Per CM, added link to suppliers for Qualified Mineral Filler for SMA.
- 10:4910:49, 6 March 2012 diff hist −48 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Special Warning Signs (MUTCD 6F.51): Per Traffic and Design, "Drive Smart" and "Pt of Presence" signs are no longer Commission furnished.
- 10:2410:24, 6 March 2012 diff hist +131 m Category:900 TRAFFIC CONTROL updated link
- 10:0810:08, 6 March 2012 diff hist −358 m Main Page E 616
- 09:5609:56, 6 March 2012 diff hist +48 m 616.23 Traffic Control for Field Operations added link
- 09:3809:38, 6 March 2012 diff hist +63 N 616.30 Work Zone Capacity, Queue and Travel Delay 616.30 Work Zone Capacity, Queue and Travel Delay moved to 616.13 Work Zone Capacity, Queue and Travel Delay: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD. current
- 09:3809:38, 6 March 2012 diff hist 0 m 616.13 Work Zone Capacity, Queue and Travel Delay 616.30 Work Zone Capacity, Queue and Travel Delay moved to 616.13 Work Zone Capacity, Queue and Travel Delay: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.
- 09:3309:33, 6 March 2012 diff hist +303 m Category:616 Temporary Traffic Control →2009 MUTCD Compliance: adjusted table
- 09:0609:06, 6 March 2012 diff hist 0 N File:616 Special.jpg No edit summary current
- 09:0609:06, 6 March 2012 diff hist 0 N File:616 WO8-15.jpg No edit summary current
- 09:0509:05, 6 March 2012 diff hist 0 N File:616 GO23-1.jpg No edit summary current
- 09:0509:05, 6 March 2012 diff hist 0 N File:616 GO20-5aP.jpg No edit summary current
- 09:0509:05, 6 March 2012 diff hist 0 N File:616 WO8-12 old.jpg No edit summary current
- 09:0509:05, 6 March 2012 diff hist 0 N File:616 WO8-12.jpg No edit summary current
- 09:0409:04, 6 March 2012 diff hist 0 N File:616 WO12-3a.jpg No edit summary current
- 09:0409:04, 6 March 2012 diff hist 0 N File:616 WO12-2a.jpg No edit summary current
- 09:0409:04, 6 March 2012 diff hist 0 N File:616 WO8-9a.jpg No edit summary current
- 09:0409:04, 6 March 2012 diff hist 0 N File:616 WO8-17.jpg No edit summary current
- 09:0409:04, 6 March 2012 diff hist 0 N File:616 WO20-5a old.jpg No edit summary current
- 09:0309:03, 6 March 2012 diff hist 0 N File:616 Sign and Device Legend, Mar 6, 2012.pdf No edit summary
- 09:0209:02, 6 March 2012 diff hist 0 N File:616 WO20-5a.jpg No edit summary current
- 09:0109:01, 6 March 2012 diff hist +1,031 Category:616 Temporary Traffic Control Per Traffic, compliance letter added and Sign and Device Legend figure updated. Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.
5 March 2012
- 16:3516:35, 5 March 2012 diff hist −93,399 616.23 Traffic Control for Field Operations Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.
- 16:0916:09, 5 March 2012 diff hist −7 m 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation slight numbering revision
- 16:0916:09, 5 March 2012 diff hist +113 N 616.27 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation 616.27 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation moved to 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation: Per Traffic, revision to bring policy current
- 16:0916:09, 5 March 2012 diff hist 0 m 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation 616.27 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation moved to 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation: Per Traffic, revision to bring policy
- 16:0616:06, 5 March 2012 diff hist 0 m 616.11 Traffic Control for Waterways revized numbering system
- 16:0516:05, 5 March 2012 diff hist +50 N 616.28 Traffic Control for Waterways 616.28 Traffic Control for Waterways moved to 616.11 Traffic Control for Waterways: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD. current
- 16:0516:05, 5 March 2012 diff hist 0 m 616.11 Traffic Control for Waterways 616.28 Traffic Control for Waterways moved to 616.11 Traffic Control for Waterways: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.
- 15:4915:49, 5 March 2012 diff hist −1 m 616.12 Work Zone Speed Limits updated numbering system
- 15:4515:45, 5 March 2012 diff hist +43 N 616.29 Work Zone Speed Limits 616.29 Work Zone Speed Limits moved to 616.12 Work Zone Speed Limits: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD. current
- 15:4515:45, 5 March 2012 diff hist 0 m 616.12 Work Zone Speed Limits 616.29 Work Zone Speed Limits moved to 616.12 Work Zone Speed Limits: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.
- 15:4115:41, 5 March 2012 diff hist +14,169 N 616.9 Control of Traffic Through Traffic Incident Management Areas (MUTCD 6I) Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.
- 15:4015:40, 5 March 2012 diff hist 0 N File:616.8.44a.pdf No edit summary
- 15:4015:40, 5 March 2012 diff hist 0 N File:616.8.44.pdf No edit summary
- 15:3915:39, 5 March 2012 diff hist 0 N File:616.8.43.pdf No edit summary
- 15:3915:39, 5 March 2012 diff hist 0 N File:616.8.42.pdf No edit summary
- 15:3915:39, 5 March 2012 diff hist 0 N File:616.8.38c.pdf No edit summary
- 15:3915:39, 5 March 2012 diff hist 0 N File:616.8.38b.pdf No edit summary
- 15:3915:39, 5 March 2012 diff hist 0 N File:616.8.38a.pdf No edit summary
- 15:3815:38, 5 March 2012 diff hist 0 N File:616.8.38.pdf No edit summary
- 15:3815:38, 5 March 2012 diff hist 0 N File:616.8.37.pdf No edit summary
- 15:3815:38, 5 March 2012 diff hist 0 N File:616.8.35d.pdf No edit summary
- 15:3815:38, 5 March 2012 diff hist 0 N File:616.8.35c.pdf No edit summary
- 15:3815:38, 5 March 2012 diff hist 0 N File:616.8.35b.pdf No edit summary