User contributions for Smithk
Jump to navigation
Jump to search
8 February 2012
- 07:2107:21, 8 February 2012 diff hist −32 m 643.4 Railroads →643.4.4.2 Use of Standard Devices, Systems and Practices at Highway-Rail Grade Crossings (MUTCD Section 8A.02): new photo
7 February 2012
- 13:1213:12, 7 February 2012 diff hist +2 m Category:137 Construction Inspection Guidance for Records to be Maintained No edit summary
- 13:0613:06, 7 February 2012 diff hist −2 m Main Page No edit summary
- 13:0013:00, 7 February 2012 diff hist 0 m Main Page No edit summary
- 12:4212:42, 7 February 2012 diff hist 0 N File:Main Page 3 Feb 7, 2012.jpg No edit summary current
- 12:4212:42, 7 February 2012 diff hist 0 N File:Main Page Feb 7, 2012.jpg No edit summary current
- 12:4112:41, 7 February 2012 diff hist 0 N File:Main Page 2 Feb 7, 2012.jpg No edit summary current
- 12:4012:40, 7 February 2012 diff hist +54 m Main Page new photos
- 12:2412:24, 7 February 2012 diff hist +234 m Category:101 Standard Forms →Construction and Materials: Per CM, replaced two Erosion Control Inspection forms with three new Land Disturbance Inspection Record forms
- 10:2710:27, 7 February 2012 diff hist 0 N File:136.14.3.1 Obligation Request Form Feb 2012.docx No edit summary
- 10:1710:17, 7 February 2012 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.3.1 Commonly Used Forms: Per Design, updated Obligation Request Form
- 09:1809:18, 7 February 2012 diff hist −111 m Main Page EPG 233.2.19
- 09:0309:03, 7 February 2012 diff hist −1 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.19 Median Acceleration Lanes: Per Traffic, further clarification
- 09:0209:02, 7 February 2012 diff hist +19 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.19 Median Acceleration Lanes: PerTraffic, concurrence by Traffic Division is no longer necessary for median acceleration lanes.
6 February 2012
- 13:2913:29, 6 February 2012 diff hist −6 m Main Page No edit summary
3 February 2012
- 14:1714:17, 3 February 2012 diff hist 0 N File:616.2.4 POP Sign 36x48 Feb 2012.jpg No edit summary current
- 14:1614:16, 3 February 2012 diff hist 0 N File:616.2.4 POP Sign 96x48 Feb 2012.jpg No edit summary current
- 09:2009:20, 3 February 2012 diff hist +248 m 236.16 Outdoor Advertising Per Right of Way, general clarification of guidance
- 08:5508:55, 3 February 2012 diff hist −3 m Category:806 Pollution, Erosion and Sediment Control →806.7 Construction Inspection Guidance for Sec. 806: Per Design, updated links
2 February 2012
- 15:1115:11, 2 February 2012 diff hist −12 Main Page No edit summary
- 15:1015:10, 2 February 2012 diff hist +364 m Main Page EPG 751.50
- 14:4914:49, 2 February 2012 diff hist +3,052 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, complete replacement of the paint notes
- 14:3914:39, 2 February 2012 diff hist +4,430 m 751.50 Standard Detailing Notes →A4. Protective Coatings: Per Bridge, complete replacement of the paint notes
1 February 2012
- 15:3515:35, 1 February 2012 diff hist −21 m Main Page EPG 616.2.4
- 11:3611:36, 1 February 2012 diff hist −45 m Main Page EPG 233.2.19
- 11:0111:01, 1 February 2012 diff hist −110 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.19 Median Acceleration Lanes: Per Design, the process for obtaining concurrence for the use of a median acceleration lanes was clarified.
31 January 2012
- 13:3213:32, 31 January 2012 diff hist 0 N File:616.30 Work Zone Impact Spreadsheet Jan 2012.xls No edit summary current
- 13:3213:32, 31 January 2012 diff hist +27 m 616.13 Work Zone Capacity, Queue and Travel Delay Per Traffic, updated the Work Zone Impact Spreadsheet
- 12:1312:13, 31 January 2012 diff hist +2 Category:105 Control of Work No edit summary
- 11:1511:15, 31 January 2012 diff hist −71 m 750.7 Non-Hydraulic Considerations →750.7.6 Circular Reinforced Concrete Pipes: Per Bridge, minor corrections to most recent update.
- 10:2410:24, 31 January 2012 diff hist −41 m 643.4 Railroads updated link
- 09:5609:56, 31 January 2012 diff hist +57 m 643.4 Railroads →643.4.6 Flashing Light Signals, Gates and Traffic Control Signals (MUTCD Section 8C)
- 09:5009:50, 31 January 2012 diff hist −2 m Main Page No edit summary
- 09:4909:49, 31 January 2012 diff hist +118 m Main Page EPG 237.14
- 09:0509:05, 31 January 2012 diff hist +513 m Main Page EPG 237 and EPG 750
- 08:0608:06, 31 January 2012 diff hist +1,664 Category:1026 Reinforced Concrete Culvert Pipe →1026.3 Special or Modified Designs: Per Bridge, clarified the submittal process for special design pipe for MoDOT personnel, contractors and manufacturer.
- 08:0308:03, 31 January 2012 diff hist +703 750.7 Non-Hydraulic Considerations Per Bridge, clarified the submittal process for special design pipe for MoDOT personnel, contractors and manufacturer.
- 07:5907:59, 31 January 2012 diff hist +117 Category:726 Rigid Pipe Culverts →726.1.2 Bedding: Per Bridge, clarified the submittal process for special design pipe for MoDOT personnel, contractors and manufacturer.
- 07:5207:52, 31 January 2012 diff hist +12,635 237.14 Electronic Design Data Delivery (BIM Deliverables) Per Design, guidance provided to accommodate advanced technology such as automated machine guidance for earthwork & paving and for intelligent compaction.
- 07:4707:47, 31 January 2012 diff hist +2,392 237.13 Contract Plan File Name Convention Per Design, guidance provided to accommodate advanced technology such as automated machine guidance for earthwork & paving and for intelligent compaction.
- 07:4407:44, 31 January 2012 diff hist −11 237.9 Submission of Plans and Supporting Documents Per Design, guidance provided to accommodate advanced technology such as automated machine guidance for earthwork & paving and for intelligent compaction.
30 January 2012
- 15:0115:01, 30 January 2012 diff hist −5 m Main Page EPG 902.5.5.2.6
- 14:4614:46, 30 January 2012 diff hist +861 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.5.2.6 Adaptive Control: Per Traffic, added guidance for installation of adaptive traffic signal systems
- 10:3710:37, 30 January 2012 diff hist 0 N File:806.8 SWPPP Jan 30, 2012.docx No edit summary
- 10:3610:36, 30 January 2012 diff hist +4 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Environmental, updated Easily Printable Version of SWPPP
27 January 2012
- 15:1915:19, 27 January 2012 diff hist +290 m Main Page EPG 806.8
- 15:1615:16, 27 January 2012 diff hist 0 N File:Fig. 806.8.1.docx No edit summary
- 15:1115:11, 27 January 2012 diff hist 0 N File:806.8.jpg No edit summary current
- 15:1115:11, 27 January 2012 diff hist 0 N File:Fig. 806.8.15.docx No edit summary current
- 15:1115:11, 27 January 2012 diff hist 0 N File:Fig. 806.8.14.docx No edit summary