User contributions for Smithk
Jump to navigation
Jump to search
6 December 2011
- 14:5214:52, 6 December 2011 diff hist +18 m 133.4 Snow and Ice Control Operations NW district continuous operation routes updated, per Maintenance
5 December 2011
- 14:0014:00, 5 December 2011 diff hist −302 m Main Page EPG 236.5.21
- 13:5713:57, 5 December 2011 diff hist −1,355 m 236.5 Property Management E 236.5.21.1 Billboard Clause was removed and the remaining portion of the subarticle renumbered, per RW
- 13:5313:53, 5 December 2011 diff hist −200 m 236.7 Negotiation E 236.5.21.1 Billboard Clause was removed and the remaining portion of the subarticle renumbered, per RW
- 12:4712:47, 5 December 2011 diff hist +26 m Main Page EPG 751.50
- 12:3012:30, 5 December 2011 diff hist −162 m 751.50 Standard Detailing Notes →A5. Miscellaneous: Per Bridge, A5.5 removed. The A5.5 definition is included in the standard specifications and is therefore redundant on our plans.
- 12:2612:26, 5 December 2011 diff hist 0 N File:751.1 Prelim Design SI&A form (pg 2).jpg No edit summary current
- 12:2512:25, 5 December 2011 diff hist 0 N File:751.1 Prelim Design SI&A form (pg 1).jpg No edit summary current
- 12:2512:25, 5 December 2011 diff hist +12 m 751.1 Preliminary Design →751.1.2.12 Replacing an Existing Structure: Per Bridge, updated figure of SI&A form
2 December 2011
- 13:4413:44, 2 December 2011 diff hist −48 m Main Page No edit summary
- 13:3213:32, 2 December 2011 diff hist +114 m Main Page EPG 751.40.4.3
- 13:1313:13, 2 December 2011 diff hist −18 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Per Bridge, numerous minor revisions to bring the EPG guidance into compliance with the standard plans for thrie beam.
- 12:5912:59, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Details of Post.jpg No edit summary current
- 12:5712:57, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Details of Post.jpg No edit summary current
- 12:5512:55, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Detail B.jpg No edit summary current
- 12:5412:54, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Part Section.jpg No edit summary current
- 12:5212:52, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section CC.jpg No edit summary current
- 12:5112:51, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section DD.jpg No edit summary current
- 12:4912:49, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Details of Post.jpg No edit summary current
- 12:4712:47, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Detail B.jpg No edit summary current
- 12:4612:46, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Part Section.jpg No edit summary current
- 12:4212:42, 2 December 2011 diff hist −31 751.40 LFD Widening and Repair →751.40.2.5 Filled Joints: Replacement of diagrams
- 12:4012:40, 2 December 2011 diff hist −83 m 751.40 LFD Widening and Repair →751.40.2.4.1 Cast-in-Place Deck: Replacement of diagrams
- 12:3112:31, 2 December 2011 diff hist +979 m 751.40 LFD Widening and Repair Per Bridge, numerous minor revisions to bring the EPG guidance into compliance with the standard plans for thrie beam.
1 December 2011
- 11:2411:24, 1 December 2011 diff hist 0 N File:751.32.4.2 part plan Dec 2011.jpg No edit summary current
- 11:2411:24, 1 December 2011 diff hist +9 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.2 Encased Pile Cap Bent: Correction of Part Plan detail,per Bridge
- 08:3108:31, 1 December 2011 diff hist +1 m Main Page No edit summary
- 08:0808:08, 1 December 2011 diff hist +1 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per Bridge, clarified title for E 2.25
- 07:5507:55, 1 December 2011 diff hist +1 m 132.4 Highway Safety Plan and Performance Plan Updated link to highway safety plan
30 November 2011
- 09:3009:30, 30 November 2011 diff hist +22 m Category:144 Practical Operations →144.2 Signing Operations Changes: Added Sign Management System link
- 09:2809:28, 30 November 2011 diff hist +79 m Category:903 Highway Signing added Sign Management System link
- 08:4508:45, 30 November 2011 diff hist +322 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: Per LP Administrator, updated Fig. 136.6.2 Criteria for Evaluating Consultants and Fig. 136.6.7 Sample Solicitation.
- 08:4208:42, 30 November 2011 diff hist 0 N File:136.6.7 Sample Solicitation Nov 2011.docx No edit summary
- 08:4108:41, 30 November 2011 diff hist 0 N File:136.6.2 Consultant Selection Criteria (Fig. 6-2) Nov 2011.doc No edit summary current
- 08:3608:36, 30 November 2011 diff hist −2 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LP Administrator, updated Fig. 136.6.2 Criteria for Evaluating Consultants and Fig. 136.6.7 Sample Solicitation.
- 08:1608:16, 30 November 2011 diff hist 0 N File:136.14.3.1 Obligation Request Form Nov 2011.docx No edit summary
- 08:1508:15, 30 November 2011 diff hist −696 m LPA:136.12 Figures, Glossary and Other Useful Links Per LP Administrator, the Obligation Request Form was updated
28 November 2011
- 09:4409:44, 28 November 2011 diff hist +115 m Category:101 Standard Forms →Construction and Materials: Per CM, added new form, Prestress Deficiency Report
23 November 2011
- 13:2313:23, 23 November 2011 diff hist +111 m Main Page EPG 751.14.5
- 13:0313:03, 23 November 2011 diff hist +5 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Clarification, per Bridge
- 12:5512:55, 23 November 2011 diff hist 0 N File:751.14 lateral bracing detail a.jpg No edit summary current
- 12:5412:54, 23 November 2011 diff hist 0 N File:751.14 longitudinal web stiffener.jpg No edit summary current
- 12:5412:54, 23 November 2011 diff hist 0 N File:751.14 int web stiffener.jpg No edit summary current
- 12:5312:53, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 finger plate detail a.jpg No edit summary current
- 12:5312:53, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 finger plate detail d.jpg No edit summary current
- 12:5212:52, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 detail a.jpg No edit summary current
- 12:5212:52, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 detail c.jpg No edit summary current
- 12:5112:51, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - 42 thru 48.jpg No edit summary current
- 12:5012:50, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - 36 thru 40.jpg No edit summary current
- 12:5012:50, 23 November 2011 diff hist 0 N File:751.14 End Diaphragm Connections.jpg No edit summary current