User contributions for Smithk
Jump to navigation
Jump to search
27 October 2011
- 12:1912:19, 27 October 2011 diff hist +28 m Category:127 MoDOT and the Environment No edit summary
- 12:1612:16, 27 October 2011 diff hist 0 m 127.2 Historic Preservation and Cultural Resources No edit summary
26 October 2011
- 14:0114:01, 26 October 2011 diff hist +235 m Main Page EPG 751.1 and EPG 751.32
- 13:4113:41, 26 October 2011 diff hist 0 N File:751.32.4.2 part plan.jpg No edit summary current
- 13:4113:41, 26 October 2011 diff hist 0 N File:751.32.4.2 part section.jpg No edit summary current
- 13:4013:40, 26 October 2011 diff hist 0 N File:751.32.4.2 part elev.jpg No edit summary current
- 13:3113:31, 26 October 2011 diff hist 0 N File:751.32.3.3.2.jpg No edit summary current
- 13:3013:30, 26 October 2011 diff hist 0 N File:751.32.3.3.1.jpg No edit summary current
- 13:2913:29, 26 October 2011 diff hist +3,141 m 751.32 Concrete Pile Cap Intermediate Bents Per Bridge, expanded guidance for encased pile cap bent
- 12:2412:24, 26 October 2011 diff hist +2,347 m 751.1 Preliminary Design Per Bridge, expanded guidance about encased pile cap bents and corrosion
25 October 2011
- 15:0815:08, 25 October 2011 diff hist 0 N File:104.7 Engineering Factors Report 08 to 10.pdf No edit summary
- 15:0815:08, 25 October 2011 diff hist 0 N File:104.7 Engineering Factors Report 07 to 09.pdf No edit summary
- 15:0815:08, 25 October 2011 diff hist 0 N File:104.7 Engineering Factors Report 06 to 08.pdf No edit summary
- 15:0815:08, 25 October 2011 diff hist +427 m 104.7 Scoping Estimates Per Transportation Planning, historic Engineering Reports made available
- 08:2908:29, 25 October 2011 diff hist −11 m Main Page No edit summary
- 08:1508:15, 25 October 2011 diff hist −41 m Main Page EPG 104.7
- 07:5707:57, 25 October 2011 diff hist 0 N File:104.7 Engineering Factors Report.pdf No edit summary current
- 07:5707:57, 25 October 2011 diff hist +346 m 104.7 Scoping Estimates Per Transportation Planning, new figure (Engineering Factors) added to help estimate costs.
21 October 2011
- 14:3214:32, 21 October 2011 diff hist 0 N File:Main Page Oct 21, 2011.jpg No edit summary current
- 14:3214:32, 21 October 2011 diff hist −138 m Main Page new photo
- 13:1713:17, 21 October 2011 diff hist +201 m Main Page EPG 751.37.1.6
- 13:0713:07, 21 October 2011 diff hist +140 m 751.1 Preliminary Design →751.1.2.23 Drilled Shafts: Per Bridge, clarification of report and friction values.
- 13:0013:00, 21 October 2011 diff hist +521 m 751.37 Drilled Shafts Per Bridge, addition of general detail considerations (EPG 751.37.1.6) and partial resequencing of EPG 751.37.6.
- 12:3912:39, 21 October 2011 diff hist +21 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per Bridge, addition of LRFD reference
- 10:4510:45, 21 October 2011 diff hist +33 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: EPG 136.11.2
- 10:4210:42, 21 October 2011 diff hist +67 m LPA:136.11 Local Public Agency Construction →136.11.2 Consultant Construction Engineering Services: Per Local Public Administrator, clarification of work (surveying) performed by a consulting engineering firm.
- 08:5808:58, 21 October 2011 diff hist +1 m Main Page No edit summary
20 October 2011
- 09:4709:47, 20 October 2011 diff hist 0 N File:135.4 Jobsite bulletin board checklist July 2011.pdf No edit summary
- 09:4709:47, 20 October 2011 diff hist 0 m Category:101 Standard Forms →Posters, Federal Aid: Per ECR, Jobsite bulletin board checklist updated
- 08:4008:40, 20 October 2011 diff hist 0 N File:409 Contract Seal Coat Guidelines Oct 19, 2011.doc No edit summary current
19 October 2011
- 15:1215:12, 19 October 2011 diff hist −323 m Main Page EPG 409
- 15:1115:11, 19 October 2011 diff hist +1 m Category:409 Seal Coat Per Design/Bidding and Contract Services, Seal Coat Guidelines were updated.
- 08:2708:27, 19 October 2011 diff hist −113 Main Page No edit summary
- 08:1008:10, 19 October 2011 diff hist 0 N File:754 BEAP Consultant Listing Oct 2011.pdf No edit summary
- 08:1008:10, 19 October 2011 diff hist +18 m Category:754 Bridge Engineering Assistance Program (BEAP) Per Bridge, the BEAP Consultant List was updated
18 October 2011
- 11:2111:21, 18 October 2011 diff hist +22 m LPA:136.4 Consultant Selection and Consultant Contract Management clarification
- 11:1611:16, 18 October 2011 diff hist −13 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: EPG 136.6, DBE info in contracts
- 11:1411:14, 18 October 2011 diff hist −31 m Main Page EPG 136.6
- 10:5910:59, 18 October 2011 diff hist +58 m LPA:136.4 Consultant Selection and Consultant Contract Management added link
- 10:5610:56, 18 October 2011 diff hist −109 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LP Administrator, federal regulations now require DBE goals (regardless of contract amount).
17 October 2011
- 12:2412:24, 17 October 2011 diff hist +182 m Main Page QRG update
- 12:0812:08, 17 October 2011 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated Change Orders QRG
- 12:0712:07, 17 October 2011 diff hist 0 N File:Change Orders Oct 2011.docx No edit summary
- 12:0612:06, 17 October 2011 diff hist +2 m Category:109 Measurement and Payment Per CM, updated Change Orders QRG
13 October 2011
- 10:3010:30, 13 October 2011 diff hist 0 m Main Page No edit summary
- 07:5907:59, 13 October 2011 diff hist −1 Main Page No edit summary
- 07:5807:58, 13 October 2011 diff hist 0 N File:Main Page 4 OCt 2011.jpg No edit summary current
- 07:5807:58, 13 October 2011 diff hist +141 Main Page photo
12 October 2011
- 08:2708:27, 12 October 2011 diff hist −2 m Main Page No edit summary
7 October 2011
- 15:3815:38, 7 October 2011 diff hist +12 m Main Page No edit summary