User contributions for Smithk
Jump to navigation
Jump to search
14 September 2011
- 12:1412:14, 14 September 2011 diff hist +1 m Category:105 Control of Work →105.9.3 Daily Work Reports: Updated the type of QRG form, not the content
- 12:1212:12, 14 September 2011 diff hist 0 N File:Daily Work Reports June 2011.docx No edit summary
- 12:1112:11, 14 September 2011 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
13 September 2011
- 15:3115:31, 13 September 2011 diff hist 0 N File:751.24 LFD Retaining Walls Sept 2011.pdf No edit summary current
- 15:3115:31, 13 September 2011 diff hist +1 m 751.24 Retaining Walls Per Bridge, the correct design practice of showing sloped elevation lines for bottom of wall elevations has been added. Other revisions to the guidance are clarifications.
- 09:1909:19, 13 September 2011 diff hist 0 N File:236.11 Roster of Approved Contract Mediators (Form 11.2.3) Sept 13 2011.pdf No edit summary
- 09:1809:18, 13 September 2011 diff hist +8 m 236.11 Mediation Per RW, updated Roster of Approved Contract Mediators
12 September 2011
- 12:2412:24, 12 September 2011 diff hist 0 N File:236.7 Administrative Settlement Justification Letter.pdf No edit summary
- 12:2412:24, 12 September 2011 diff hist 0 m 236.7 Negotiation Per RW, Admin. Settlement Justification Letter form updated.
- 09:0209:02, 12 September 2011 diff hist +32 m Main Page EPG 754
- 08:5408:54, 12 September 2011 diff hist 0 N File:754 Exhibit 2 General Scope of Services.pdf No edit summary
- 08:5308:53, 12 September 2011 diff hist 0 N File:754 Exhibit 1 Estimate of Cost.pdf No edit summary
- 08:5308:53, 12 September 2011 diff hist 0 N File:754 BEAP Hourly Rate Fee.pdf No edit summary
- 08:5208:52, 12 September 2011 diff hist 0 N File:754 BEAP Project Tracking Form.docx No edit summary
- 08:5208:52, 12 September 2011 diff hist 0 N File:754 BEAP Consultant Listing.pdf No edit summary
- 08:5108:51, 12 September 2011 diff hist −637 m Category:754 Bridge Engineering Assistance Program (BEAP) Per Bridge, a different group of BEAP consultants for the next three years has been selected. EPG 754 has also been generally updated and clarified (with no major policy changes).
9 September 2011
- 14:4714:47, 9 September 2011 diff hist +21 m 751.5 Structural Detailing Guidelines →751.5.10 Reinforcing Steel Detailing: Minor cosmetic adjustment, per BR
- 14:3814:38, 9 September 2011 diff hist +338 m Main Page EPG 751.13
- 14:0214:02, 9 September 2011 diff hist 0 N File:751.13.4.6 Part Elevation of Barrier Curb.jpg No edit summary current
- 14:0114:01, 9 September 2011 diff hist 0 N File:751.13.4.6 Part Section AA.jpg No edit summary current
- 14:0114:01, 9 September 2011 diff hist 0 N File:751.13.4.5 Part Section AA.jpg No edit summary current
- 14:0014:00, 9 September 2011 diff hist 0 N File:751.13.4.5 Part Plan Square.jpg No edit summary current
- 14:0014:00, 9 September 2011 diff hist 0 N File:751.13.4.5 Section thru joint.jpg No edit summary current
- 14:0014:00, 9 September 2011 diff hist 0 N File:751.13.4.5 Part Elevation of Barrier Curb.jpg No edit summary current
- 13:5913:59, 9 September 2011 diff hist 0 N File:751.13.3.6 Part Elevation of Barrier Curb.jpg No edit summary current
- 13:5913:59, 9 September 2011 diff hist 0 N File:751.13.3.6 Part Section AA.jpg No edit summary current
- 13:5813:58, 9 September 2011 diff hist 0 N File:751.13.3.4 Skewed Structure.jpg No edit summary current
- 13:5813:58, 9 September 2011 diff hist 0 N File:751.13.3.4 Square Structure.jpg No edit summary current
- 13:5813:58, 9 September 2011 diff hist 0 N File:751.13.3.4 Part Elevation of Barrier Curb.jpg No edit summary current
- 13:5713:57, 9 September 2011 diff hist 0 N File:751.13.3.4 Part Section AA.jpg No edit summary current
- 13:5713:57, 9 September 2011 diff hist 0 N File:751.13.2.7 Typical part section AA.jpg No edit summary current
- 13:5713:57, 9 September 2011 diff hist 0 N File:751.13.2.6 Part Plan BB Skewed.jpg No edit summary current
- 13:5613:56, 9 September 2011 diff hist 0 N File:751.13.2.6 Part Plan BB Square.jpg No edit summary current
- 13:5613:56, 9 September 2011 diff hist 0 N File:751.13.2.6 Part Section AA.jpg No edit summary current
- 13:5513:55, 9 September 2011 diff hist 0 N File:751.13.2.6 Elevation.jpg No edit summary current
- 13:5513:55, 9 September 2011 diff hist 0 N File:751.13.2 Skewed Structure.jpg No edit summary current
- 13:5513:55, 9 September 2011 diff hist 0 N File:751.13.2 Square Structure.jpg No edit summary current
- 13:5413:54, 9 September 2011 diff hist 0 N File:751.13.2 Part Elevation of Barrier Curb.jpg No edit summary current
- 13:5413:54, 9 September 2011 diff hist 0 N File:751.13.2 Barrier Curb Details Part Section AA.jpg No edit summary current
- 13:5313:53, 9 September 2011 diff hist −2,108 751.13 Expansion Joint Systems Per Bridge (with approval from , Curb plate will no longer be required for silicone expansion, strip seal and preformed compression joint seal expansion systems.
- 09:5109:51, 9 September 2011 diff hist 0 N File:Main Page 4a June 2011.jpg No edit summary current
- 09:5109:51, 9 September 2011 diff hist +77 m Main Page new photo
- 07:5607:56, 9 September 2011 diff hist 0 m Main Page No edit summary
8 September 2011
- 15:1215:12, 8 September 2011 diff hist 0 m Main Page No edit summary
- 15:1115:11, 8 September 2011 diff hist −8 m Main Page No edit summary
- 15:0815:08, 8 September 2011 diff hist 0 N File:Main Page 2 Sept 8, 2011.jpg No edit summary current
- 15:0815:08, 8 September 2011 diff hist −39 m Main Page new photo
- 13:5613:56, 8 September 2011 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators (Form 7-8.2) Sept 2011.pdf No edit summary
- 13:5513:55, 8 September 2011 diff hist −3 m 236.7 Negotiation Per RW, updated Roster of Approved Contract Negotiators
- 13:3413:34, 8 September 2011 diff hist 0 m Main Page No edit summary