User contributions for Smithk
Jump to navigation
Jump to search
21 July 2011
- 07:2407:24, 21 July 2011 diff hist 0 N File:1045.2.5.jpg No edit summary current
- 07:2407:24, 21 July 2011 diff hist +109 m Category:1045 Paint for Structural Steel →1045.2.5 High Solids Inorganic Zinc Silicate Coating: new photo
20 July 2011
- 15:4515:45, 20 July 2011 diff hist −50 m Help Article →Division Contacts: updated divisional contacts
- 08:3708:37, 20 July 2011 diff hist +6 m 751.40 LFD Widening and Repair →751.40.2.6 Temporary Traffic Control Device: cosmetic adjustment
- 08:3408:34, 20 July 2011 diff hist 0 N File:751.40 Temporary Traffic Control Device Section Thru Roadway July 20, 2011.jpg No edit summary current
- 08:3408:34, 20 July 2011 diff hist +4 m 751.40 LFD Widening and Repair →751.40.2.6 Temporary Traffic Control Device: Corrected figure, per Bridge
19 July 2011
- 15:4515:45, 19 July 2011 diff hist 0 N File:104.13 new.jpg No edit summary current
- 15:4515:45, 19 July 2011 diff hist +4 104.13 Construction Inspection Guidance for Sec 104 →Final Proposal
- 09:1309:13, 19 July 2011 diff hist −60 m 236.6 Appraisal and Appraisal Review →236.6.5.10 Contracting Specialty Appraisals: removal of archaic link
18 July 2011
- 15:4315:43, 18 July 2011 diff hist −2 m 616.14 Work Zone Safety and Mobility Policy updated link to MUTCD
- 15:4115:41, 18 July 2011 diff hist −3 m 616.18 Construction Inspection Guidelines for Sec 616 →Material (for Sec 616.2): Updated MUTCD link
- 15:4015:40, 18 July 2011 diff hist −2 m 616.23 Traffic Control for Field Operations Updated MUTCD link
- 15:3715:37, 18 July 2011 diff hist −4 m 616.19 Quality Standards for Temporary Traffic Control Devices updated links to MUTCD
- 14:5014:50, 18 July 2011 diff hist +48 m 620.1 General (MUTCD Chapter 3A) →620.1.3 Materials (MUTCD Section 3A.03): Per Traffic, update of two JSPs (epoxy and high build)
- 14:4814:48, 18 July 2011 diff hist 0 N File:620 High Build Wet Reflective Pavement Markings for Grooves.doc No edit summary current
- 14:4814:48, 18 July 2011 diff hist 0 N File:620 Epoxy Wet Reflective Pavement Markings for Grooves.doc No edit summary current
- 14:4714:47, 18 July 2011 diff hist +48 m Category:620 Pavement Marking Per Traffic, update of two JSPs (epoxy and high build)
- 07:4407:44, 18 July 2011 diff hist 0 N File:Main Page July 18, 2011.jpg No edit summary current
- 07:4407:44, 18 July 2011 diff hist +136 m Main Page new photo
15 July 2011
- 13:3813:38, 15 July 2011 diff hist +44 m Category:109 Measurement and Payment Per CM, updated four more QRGs
- 13:3413:34, 15 July 2011 diff hist 0 N File:Change Orders – Value Engineering July 2011.doc No edit summary current
- 13:3413:34, 15 July 2011 diff hist 0 N File:Change Orders – Time Adjustment July 2011.doc No edit summary current
- 13:3413:34, 15 July 2011 diff hist 0 N File:Change Orders – Mobilization and Contract Bond July 2011.doc No edit summary current
- 13:3313:33, 15 July 2011 diff hist 0 N File:Change Orders July 2011.doc No edit summary current
- 13:3313:33, 15 July 2011 diff hist +22 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated four more QRGs
- 12:0912:09, 15 July 2011 diff hist −121 m Category:109 Measurement and Payment Per CM, updated two QRGs; removed archaic "Change Order - Forwarding for Review" QRG
- 11:2811:28, 15 July 2011 diff hist 0 N File:Change order zero dollar July 2011.doc No edit summary current
- 11:2811:28, 15 July 2011 diff hist 0 N File:Change order reports July 2011.doc No edit summary current
- 11:2711:27, 15 July 2011 diff hist +20 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated two QRGs
14 July 2011
- 15:0815:08, 14 July 2011 diff hist +29 Category:101 Standard Forms →Quick Reference Guides (QRGs)
- 13:5213:52, 14 July 2011 diff hist 0 m Category:1080 Structural Steel Fabrication No edit summary
- 13:4313:43, 14 July 2011 diff hist +43 Category:1080 Structural Steel Fabrication No edit summary
- 09:4709:47, 14 July 2011 diff hist +437 m Category:1080 Structural Steel Fabrication Added videos
- 09:0509:05, 14 July 2011 diff hist +168 m 751.37 Drilled Shafts →751.37.6.1 Reinforcement Design: Repacement, per Bridge, of verbiage inadvertently removed
13 July 2011
- 13:0513:05, 13 July 2011 diff hist −6 m Category:104 Scope Updated STIP link
- 13:0313:03, 13 July 2011 diff hist −6 m 104.7 Scoping Estimates Updated STIP link
- 13:0313:03, 13 July 2011 diff hist +35 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) →104.12.2 Significant Scope Changes: Updated STIP link
- 13:0013:00, 13 July 2011 diff hist −12 m 121.3 The Statewide Transportation Improvement Program (STIP) updated STIP link
- 07:2807:28, 13 July 2011 diff hist −1 m 236.3 Administration Link update of Form A-419
- 07:2307:23, 13 July 2011 diff hist +8 m 236.3 Administration Updated link to Form A-419
12 July 2011
- 15:1615:16, 12 July 2011 diff hist −129 m 236.3 Administration Per RW Section, updated Form A 419
- 14:0314:03, 12 July 2011 diff hist +88 m Category:501 Concrete →501.1.3 Sampling (Sec 501.4): Per CM, new QRG
- 13:5913:59, 12 July 2011 diff hist 0 N File:Terminal Services-Remote Desktop Connection.doc No edit summary current
- 13:5913:59, 12 July 2011 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs)
- 13:5713:57, 12 July 2011 diff hist 0 N File:Concrete Cylinder Sample Sent to Central Lab.doc No edit summary current
- 13:5713:57, 12 July 2011 diff hist +214 m Category:101 Standard Forms →Quick Reference Guides (QRGs): Per CM, new QRGs
- 13:5213:52, 12 July 2011 diff hist +136 m Category:109 Measurement and Payment Per CM, new QRG (Contractor Pay Estimates)
- 13:4613:46, 12 July 2011 diff hist 0 N File:Contractor Pay Estimates.doc No edit summary current
- 13:4613:46, 12 July 2011 diff hist +68 m Category:101 Standard Forms →Quick Reference Guides (QRGs): Per CM, new QRG
- 10:2710:27, 12 July 2011 diff hist +198 616.14 Work Zone Safety and Mobility Policy →616.14.10 Transportation Management Plan