- 09:2109:21, 23 May 2011 diff hist +35 903.14 Emergency Management Signing added photo
20 May 2011
- 08:4408:44, 20 May 2011 diff hist +1 m Category:105 Control of Work →105.9.17 Subcontract Approval Request: minor correction
18 May 2011
- 13:5513:55, 18 May 2011 diff hist +9 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.3.1 Commonly Used Forms: Updated Fig. 136.6.1 Engineering Service Contract (overlooked the update in this box in Feb 2011)
- 13:3013:30, 18 May 2011 diff hist +54 m Category:239 Construction Inspection Guidelines for Final Plans →239.10.1 Pay Quantity (DWR) Entries: new QRG, per CM
- 13:2913:29, 18 May 2011 diff hist −53 m Category:105 Control of Work →105.9.3 Daily Work Reports: new QRG, per CM
- 13:2613:26, 18 May 2011 diff hist 0 N File:Daily Work Reports.doc No edit summary current
- 13:2613:26, 18 May 2011 diff hist +56 m Category:101 Standard Forms →Quick Reference Guides (QRGs): new QRG, per CM
16 May 2011
- 15:4015:40, 16 May 2011 diff hist −15 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Updated link to Form C-220, per CM
- 15:3715:37, 16 May 2011 diff hist −3 m Category:105 Control of Work →105.9.17 Subcontract Approval Request: Updated C-220 link, per CM
- 15:3615:36, 16 May 2011 diff hist −618 m Category:105 Control of Work Preconstruction letter links and Erosion Control Inspection Record updated, per CM.
- 15:2515:25, 16 May 2011 diff hist −3 m Category:105 Control of Work CM updated link to Request to Subcontract Work
- 15:2415:24, 16 May 2011 diff hist −3 m Category:101 Standard Forms →Construction and Contractor Related: CM updated link to Request to Subcontract Work
- 15:1915:19, 16 May 2011 diff hist 0 N File:Subcontracts May 2011.doc No edit summary current
- 15:1915:19, 16 May 2011 diff hist +9 m Category:101 Standard Forms →Quick Reference Guides (QRGs): CM updated "Subcontracts"
12 May 2011
- 15:4515:45, 12 May 2011 diff hist −42 m 141.4 Partnership Development Process this article disconnected from the rest of the EPG 141 articles. current
- 15:4415:44, 12 May 2011 diff hist −97 m Main Page EPG 141.4
- 15:4215:42, 12 May 2011 diff hist +304 m 141.7 Transportation Improvement Program Approval Link to new EPG 141.4, per Transportation Planning
- 15:4115:41, 12 May 2011 diff hist 0 N File:141.4.4.jpg No edit summary current
- 15:4015:40, 12 May 2011 diff hist +9,969 N 141.4 Transportation Improvement Program Amendments New article providing guidance to conform with how we have already been doing business. Per Transportation Planning. Old EPG 141.4 presented unrelated archaic info that was removed by RM in 2010. current
- 13:5913:59, 12 May 2011 diff hist −6,291 m 903.5 Regulatory Signs →903.5.3 Dimensions (MUTCD Section 2B.03): deleted table that was inadvertently added
- 13:5413:54, 12 May 2011 diff hist +6,291 903.5 Regulatory Signs →903.5.3 Dimensions (MUTCD Section 2B.03)
- 08:1508:15, 12 May 2011 diff hist +152 m Category:733 Precast Concrete Box Culverts Form C-258 (which is no longer routinely used) replaced with new QRG, Estimate Based Documentation Records, per CM
- 08:0808:08, 12 May 2011 diff hist −401 m Category:703 Concrete Masonry Construction E 703.1.6 Documetation Record removed, per CM, since specs no longer reference documenting this.
- 07:5807:58, 12 May 2011 diff hist +125 m 616.18 Construction Inspection Guidelines for Sec 616 Form C-258 (which is no longer routinely used) replaced with new QRG, Estimate Based Documentation Records, per CM
- 07:5207:52, 12 May 2011 diff hist +2 m Category:616 Temporary Traffic Control Per Construction and Materials, Form C-258 (which is no longer routinely used) updated to new "Estimate Based Documentation Records"
- 07:4607:46, 12 May 2011 diff hist +171 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →203.1 Construction Inspection Guidance for Sec 203: CM added link to new QRG
- 07:4407:44, 12 May 2011 diff hist +79 m 132.2 Construction Inspection Guidelines for Safety Precautions →132.3.2 Traffic Control: CM updated link to new QRG
- 07:4207:42, 12 May 2011 diff hist −41 m Category:105 Control of Work →105.9.4 Documentation Record: CM updated link to a new QRG
- 07:4007:40, 12 May 2011 diff hist 0 N File:Estimate Based Documentation Records.doc No edit summary current
- 07:3907:39, 12 May 2011 diff hist +92 m Category:101 Standard Forms →Quick Reference Guides (QRGs): CM added new QRG
11 May 2011
- 15:2515:25, 11 May 2011 diff hist 0 N File:235 Agreements Checklist May 2011.doc No edit summary current
- 15:2415:24, 11 May 2011 diff hist +18 m Category:235 Preliminary Plans Per Design, updated Agreements Checklist to require only 4 copies
10 May 2011
- 15:0215:02, 10 May 2011 diff hist +9 m Category:101 Standard Forms →Quick Reference Guides (QRGs): Per CM, updated QRG Change Orders - Mobilization and Contract Bond
- 15:0115:01, 10 May 2011 diff hist 0 N File:Change Orders – Mobilization and Contract Bond May 2011.doc No edit summary current
- 15:0015:00, 10 May 2011 diff hist +18 m Category:109 Measurement and Payment Per CM, updated QRG Change Orders - Mobilization and Contract Bond
- 14:5014:50, 10 May 2011 diff hist 0 N File:Main Page 3 May 11, 2011.jpg No edit summary current
- 14:4914:49, 10 May 2011 diff hist 0 N File:Main Page 2 May 10, 2011.jpg No edit summary current
- 14:4914:49, 10 May 2011 diff hist 0 N File:Main Page May 11, 2011.jpg No edit summary current
- 14:4914:49, 10 May 2011 diff hist +108 m Main Page new photos
- 08:3308:33, 10 May 2011 diff hist +28 m Category:101 Standard Forms →Design: added D-28
6 May 2011
- 10:3910:39, 6 May 2011 diff hist +159 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy
- 10:3710:37, 6 May 2011 diff hist +39 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.6.5 Evaluations: Additional guidance regarding contracts exceeding $100,000, per LPA Coordinator
- 07:3807:38, 6 May 2011 diff hist −13 m Category:134 Engineering Professional Services →134.3 Engineering Professional Services Guidelines: Updated PSC form, per Design
5 May 2011
- 09:2109:21, 5 May 2011 diff hist +106 m Main Page EPG 235.2.3
- 09:1809:18, 5 May 2011 diff hist +378 m Category:235 Preliminary Plans →235.2.3 Project Agreements: Per CCO and Design, the number of copies of the agreement is reduced to 4. Additional guidance provided about the agreement's distribution.
- 07:5907:59, 5 May 2011 diff hist +2 m 751.10 General Superstructure →751.10.15 Deck Concrete Finishing: correction
4 May 2011
- 08:5508:55, 4 May 2011 diff hist +132 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: EPG 136.11.9 revision
- 08:5308:53, 4 May 2011 diff hist −148 m LPA:136.11 Local Public Agency Construction →136.11.9 Materials Testing: Per LPA Coordinator, #1 was clarified and #2 updated
- 08:3908:39, 4 May 2011 diff hist +18 m Main Page EPG 134.3
- 08:3308:33, 4 May 2011 diff hist +505 m Category:134 Engineering Professional Services →134.3 Engineering Professional Services Guidelines: Several updated PSC forms, per Design