User contributions for Smithk
Jump to navigation
Jump to search
31 March 2011
- 13:4713:47, 31 March 2011 diff hist 0 N File:751.37.3.5.1.jpg No edit summary current
- 13:4713:47, 31 March 2011 diff hist 0 N File:751.37.3.4.2.jpg No edit summary current
- 13:4613:46, 31 March 2011 diff hist 0 N File:751.37.3.4.1.jpg No edit summary current
- 13:4613:46, 31 March 2011 diff hist 0 N File:751.37.3.3.2.jpg No edit summary current
- 13:4513:45, 31 March 2011 diff hist 0 N File:751.37.3.3.1.jpg No edit summary current
- 13:4413:44, 31 March 2011 diff hist 0 N File:751.37.3.2.2.jpg No edit summary current
- 13:4413:44, 31 March 2011 diff hist 0 N File:751.37.3.2.1.jpg No edit summary current
- 13:4313:43, 31 March 2011 diff hist 0 N File:751.37.3.1.2.jpg No edit summary current
- 13:4313:43, 31 March 2011 diff hist 0 m 751.37 Drilled Shafts →751.37.3.1 Axial Resistance for Individual Drilled Shafts in Rock (qu ≥ 100 ksf)
- 13:4013:40, 31 March 2011 diff hist 0 N File:Table 751.37.3.1.jpg No edit summary current
- 13:3813:38, 31 March 2011 diff hist 0 N File:751.37.3.1.1.jpg No edit summary current
- 13:3713:37, 31 March 2011 diff hist +174,142 751.37 Drilled Shafts General re-write. FHWA mandates that all bridges and foundations be designed in accordance with LRFD Bridge Design specs.
- 13:2913:29, 31 March 2011 diff hist 0 N File:Commentary 751.38.4.3.jpg No edit summary current
- 13:2913:29, 31 March 2011 diff hist 0 N File:Commentary 751.38.4.2.jpg No edit summary current
- 13:2813:28, 31 March 2011 diff hist 0 N File:Commentary 751.38.4.1.jpg No edit summary current
- 13:2713:27, 31 March 2011 diff hist 0 N File:Commentary 751.38.3.1.jpg No edit summary current
- 13:2713:27, 31 March 2011 diff hist 0 N File:751.38.5.1.jpg No edit summary current
- 13:2613:26, 31 March 2011 diff hist 0 N File:751.38.4.5.jpg No edit summary current
- 13:2613:26, 31 March 2011 diff hist 0 N File:751.38.4.4.jpg No edit summary current
- 13:2513:25, 31 March 2011 diff hist 0 N File:751.38.4.3.jpg No edit summary current
- 13:2513:25, 31 March 2011 diff hist 0 N File:751.38.4.2.jpg No edit summary current
- 13:2413:24, 31 March 2011 diff hist 0 N File:751.38.4.1.jpg No edit summary current
- 13:2313:23, 31 March 2011 diff hist 0 N File:Table 751.38.3.3.jpg No edit summary current
- 13:2313:23, 31 March 2011 diff hist 0 File:Table 751.38.3.1.2.jpg uploaded a new version of "Image:Table 751.38.3.1.2.jpg" current
- 13:2113:21, 31 March 2011 diff hist 0 N File:751.38.3.2.jpg No edit summary current
- 13:2013:20, 31 March 2011 diff hist 0 N File:Table 751.38.3.1.2.jpg No edit summary
- 13:1913:19, 31 March 2011 diff hist 0 N File:751.38.3.1.jpg No edit summary current
- 13:1913:19, 31 March 2011 diff hist 0 N File:751.38.1.2.jpg No edit summary current
- 13:1813:18, 31 March 2011 diff hist 0 N File:751.38.1.1.jpg No edit summary current
- 13:1813:18, 31 March 2011 diff hist +81,612 751.38 Spread Footings General re-write. FHWA mandates that all bridges and foundations be designed in accordance with LRFD Bridge Design specs.
- 13:0513:05, 31 March 2011 diff hist 0 N File:I-5aR.gif No edit summary current
- 13:0513:05, 31 March 2011 diff hist 0 N File:I-5a.gif No edit summary current
- 13:0413:04, 31 March 2011 diff hist 0 N File:D5-5j.jpg No edit summary current
- 12:5912:59, 31 March 2011 diff hist +383 Main Page EPG 128
- 12:5712:57, 31 March 2011 diff hist +410 Category:413 Surface Treatments and Preventive Maintenance Per Design; Core teams cautioned to investigate the project's corridor for safety & operational concerns & document concerns. 1R and 2R are still not required for conceptual study reports.
- 12:5312:53, 31 March 2011 diff hist +411 Category:402 Bituminous Surface Leveling →402.1.1 Plan Preparation: Per Design; Core teams cautioned to investigate the project's corridor for safety & operational concerns & document concerns.
- 12:4712:47, 31 March 2011 diff hist +3,274 Category:128 Conceptual Studies Per Design; Core teams cautioned to investigate the project's corridor for safety & operational concerns & document concerns. 1R and 2R are still not required for conceptual study reports.
- 08:4808:48, 31 March 2011 diff hist −147 Main Page EPG 237.5.3
- 08:4708:47, 31 March 2011 diff hist +61 237.5 Special Provisions →237.5.3 Required Job Special Provisions: Per Design, this revision urges contractor surveying and staking to be used in projects w/ earthwork exceeding 50000 cy.
- 08:3608:36, 31 March 2011 diff hist −212 m Main Page EPG 626
- 08:3308:33, 31 March 2011 diff hist +385 Category:626 Rumble Strips The rumble strip directive was clarified and emphasis was added that any variance from this guidance needs authorization from Central Office. Also, new Modified Rumble Strip guidance.
- 08:3008:30, 31 March 2011 diff hist 0 N File:626.5.jpg No edit summary current
- 08:2908:29, 31 March 2011 diff hist +885 N 626.5 Modified Rumble Strips new from Traffic
- 08:2608:26, 31 March 2011 diff hist +299 Main Page EPG 1006.2
- 08:2308:23, 31 March 2011 diff hist +39 Category:1006 Aggregate for Surfacing →1006.2 Acceptance: Lower types of aggregate for surfacing by certification or visual inspection for small quantitites are now allowed since sampling may not be practical.
- 08:2008:20, 31 March 2011 diff hist −73 m Main Page EPG 127.13
- 08:1708:17, 31 March 2011 diff hist 0 N File:127.13.jpg No edit summary current
- 08:1608:16, 31 March 2011 diff hist +1,362 127.13 Noise MoDOT's entire noise abatement policy has ben restructured to comply with new federal requirements
30 March 2011
- 11:2711:27, 30 March 2011 diff hist +2 m Main Page No edit summary
- 10:3310:33, 30 March 2011 diff hist +15 m Main Page EPG 751.22.1.4