User contributions for Smithk
Jump to navigation
Jump to search
15 March 2011
- 10:3410:34, 15 March 2011 diff hist 0 N File:751.14 end diaphragm - webs over 48in structure with finger plate expansion device detail a Mar 2011.gif No edit summary
- 10:3010:30, 15 March 2011 diff hist 0 N File:751.14 end diaphragm - webs over 48in detail a Mar 2011.gif No edit summary
- 10:2910:29, 15 March 2011 diff hist 0 N File:751.14 end diaphragm - webs over 48in detail c Mar 2011.gif No edit summary
- 10:2810:28, 15 March 2011 diff hist +4 m 751.14 Steel Superstructure →751.14.5.4 End Diaphragms for Plate Girders: minor correction
- 10:2610:26, 15 March 2011 diff hist 0 N File:751.14 end diaphragm - 42in thru 48in webs detail e Mar 2011.gif No edit summary
- 10:2510:25, 15 March 2011 diff hist 0 N File:751.14 diaphragm fill plate detail - optional Mar 2011.gif No edit summary
- 10:2410:24, 15 March 2011 diff hist 0 N File:751.14 diaphragm fill plate detail - preferred Mar 2011.gif No edit summary
- 10:2310:23, 15 March 2011 diff hist +54 m 751.14 Steel Superstructure →751.14.5 Details: re-sized figures
- 10:1610:16, 15 March 2011 diff hist 0 N File:751.14 diaphragm connection at stiffener detail Mar 2011.gif No edit summary
- 10:1510:15, 15 March 2011 diff hist +80 m 751.14 Steel Superstructure →751.14.5 Details: Per Bridge, update of several welding details
14 March 2011
- 15:2615:26, 14 March 2011 diff hist −58 m Category:101 Standard Forms →Bridge: Updated two bridge forms, per Bridge
- 12:2112:21, 14 March 2011 diff hist 0 N File:751.24 LFD Retaining Walls Mar 2011.pdf No edit summary
- 12:2112:21, 14 March 2011 diff hist −48 m 751.24 Retaining Walls Per Bridge, update of LFD document
- 11:2011:20, 14 March 2011 diff hist +986 m 751.50 Standard Detailing Notes →J. MSE Wall Notes: Per Bridge, new notes J1.23 and J1.24 and minor modification of J1.9 to clarify guidance for the construction of MSE walls
- 10:5910:59, 14 March 2011 diff hist −14 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details: Per Bridge, revised shear stud tables in EPG 751.6.2 & 751.14.4.5 for consistency
- 10:5610:56, 14 March 2011 diff hist −16 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, revised shear stud tables in EPG 751.6.2 & 751.14.4.5 for consistency
11 March 2011
- 08:5708:57, 11 March 2011 diff hist −85 m 236.3 Administration Per RW, updated Form 3-3.3C
- 08:5208:52, 11 March 2011 diff hist −8 m Category:101 Standard Forms →Administration: Per RW, updated Form 3-3.3C
10 March 2011
- 13:1813:18, 10 March 2011 diff hist 0 N File:616.0.10 Moving Operations on Highway Open to Traffic Feb 2011.pdf No edit summary
- 13:1813:18, 10 March 2011 diff hist +1 m Category:616 Temporary Traffic Control corrected a link
- 08:5508:55, 10 March 2011 diff hist 0 N File:Main Page 2 Mar 10, 2011.jpg No edit summary current
- 08:5508:55, 10 March 2011 diff hist 0 N File:Main Page Mar 10, 2011.jpg No edit summary current
- 08:5408:54, 10 March 2011 diff hist +124 m Main Page new photos
9 March 2011
- 12:2112:21, 9 March 2011 diff hist +414 m 236.3 Administration →236.3.5.2 Expenditure Accounting: Per RW, additional guidance for vendor numbers
- 11:1811:18, 9 March 2011 diff hist 0 N File:Digital Signature QRG3 to Submit Certificate and List of Signers Feb 2011.doc No edit summary current
- 11:1711:17, 9 March 2011 diff hist +9 m Category:101 Standard Forms →Quick Reference Guides (QRGs)
- 10:4310:43, 9 March 2011 diff hist +239 m 750.3 Bridges Per Bridge, clarification of overtopping flood
- 10:3810:38, 9 March 2011 diff hist +56 m 750.2 Culverts →750.2.11 Data Required on Plans: Per Bridge, clarification of overtopping flood
- 10:2410:24, 9 March 2011 diff hist −67 m Category:749 Hydrologic Analysis →749.2 Design Frequency and Return Period: Per Bridge, clarification of overtopping flood
- 10:1310:13, 9 March 2011 diff hist +22 m 748.2 Roadway Design Criteria Per Bridge, clarification of overtopping flood
8 March 2011
- 10:1010:10, 8 March 2011 diff hist +155 m Category:503 Bridge Approach Slabs Per Organizational Results, link to reports added
- 10:0710:07, 8 March 2011 diff hist +83 m Category:405 Processing Reclaimed Asphalt →405.1 Design: Per Organizational Results, links to reports added
- 10:0510:05, 8 March 2011 diff hist +138 m 121.5 Asset Management →121.5.18 Intermodal Freight Connectivity: Per Organizational Results, links to reports added
- 10:0110:01, 8 March 2011 diff hist +96 m 132.2 Missouri's Blueprint - A Partnership Toward Zero Deaths Per Organizational Results, links to reports added
- 09:5809:58, 8 March 2011 diff hist +378 m 106.3.2.71 TM-71, Deleterious Content of Aggregate →106.3.2.71.4 Calculations for Deleterious Content: Per Organizational Results, links to reports added
- 09:5309:53, 8 March 2011 diff hist +474 m Category:232 Facility Selection Per Organizational Results, links to reports added
- 09:4509:45, 8 March 2011 diff hist +82 m Category:626 Rumble Strips →626.1 Edgeline Rumble Strips: Per Organizational Results, link to reports added
- 09:4309:43, 8 March 2011 diff hist +361 m Category:616 Temporary Traffic Control Per Organizational Results, links to reports added
- 09:3909:39, 8 March 2011 diff hist +80 m 606.2 Guard Cable →606.2.1 Guard Cable Types: Per Organizational Results, link to reports added
- 09:2609:26, 8 March 2011 diff hist +828 m 234.6 Diverging Diamond Interchanges Per Organizational Results, links to reports added
- 09:1509:15, 8 March 2011 diff hist +166 m Category:751 LRFD Bridge Design Guidelines Per Organizational Results, link to reports added
- 09:1209:12, 8 March 2011 diff hist +422 m Category:774 Cathodic Protection Per Organizational Results, links to reports added
- 09:0909:09, 8 March 2011 diff hist +597 m Category:710 Epoxy Coated Reinforcing Steel Per Organizational Results, links to reports added
- 09:0409:04, 8 March 2011 diff hist +179 m Category:705 Prestressed Concrete Members for Bridges →705.1 Construction Inspections for Sec 705: Per Organizational Results, link to reports added
- 09:0009:00, 8 March 2011 diff hist +164 m Category:772 Bridge Inspections Per Organizational Results, links to reports added
- 08:5808:58, 8 March 2011 diff hist +561 m 121.1 Public Involvement and Decision-Making Per Organizational Results, links to reports added
- 08:5108:51, 8 March 2011 diff hist +418 m Category:902 Signals Per Organizational Results, links to reports added
- 08:4808:48, 8 March 2011 diff hist +377 m 910.4 ITS Architecture →910.4.3.2.2 Incident Management: Per Organizational Results, links to reports added
- 08:4608:46, 8 March 2011 diff hist +377 m Category:948 Incident Response Plan and Emergency Response Management Per Organizational Results, links to reports added
- 08:4108:41, 8 March 2011 diff hist +281 m Category:127 MoDOT and the Environment Per Organizational Results, links to reports added