User contributions for Smithk
Jump to navigation
Jump to search
8 March 2011
- 07:3407:34, 8 March 2011 diff hist +421 m 127.2 Historic Preservation and Cultural Resources Per Organizational Results, link to reports added
- 07:2407:24, 8 March 2011 diff hist +99 m 233.3 Roundabouts Per Traffic, further clarification
7 March 2011
- 15:3415:34, 7 March 2011 diff hist +416 m 643.4 Railroads →643.4.1 Introduction and Railroad Project Overview: Per Organizational Results, links to reports added
- 15:2215:22, 7 March 2011 diff hist +221 m 233.3 Roundabouts Per Traffic, added link to NCHRP report
- 12:2512:25, 7 March 2011 diff hist +180 m 236.7 Negotiation Per RW, updated Pro Rata RE Tax Claim form
4 March 2011
- 11:0511:05, 4 March 2011 diff hist −3 m 236.3 Administration →236.3.12 Contracting with MoDOT and E-Verify Requirements: Per RW, minor clarifications
- 08:2308:23, 4 March 2011 diff hist −54 m Category:626 Rumble Strips Per Traffic, clarified the text since edgeline and centerline pavement markings are now using 2nd generation paint.
2 March 2011
- 14:4114:41, 2 March 2011 diff hist +198 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: Link from EPG 136.6 to EPG 134.3 added, per LPA Coordinator
- 14:3714:37, 2 March 2011 diff hist +160 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA Coordinator, added a link to EPG 134.3 for the Allowable Profit Curve
- 14:3214:32, 2 March 2011 diff hist +34 m Category:134 Engineering Professional Services →134.3.2.1.4 Review of Consultant Proposal: added link
24 February 2011
- 14:3814:38, 24 February 2011 diff hist 0 N File:203 Physical Studies of Pennsylvanian Shale in a High Fill.pdf No edit summary
- 14:3714:37, 24 February 2011 diff hist 0 N File:203 MCHRP 76-1.pdf No edit summary
- 14:3714:37, 24 February 2011 diff hist +441 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction Per Geotechnical Section, added two reports for additional information
- 10:5410:54, 24 February 2011 diff hist 0 N File:136.14.2.1 Disadvantaged Business Enterprise Program Requirements for Local Programs Jan 2011.doc No edit summary current
- 10:5410:54, 24 February 2011 diff hist 0 N File:136.14.2.1 DBE Submittal Forms Jan 2011.doc No edit summary current
- 10:5310:53, 24 February 2011 diff hist +164 m LPA:136.12 Figures, Glossary and Other Useful Links Noted update
- 10:5110:51, 24 February 2011 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.3.1 Commonly Used Forms: Updated DBE Submittal Form and Disadvantaged Busn. Enterprise Program form, per ECR
- 08:5608:56, 24 February 2011 diff hist −2 m Category:824 Adopt-A-Highway and Sponsor-A-Highway Programs →Adopt-A-Highway: updated info
- 07:3107:31, 24 February 2011 diff hist +176 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: EPG 136.11.9 revision noted
- 07:2107:21, 24 February 2011 diff hist +104 m LPA:136.11 Local Public Agency Construction →136.11.9 Materials Testing: Minor correction, per LPA Coordinator
22 February 2011
- 12:0012:00, 22 February 2011 diff hist 0 N File:136.10.1 Checklist for Bid Proposal (Fig. 10-1R) Feb 2011.xls No edit summary current
- 11:5911:59, 22 February 2011 diff hist 0 m 136.10 Construction Authorization and Letting minor correction for Fig 136.10.1, per Design
- 11:0011:00, 22 February 2011 diff hist +12 m 901.13 Lighting Proposed by Other Political Subdivisions on State Highways minor clarification
18 February 2011
- 14:1514:15, 18 February 2011 diff hist −173 m Category:620 Pavement Marking →Pavement Marking Guidelines: Clarification, per Traffic
17 February 2011
- 15:3615:36, 17 February 2011 diff hist 0 m 141.7 Transportation Improvement Program Approval Minor correction, per Planning
16 February 2011
- 14:2814:28, 16 February 2011 diff hist 0 N File:134.3.2.1.4 Allowable Profit.pdf No edit summary
- 14:2714:27, 16 February 2011 diff hist 0 N File:134.3.2.1.4 Allowable Profit.jpg No edit summary current
- 14:2714:27, 16 February 2011 diff hist +135 m Category:134 Engineering Professional Services →134.3.2.1.4 Review of Consultant Proposal: A more easily readable chart is provided, per Design
- 13:4313:43, 16 February 2011 diff hist +148 m 616.23 Traffic Control for Field Operations →Table 616.23.2.2.2 Sign Spacing: minor update, per Traffic
15 February 2011
- 12:2512:25, 15 February 2011 diff hist +179 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: Update of EPG 136.10.4 noted
- 12:2212:22, 15 February 2011 diff hist +13 m 136.10 Construction Authorization and Letting →136.10.4 On the Job Training (OJT): Per ECR, final trainee summary guidance updated
- 11:1311:13, 15 February 2011 diff hist +117 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: update to EPG 136.6 noted
- 11:1111:11, 15 February 2011 diff hist +1 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.6.6 Contract Submittal: minor correction
- 11:1111:11, 15 February 2011 diff hist 0 N File:136.6.1 Contract (Fig. 6-1) Feb 2011.doc No edit summary current
- 11:1011:10, 15 February 2011 diff hist −19 m LPA:136.4 Consultant Selection and Consultant Contract Management Per Design, again updated Fig. 136.6.1 Contract
- 10:0910:09, 15 February 2011 diff hist 0 N File:Digital Signature Frequently Asked Questions.doc No edit summary current
- 10:0810:08, 15 February 2011 diff hist +27 m Category:101 Standard Forms →Construction and Materials: Per CM: addition of QRG FAQ and removal of the Pay Quantity Certification since it will no longer be used
- 10:0410:04, 15 February 2011 diff hist −254 m Category:239 Construction Inspection Guidelines for Final Plans →239.10.2 Guidelines: The Pay Quantity Certification will no longer be used, per CM
- 08:3608:36, 15 February 2011 diff hist +27 m Category:129 Public Involvement Per RW, update of verbiage in invitation letter
- 08:3308:33, 15 February 2011 diff hist 0 N File:Invitation to a Public Hearing Letter (236.10) Feb 2011.doc No edit summary current
- 08:3208:32, 15 February 2011 diff hist +690 m 236.10 Right Of Way Condemnation Per RW, update of verbiage in invitation letter
10 February 2011
- 15:1115:11, 10 February 2011 diff hist 0 m Where to Find Construction and Materials Functions →EPG articles from Field Section 100 (General Conditions of the Contract): updated link
- 15:0415:04, 10 February 2011 diff hist −32 m Main Page New EPG 105.19, Digital Signatures
- 14:5414:54, 10 February 2011 diff hist 0 N File:Digital Signature QRG8 for ROUTINE Adobe Digital Signature Contractor.doc No edit summary current
- 14:5414:54, 10 February 2011 diff hist 0 N File:Digital Signature QRG7 for ROUTINE Adobe Digital Signature MoDOT.doc No edit summary current
- 14:5314:53, 10 February 2011 diff hist 0 N File:Digital Signature QRG6 for an INITIAL Adobe Digital Signature Contractor.doc No edit summary current
- 14:5314:53, 10 February 2011 diff hist 0 N File:Digital Signature QRG5 for an INITIAL Adobe Digital Signature MoDOT.doc No edit summary current
- 14:5314:53, 10 February 2011 diff hist 0 N File:Digital Signature QRG4 to prepare document for Contractor.doc No edit summary current
- 14:5314:53, 10 February 2011 diff hist 0 N File:Digital Signature QRG3c MoDOT authorized district level example signer list letter.doc No edit summary current
- 14:5214:52, 10 February 2011 diff hist 0 N File:Digital Signature QRG3b MoDOT authorized project office example signer list letter.doc No edit summary current