14 July 2010
- 12:1312:13, 14 July 2010 diff hist 0 N File:236.6 Statewide Fee Appraiser List Jul 14 2010.pdf No edit summary
- 12:1312:13, 14 July 2010 diff hist 0 m 236.6 Appraisal and Appraisal Review per RW, Roster of Approved Contract Appraisers updated
- 12:0012:00, 14 July 2010 diff hist −52 m Main Page Updated TA-26
- 11:5711:57, 14 July 2010 diff hist +11 m 616.23 Traffic Control for Field Operations cosmetic correction
- 11:4911:49, 14 July 2010 diff hist 0 N File:616.23.3.26.1 Jul10.jpg No edit summary current
- 11:4811:48, 14 July 2010 diff hist 0 N File:616.23.3.26 Jul10.jpg No edit summary current
- 11:4711:47, 14 July 2010 diff hist 0 N File:616.23.3 TA-26, Jul10.pdf No edit summary
- 11:4611:46, 14 July 2010 diff hist −203 m 616.23 Traffic Control for Field Operations TA-26 slightly updated, per Traffic
- 11:0511:05, 14 July 2010 diff hist 0 N File:Main Page July 14, 2010.jpg No edit summary current
- 11:0411:04, 14 July 2010 diff hist +105 m Main Page new photo
- 08:1108:11, 14 July 2010 diff hist −61 m 1057.4 Laboratory Testing for Sec 1057 →1057.4.1 Procedure: Per Bridge and CM, removed metric references and removed AASHTO's M42 and M53 since they are so rarely needed
- 08:0508:05, 14 July 2010 diff hist −504 m 1036.7 Laboratory Testing for Sec 1036 →1036.7.1 Procedure: Per Bridge and CM, removed metric references and removed AASHTO's M42 and M53 since they are so rarely needed
- 08:0008:00, 14 July 2010 diff hist −65 m Category:1036 Reinforcing Steel for Concrete Per Bridge and CM, removed metric designation
- 07:5507:55, 14 July 2010 diff hist −2 m 751.50 Standard Detailing Notes Per Bridge and CM, replaced "smooth" with the more correct "plain"
- 07:5107:51, 14 July 2010 diff hist +50 m 751.40 LFD Widening and Repair link updates
- 07:4807:48, 14 July 2010 diff hist +1 m 751.40 LFD Widening and Repair Per Bridge and CM, replaced "non-epoxy" with the more correct "uncoated"
- 07:3307:33, 14 July 2010 diff hist −245 m 751.5 Structural Detailing Guidelines Per Bridge and CM, replaced "non-epoxy" with the more correct "uncoated" and removed AASHTO's M42 and M53 since they are so rarely needed
- 06:4306:43, 14 July 2010 diff hist +3 m Category:710 Epoxy Coated Reinforcing Steel Per Bridge and CM, replaced "black" with the more correct "uncoated"
- 06:4306:43, 14 July 2010 diff hist +3 m Category:706 Reinforcing Steel for Concrete Structures Per Bridge and CM, replaced "black" with the more correct "uncoated"
- 06:4106:41, 14 July 2010 diff hist −55 m 106.3.2.74 TM-74, Pullout Tests on Epoxy Bonding Agents for Resin Anchor Systems Per Bridge and CM, replaced "plain" with the more correct "uncoated" and removed metric designations
- 06:3706:37, 14 July 2010 diff hist −7 m 106.3.2.49 TM-49, Pull-Out Tests on Chemical Bonding Agents Per Bridge and CM, replaced "smooth" with the more correct "plain" and removed metric designation
13 July 2010
- 12:2112:21, 13 July 2010 diff hist +172 m Main Page EPG 806.8
- 12:0812:08, 13 July 2010 diff hist 0 N File:806.8 SWPPP July 10.doc No edit summary current
- 12:0712:07, 13 July 2010 diff hist +2,850 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Environmental, Erosion Control Blanket clarified, new Turbidity Control and Chemical Stabilizers guidance, and general clarification in accordance with the Incident Response Priority Team
- 09:0009:00, 13 July 2010 diff hist 0 m 136.7 Right of Way and Public Hearings →136.7.2.2 Design Public Hearings: minor correction
- 08:5108:51, 13 July 2010 diff hist +2 m LPA:136.4 Consultant Selection and Consultant Contract Management minor corrections
- 08:2308:23, 13 July 2010 diff hist +6 m 136.2 Bridge Soft Match Credit Program →136.2.6 Request for Credit Submittal: minor corrections
12 July 2010
- 12:5312:53, 12 July 2010 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.9 Specifications and Job Special Provisions: minor correction
- 10:1410:14, 12 July 2010 diff hist 0 N File:751.1.2.31 FHWA flowchart.gif No edit summary
- 10:1410:14, 12 July 2010 diff hist +340 m 751.1 Preliminary Design →751.1.2.31 FHWA Submittal: Per Bridge, articles updated to coordinate with FHWA oversight policy established from a few years ago.
- 10:0010:00, 12 July 2010 diff hist +274 m 131.1 Design Exception Process →131.1.2 How to complete a design exception: Per Bridge, articles updated to coordinate with FHWA oversight policy established from a few years ago.
- 09:5409:54, 12 July 2010 diff hist +22 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bridge, article updated to coordinate with FHWA oversight policy established from a few years ago.
- 09:4709:47, 12 July 2010 diff hist +140 m Category:105 Control of Work →105.9.16.4.2 Federal Oversight: Per Bridge, article updated to coordinate with FHWA oversight policy established from a few years ago.
- 09:3009:30, 12 July 2010 diff hist −34 m Main Page EPG 616.21
- 09:2309:23, 12 July 2010 diff hist +4 m 616.21 Work Zone Technician Training minor correction
- 09:2309:23, 12 July 2010 diff hist 0 N File:616.21 WZ Technician Training July 2010.pdf No edit summary
- 09:2209:22, 12 July 2010 diff hist 0 N File:616.21 July 2010.jpg No edit summary current
- 09:2109:21, 12 July 2010 diff hist +76 m 616.21 Work Zone Technician Training Per Traffic, updated this guidance for 2010
- 07:4007:40, 12 July 2010 diff hist +3 m LPA:136.1 Introduction →136.1.9 Local Match Guidelines: minor clarification
- 07:3207:32, 12 July 2010 diff hist +4 m LPA:136.1 Introduction minor spelling corrections
9 July 2010
- 14:2314:23, 9 July 2010 diff hist +453 m 903.2 Extent of Signing →903.1.11 Sign Classification (MUTCD Section 2A.05): Per Traffic, clarification as to what signing may be provided
- 11:3811:38, 9 July 2010 diff hist +2,372 m 751.50 Standard Detailing Notes →H4. Conduit System: Per Bridge, clarified guidelines for conduit systems to go with expanded EPG 751.10 guidance
- 10:1910:19, 9 July 2010 diff hist −192 m 234.2 Diamond Interchanges →234.2.1 Introduction: removed more DDI info
- 10:1710:17, 9 July 2010 diff hist −4,311 m 234.2 Diamond Interchanges moved DDI info to new EPG 234.6.
- 10:1610:16, 9 July 2010 diff hist 0 m 234.6 Diverging Diamond Interchanges minor cosmetic adjustment
- 10:1410:14, 9 July 2010 diff hist +864 m 234.6 Diverging Diamond Interchanges →234.6.1.1 Advantages: minor expansion of guidance
- 09:5709:57, 9 July 2010 diff hist −58 m Main Page DDI
- 09:5209:52, 9 July 2010 diff hist 0 N File:234.6.5.pdf No edit summary current
- 09:4909:49, 9 July 2010 diff hist 0 N File:234.6.5 I 70 & Woods Chapel.pdf No edit summary current
- 09:4909:49, 9 July 2010 diff hist 0 N File:234.6.5 I 270 & Dorsett Rd.pdf No edit summary current