User contributions for Smithk
Jump to navigation
Jump to search
9 July 2010
- 08:1508:15, 9 July 2010 diff hist 0 m Category:806 Pollution, Erosion and Sediment Control "ensure" correction
- 08:1308:13, 9 July 2010 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements "ensure" correction
- 08:1108:11, 9 July 2010 diff hist 0 m 238.1 Aerial Mapping and LiDAR Surveys "ensure" correction
- 08:1008:10, 9 July 2010 diff hist 0 m Category:105 Control of Work "ensure" correction
- 08:0808:08, 9 July 2010 diff hist 0 m Category:702 Load-Bearing Piles "ensure" correction
- 08:0708:07, 9 July 2010 diff hist 0 m Category:409 Seal Coat "ensure" correction
- 08:0608:06, 9 July 2010 diff hist 0 m Category:239 Construction Inspection Guidelines for Final Plans "ensure" correction
- 08:0408:04, 9 July 2010 diff hist 0 m Category:774 Cathodic Protection "ensure" correction
- 08:0308:03, 9 July 2010 diff hist 0 m 103.1 Bid Opening and Award Process "ensure" correction
- 08:0008:00, 9 July 2010 diff hist 0 m 903.21 Construction Inspection Guidelines for Sec 903 "ensure" correction
- 07:5907:59, 9 July 2010 diff hist 0 m 750.3 Bridges "ensure" correction
- 07:5807:58, 9 July 2010 diff hist 0 m Category:1036 Reinforcing Steel for Concrete "ensure" correction
- 07:5607:56, 9 July 2010 diff hist 0 m Category:1005 Aggregate for Concrete →1005.4.2 Procedure: "ensure" correction
- 07:5507:55, 9 July 2010 diff hist 0 m Category:808 Planting Trees, Shrubs, and Other Plants →Construction Requirements (Sec 808.3): "ensure" correction
- 07:5407:54, 9 July 2010 diff hist 0 m Category:1037 Sheer Connectors →1037.2 Procedure: "ensure" correction
- 07:5307:53, 9 July 2010 diff hist 0 m 771.2 Bridge Cleaning and Flushing "ensure" correction
- 07:5207:52, 9 July 2010 diff hist 0 m Category:238 Surveying Activities "ensure" correction
- 07:5207:52, 9 July 2010 diff hist 0 m Category:804 Topsoil →804.1 Construction Inspection Guidance for Sec 804: "ensure" correction
- 07:5107:51, 9 July 2010 diff hist 0 m Category:1057 Material for Joints →1057.2.4 Sampling: "ensure" correction
- 07:5007:50, 9 July 2010 diff hist 0 m Category:1060 Electrical Conduit →1060.2.1.1 Rigid Steel Conduit, Zinc Coated: "ensure" correction
- 07:4907:49, 9 July 2010 diff hist 0 m 617.3 Material Inspection for Sec 617 →617.3.2 Procedure: "ensure" correction
- 07:2707:27, 9 July 2010 diff hist +2 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →Compacting in Cut (Sec 203.5.8): corrected a link to Sec 203
8 July 2010
- 08:3608:36, 8 July 2010 diff hist +240 m 751.22 Prestressed Concrete I Girders Addition of video
- 08:3308:33, 8 July 2010 diff hist 0 N File:751.22 Concrete Girder July 2010.wmv No edit summary current
- 08:2808:28, 8 July 2010 diff hist +81 m 234.4 Single Point Urban Interchanges (SPUIs) Addition of SPUI video
- 08:2708:27, 8 July 2010 diff hist 0 N File:234.4 SPUI June 2010.wmv No edit summary current
7 July 2010
- 15:4115:41, 7 July 2010 diff hist +41 m Main Page EPG 237.8.1 Calendar days
- 15:4015:40, 7 July 2010 diff hist +1 m 237.8 Contract Time →237.8.1 Working Days vs. Completion Dates: updated title
- 15:3515:35, 7 July 2010 diff hist −25 m 237.8 Contract Time →237.8.1 Working Days vs. Completion Dates: Per EPG Approval Process, contract time is now should be governed by calendar days on most projects.
- 14:4914:49, 7 July 2010 diff hist 0 N File:1029.4.6 July 2010.gif No edit summary current
- 14:4914:49, 7 July 2010 diff hist 0 N File:1029.4.5 July 2010.gif No edit summary current
- 14:4814:48, 7 July 2010 diff hist 0 N File:1029.4.4 July 2010.gif No edit summary current
- 14:4814:48, 7 July 2010 diff hist 0 N File:1029.4.3 July 2010.gif No edit summary current
- 14:4714:47, 7 July 2010 diff hist 0 N File:1029.4.2 July 2010.jpg No edit summary current
- 14:4714:47, 7 July 2010 diff hist 0 N File:1029.4.1 July 2010.jpg No edit summary current
- 14:4614:46, 7 July 2010 diff hist +804 m Category:1029 Fabricating Prestressed Concrete Members for Bridges Clarification, per CM, of guidance for directional assignment of tolerances
- 13:0813:08, 7 July 2010 diff hist 0 N File:617.2 2 Loop.jpg No edit summary current
- 13:0713:07, 7 July 2010 diff hist +1 m 617.2 Construction Inspection Guidelines for Sec 617 minor correction
- 12:4312:43, 7 July 2010 diff hist 0 N File:617.2 Improper.jpg No edit summary current
- 12:4312:43, 7 July 2010 diff hist 0 N File:617.2 Proper.jpg No edit summary current
- 12:4312:43, 7 July 2010 diff hist 0 N File:617.2 Loop.jpg No edit summary current
- 12:4212:42, 7 July 2010 diff hist 0 N File:617.2 3 Loop Improper.jpg No edit summary current
- 12:4212:42, 7 July 2010 diff hist 0 N File:617.2 3 Loop Proper 2.jpg No edit summary current
- 12:4112:41, 7 July 2010 diff hist 0 N File:617.2 3 Loop Proper 1.jpg No edit summary current
- 12:4112:41, 7 July 2010 diff hist +1,397 m 617.2 Construction Inspection Guidelines for Sec 617 Per Traffic and CM, additional guidance on the connection between various barrier types
- 11:3411:34, 7 July 2010 diff hist +138 m Main Page EPG 110.2 federal poster
- 10:2510:25, 7 July 2010 diff hist 0 N File:135.4 Jobsite bulletin board checklist July 2010.pdf No edit summary
- 10:2410:24, 7 July 2010 diff hist +237 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per ECR, new Federal poster (Employee Rights) added. Checklist of jobsite posters also updated.
- 10:2110:21, 7 July 2010 diff hist 0 N File:110.2 Employee Rights National Labor Relations Spanish.pdf No edit summary
- 10:2110:21, 7 July 2010 diff hist 0 N File:110.2 Employee Rights National Labor Relations.pdf No edit summary