User contributions for Smithk
Jump to navigation
Jump to search
1 July 2010
- 11:2311:23, 1 July 2010 diff hist +68 m Category:1026 Reinforced Concrete Culvert Pipe →1026.2.5 Field Inspection and Testing for Acceptance: updated links
- 11:2011:20, 1 July 2010 diff hist +48 m Category:1019 Cement updated link
- 11:1911:19, 1 July 2010 diff hist +48 m Category:1017 Slag Cement updated link
- 11:1911:19, 1 July 2010 diff hist +102 m Category:1015 Bituminous Material updated links
- 11:1811:18, 1 July 2010 diff hist +48 m Category:132 Safety →132.1 Material Inspection for Safety: updated link
- 11:1711:17, 1 July 2010 diff hist +48 m Category:1058 Polyethylene Sheeting updated links
- 11:1611:16, 1 July 2010 diff hist +48 m Category:1018 Fly Ash for Concrete update link
- 11:1611:16, 1 July 2010 diff hist +48 m Category:1001 General Requirements for Material update link
- 11:1411:14, 1 July 2010 diff hist +48 m Category:1060 Electrical Conduit update link
- 11:1411:14, 1 July 2010 diff hist +48 m Category:1062 Pull and Junction Boxes update link
- 11:1311:13, 1 July 2010 diff hist +48 m Category:1043 Fence Material updated link
- 11:1211:12, 1 July 2010 diff hist +48 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material update link
- 11:1111:11, 1 July 2010 diff hist +98 m Category:1070 Water updated links
- 11:1011:10, 1 July 2010 diff hist +48 m Category:1056 Concrete Tinting Material updated link
- 11:1011:10, 1 July 2010 diff hist +52 m Category:202 Removal of Buildings and Structures →202.5 Construction Inspection Guidelines for Sec 202: updated links
- 11:0711:07, 1 July 2010 diff hist +48 m Category:606 Guardrail and Guard Cable →Construction Inspection Guidelines for Sec 606: update link
- 11:0411:04, 1 July 2010 diff hist +10 m Category:106 Control of Material update link
- 11:0211:02, 1 July 2010 diff hist +5 m 460.4 Paving Equipment →460.4.1 Distributor: updated link
- 11:0111:01, 1 July 2010 diff hist +10 m Where to Find Construction and Materials Functions →EPG articles from General Section 1 thru 18: updated link
- 11:0011:00, 1 July 2010 diff hist +10 m Category:501 Concrete →501.2.1 Scope: updated link
- 10:5810:58, 1 July 2010 diff hist +10 m Category:403 Asphaltic Concrete Pavement →403.2.1 Scope: updated link
- 10:5610:56, 1 July 2010 diff hist +10 m Category:402 Bituminous Surface Leveling →402.3.1 Scope: update link
- 10:5510:55, 1 July 2010 diff hist +10 m Category:401 Bituminous Base and Pavement →401.3.1 Scope: updated link
- 10:5310:53, 1 July 2010 diff hist +378 Nm 106.8 Material Furnished by the Commission Per CM, for greater clarity,old EPG 106.8 (1047 hits) was moved to EPG 106.19 to align with Sec 106.
- 10:4710:47, 1 July 2010 diff hist +282 N 106.7 Unacceptable Material Per CM, for greater clarity,old EPG 106.7 (4526 hits) was moved to EPG 106.3 to align the EPG with Sec 106.7.
- 10:2210:22, 1 July 2010 diff hist +276 m Category:106.3.2 Material Inspection Test Methods Per CM, EPG 106.3.2 was moved from EPG 106.7. Old EPG 106.7 had 4526 hits and no appreciable history
- 10:0310:03, 1 July 2010 diff hist +324 Nm 106.5 Storage of Materials Per CM, for greater clarity,old EPG 106.5 (2258 hits) was moved to EPG 106.3. 3/20/09: Screw-top metal containers were specified for some materials listed in this table, per Chemical Lab current
- 09:5709:57, 1 July 2010 diff hist +12,939 Nm 106.4 Plant Inspections EPG 106.4 renamed to match title of Sec 106.4, per CM. Old 106.4 had 1384 hits. 3/1/10: Ready-mix plants to be calibrated annually and other minor updates, per CM
- 09:1809:18, 1 July 2010 diff hist +2 m Category:501 Concrete →501.1.6.2 Central Mixing (Sec 501.8.2): updated link
- 09:1409:14, 1 July 2010 diff hist +9,583 Nm 106.3.2.82 TM-82, Concrete Uniformity Per CM, article moved to conform with Sec 106. Old EPG 106.7.82 had no appreciable history and 1486 hits
- 09:0309:03, 1 July 2010 diff hist −1,587 m 106.3.2.81 TM-81, Specific Gravity and Absorption of Aggregate Using Automatic Vacuum Sealing Method updated links
- 08:5108:51, 1 July 2010 diff hist +39,259 Nm 106.3.2.81 TM-81, Specific Gravity and Absorption of Aggregate Using Automatic Vacuum Sealing Method Per CM, article moved to conform with Sec 106. Old EPG 106.7.81 had no appreciable history and 2638 hits
- 08:4908:49, 1 July 2010 diff hist +2 m 620.12 Construction Inspection for Sec 620 updated link
- 08:2308:23, 1 July 2010 diff hist +4,833 Nm 106.3.2.80 TM-80, Measurement of Retroreflectivity by Handheld Retroreflectometers Per CM, article moved to conform with Sec 106. Old EPG 106.7.80 had no appreciable history and 746 hits
- 08:2008:20, 1 July 2010 diff hist +2,341 Nm 106.3.2.79 TM-79, Procedure to Prepare Aggregate to Determine the Plasticity Index Per CM, article moved to conform with Sec 106. Old EPG 106.7.79 had no appreciable history and 674 hits current
- 08:1908:19, 1 July 2010 diff hist +3,093 Nm 106.3.2.78 TM-78, Los Angeles Abrasion for Lightweight Aggregate Per CM, article moved to conform with Sec 106. Old EPG 106.7.78 had no appreciable history and 1715 hits current
- 08:1708:17, 1 July 2010 diff hist +884 Nm 106.3.2.77 TM-77, Determining the Binder Ignition Aggregate Correction Factor for Mixtures Containing Rap Per CM, article moved to conform with Sec 106. Old EPG 106.7.77 had no appreciable history and 655 hits current
- 08:1608:16, 1 July 2010 diff hist 0 m 413.3 Ultrathin Bonded Asphalt Wearing Surface →413.3.2 Laboratory Procedure: updated link
- 08:1408:14, 1 July 2010 diff hist +6,956 Nm 106.3.2.76 TM-76, Acid Insoluble Residue Per CM, article moved to conform with Sec 106. Old EPG 106.7.76 had no appreciable history and 1408 hits
- 08:1308:13, 1 July 2010 diff hist +5,856 Nm 106.3.2.75 TM-75, Determining Segregation Using the Nuclear Density Gauge Per CM, article moved to conform with Sec 106. Old EPG 106.7.75 had no appreciable history and 1066 hits current
- 08:1108:11, 1 July 2010 diff hist +3,376 Nm 106.3.2.74 TM-74, Pullout Tests on Epoxy Bonding Agents for Resin Anchor Systems Per CM, article moved to conform with Sec 106. Old EPG 106.7.74 had no appreciable history and 1043 hits
- 08:0908:09, 1 July 2010 diff hist +7,737 Nm 106.3.2.73 TM-73, Volume of Voids in Compacted Filler or Fines Per CM, article moved to conform with Sec 106. Old EPG 106.7.73 had no appreciable history and 933 hits current
- 08:0708:07, 1 July 2010 diff hist +8,954 Nm 106.3.2.72 TM-72, Sweep Test of Bituminous Surface Treatment Samples Per CM, article moved to conform with Sec 106. Old EPG 106.7.72 had no appreciable history and 844 hits current
- 08:0208:02, 1 July 2010 diff hist +2 m Category:1009 Aggregate for Drainage →1009.4.2.4 Deleterious Content: updated link
- 08:0108:01, 1 July 2010 diff hist +2 m Category:1006 Aggregate for Surfacing →1006.4.3.4 Deleterious Content: updated link
- 08:0008:00, 1 July 2010 diff hist +2 m Category:1005 Aggregate for Concrete →1005.4.2.7 Deleterious Content: updated link
- 08:0008:00, 1 July 2010 diff hist +2 m Category:1004 Graded Aggregate for Bituminous Surface →1004.4.2.5 Deleterious Content: updated link
- 07:5907:59, 1 July 2010 diff hist +2 m Category:1002 Aggregate for Asphaltic Concrete →1002.5.2.5 Deleterious Content: updated link
- 07:5807:58, 1 July 2010 diff hist +2 m Category:1003 Aggregate for Seal Coats →1003.4.2.5 Deleterious Content: updated link
- 07:5807:58, 1 July 2010 diff hist +1 m Category:1007 Aggregate for Base →1007.4.2.6 Deleterious Content: updated link