User contributions for Smithk
Jump to navigation
Jump to search
6 May 2010
- 09:1109:11, 6 May 2010 diff hist 0 N File:616.6.2.jpg No edit summary current
- 09:1109:11, 6 May 2010 diff hist 0 N File:616.6.1.jpg No edit summary current
- 08:4608:46, 6 May 2010 diff hist +1 m 616.23 Traffic Control for Field Operations →616.23.3.3 TA-3 Shoulder Work on Divided Highways: minor cosmetic adjustment
- 08:4508:45, 6 May 2010 diff hist 0 N File:616.23.3.3 Dec09.jpg No edit summary current
- 08:4408:44, 6 May 2010 diff hist 0 N File:616.23.3 TA-3 Dec09.pdf No edit summary
- 08:4308:43, 6 May 2010 diff hist +18 m 616.23 Traffic Control for Field Operations Flags added to some TA-3 signs, per Traffic
4 May 2010
- 09:3009:30, 4 May 2010 diff hist +407 m Main Page AFAD, PSFD and WO20-3a info added
- 08:5608:56, 4 May 2010 diff hist −5 m 616.23 Traffic Control for Field Operations →616.23.2.6.1 Duration of Work: Clarification - replacing "cones" with "channelizers" and related changes, per Traffic
- 08:5208:52, 4 May 2010 diff hist −34 m 238.2 Land Surveying →238.2.9 Traffic safety: Clarification - replacing "cones" with "channelizers" and related changes, per Traffic
- 08:4108:41, 4 May 2010 diff hist −14 m 616.23 Traffic Control for Field Operations →616.23.3.26 TA-26 Highway Closure: minor cosmetic adjustment
- 08:3908:39, 4 May 2010 diff hist 0 N File:616.23.3.26 Mar10.jpg No edit summary current
- 08:3608:36, 4 May 2010 diff hist 0 N File:616.23.3 TA-26, Mar10.pdf No edit summary
- 08:3608:36, 4 May 2010 diff hist +720 616.23 Traffic Control for Field Operations Road Closed XX Miles sign info added, per Traffic
- 08:1508:15, 4 May 2010 diff hist +1 m 616.18 Construction Inspection Guidelines for Sec 616 →Flagger Requirements (for Sec 616.4.3): minor correction
- 08:1508:15, 4 May 2010 diff hist +569 m 616.18 Construction Inspection Guidelines for Sec 616 →Flagger Requirements (for Sec 616.4.3): Per Traffic, AFAD and PSFD info added
- 07:5007:50, 4 May 2010 diff hist +711 m 616.23 Traffic Control for Field Operations →616.23.2.4 Flagger Control: Per Traffic, AFAD and PSFD info added
3 May 2010
- 15:4615:46, 3 May 2010 diff hist +107 616.23 Traffic Control for Field Operations No edit summary
- 15:4015:40, 3 May 2010 diff hist 0 N File:616.23.3 TA-7B.pdf No edit summary
- 15:4015:40, 3 May 2010 diff hist 0 N File:616.23.3 TA-7A.pdf No edit summary
- 15:4015:40, 3 May 2010 diff hist +255 m 616.23 Traffic Control for Field Operations →616.23.3 Typical Application
- 15:3515:35, 3 May 2010 diff hist 0 N File:616.23.3.7A.jpg No edit summary current
- 15:3515:35, 3 May 2010 diff hist +5,961 616.23 Traffic Control for Field Operations →616.23.3.7 TA-7 Lane Closure on Two-Lane Highways Using Flaggers: Per Traffic, TA 7A and 7B added. AFAD and PSFD guidance.
- 15:0415:04, 3 May 2010 diff hist 0 N File:616.23.3.7B.jpg No edit summary current
- 13:3913:39, 3 May 2010 diff hist 0 N File:606.1 Guard cable.wmv No edit summary current
- 13:3713:37, 3 May 2010 diff hist 0 N File:606.1 is this for real.wmv No edit summary current
- 12:5612:56, 3 May 2010 diff hist −34 m 237.9 Submission of Plans and Supporting Documents minor cosmetic adjustment
- 12:2712:27, 3 May 2010 diff hist −112 m 616.23 Traffic Control for Field Operations →616.23.2.5.5 Barricades: Clarified barricade info, per Traffic
- 12:2412:24, 3 May 2010 diff hist +367 m 616.23 Traffic Control for Field Operations →616.23.2.5.4 Channelizers: Per Traffic, "vertical panel" information provided (that may be used instead of trim-line channelizers)
- 12:0712:07, 3 May 2010 diff hist −55 m 616.23 Traffic Control for Field Operations →616.23.2.5 Temporary Traffic Control Devices: Clarification - replacing "cones" with "channelizers" in some cases, per Traffic
- 12:0312:03, 3 May 2010 diff hist −3 m 616.18 Construction Inspection Guidelines for Sec 616 →For Sec. 616.3.3: Clarification - replacing "cones" with "channelizers" and related changes, per Traffic
- 12:0112:01, 3 May 2010 diff hist +7 m 620.1 General (MUTCD Chapter 3A) →620.1.3 Materials (MUTCD Section 3A.03): Clarification - replacing "cones" with "channelizers", per Traffic
- 11:5911:59, 3 May 2010 diff hist +7 m Category:Safe and Sound →General: Clarification - replacing "cones" with "channelizers", per Traffic
- 11:5711:57, 3 May 2010 diff hist −36 m 238.3 Route Surveying →238.3.40 Traffic safety: Clarification - replacing "cones" with "channelizers" and related changes, per Traffic
- 11:0811:08, 3 May 2010 diff hist 0 N File:616.2.1 Road Closed Beyond mar 10.pdf No edit summary
- 11:0711:07, 3 May 2010 diff hist +7 m Category:616 Temporary Traffic Control per Traffic, updated Fig 616.2.1 Typical detour.
- 09:2609:26, 3 May 2010 diff hist +1 m 616.23 Traffic Control for Field Operations →616.23.3.7 TA-7 Lane Closure on Two-Lane Highways Using Flaggers: minor cosmetic adjustment
30 April 2010
- 15:3515:35, 30 April 2010 diff hist +55 m 606.2 Guard Cable added guard cable video
- 15:3315:33, 30 April 2010 diff hist +86 m Category:606 Guardrail and Guard Cable Added MoDOT video
- 07:4907:49, 30 April 2010 diff hist +220 m Category:128 Conceptual Studies →128.5 Crash Rate Calculation: Minor clarification (from EPG 905.1.1.1), per Design
27 April 2010
- 10:0110:01, 27 April 2010 diff hist +815 m 751.13 Expansion Joint Systems →751.13.6 Finger Plate Expansion Devices: Added table to EPG 751.13.6.1 for clarification and updated LRFD DG references with EPG references, per Bridge
- 08:2908:29, 27 April 2010 diff hist −195 m 750.3 Bridges →750.3.2.5.2 Contraction Scour: Per Bridge, deleted info whose origin is unknown
- 07:3907:39, 27 April 2010 diff hist +189 m 751.31 Open Concrete Intermediate Bents Updated LRFD DG references with EPG references, per Bridge
- 07:2407:24, 27 April 2010 diff hist −7 m 751.10 General Superstructure →751.10.1.6 Slab Overhang Section Design: minor clarification
26 April 2010
- 15:3015:30, 26 April 2010 diff hist +155 m 748.8 Development in Floodplains Per Bridge, minor updates about paper copies and the Commission's address
- 14:4214:42, 26 April 2010 diff hist 0 N File:402 Example of Contract Leveling Course Plans Apr 2010.pdf No edit summary
- 14:4114:41, 26 April 2010 diff hist −343 m Category:402 Bituminous Surface Leveling →402.1.1 Plan Preparation: Outdated "A" format info removed. Updated examples of CLC plans also provided, per Design
- 12:1912:19, 26 April 2010 diff hist −445 m Main Page EPG 942 re-titled, per Traffic
- 12:1212:12, 26 April 2010 diff hist +171 m Category:942 Approved Products List Minor clarification, per Traffic
- 11:0911:09, 26 April 2010 diff hist −34 m Category:900 TRAFFIC CONTROL Per Traffic, link to new EPG 942 article provided
- 11:0711:07, 26 April 2010 diff hist −34 m 616.18 Construction Inspection Guidelines for Sec 616 →Material (for Sec 616.2): update to EPG 942, per Traffic