User contributions for Smithk
Jump to navigation
Jump to search
12 November 2009
- 10:4110:41, 12 November 2009 diff hist +32 m Where to Find PDM Information in the EPG →Chapter I, General Information: article construction
- 10:1510:15, 12 November 2009 diff hist −4 m 233.1 At-Grade Intersections - Driveways and Entrances →233.1.1 Intersection Sight Distance Criteria: article construction
10 November 2009
- 09:2009:20, 10 November 2009 diff hist −374 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, references to Secs 102 and 103 deleted since they were not deemed to apply. Other minor clarifications.
9 November 2009
- 11:3311:33, 9 November 2009 diff hist +6 m 236.5 Property Management Per RW, corrected the link to RW4 contract from the RW3 link
6 November 2009
- 15:4615:46, 6 November 2009 diff hist +6 m 903.5 Regulatory Signs →903.5.4 STOP Sign (R1-1) (MUTCD Section 2B.04): article construction
- 10:4010:40, 6 November 2009 diff hist −124 m 131.4 Design Exception Process →131.4.1.2 How to complete a design exception: Removed "the structural project manager does not sign this form" to comply with Bridge practise
4 November 2009
- 14:3214:32, 4 November 2009 diff hist 0 File:237.2 title sheet.jpg uploaded a new version of "Image:237.2 title sheet.jpg" current
- 14:3114:31, 4 November 2009 diff hist 0 File:237.4 Plan-Profile Sheet.jpg uploaded a new version of "Image:237.4 Plan-Profile Sheet.jpg" current
- 11:3411:34, 4 November 2009 diff hist 0 m Category:627 Contractor Surveying and Staking →Guidance for Checking Contractor Surveying and Staking: article construction
- 10:5810:58, 4 November 2009 diff hist 0 N File:627 Preconstruction Checklist.doc No edit summary current
- 10:5810:58, 4 November 2009 diff hist −19 m Category:627 Contractor Surveying and Staking →Contractor Furnished Surveying and Staking Pre-Construciton Checklist: Inserted newly edited checklist
3 November 2009
- 16:0716:07, 3 November 2009 diff hist −12 m Category:130 Value Engineering →130.2 Contractor initiated VECP’s: article construction
- 10:4210:42, 3 November 2009 diff hist +31 m 130.6 Project Manager’s Guide →Value Engineering Overview: added photo
- 10:4110:41, 3 November 2009 diff hist +31 m 130.7 Value Engineering Team Leader Guide added photo
- 10:4110:41, 3 November 2009 diff hist 0 N File:130.4.jpg No edit summary current
- 10:1210:12, 3 November 2009 diff hist 0 N File:130.3.jpg No edit summary current
2 November 2009
- 11:3811:38, 2 November 2009 diff hist −29 m 903.14 Emergency Management Signing article construction
- 11:3711:37, 2 November 2009 diff hist 0 N File:903.12.jpg No edit summary current
- 09:1109:11, 2 November 2009 diff hist +18 m Category:130 Value Engineering →130.1.5 VE Study Process: article construction
- 09:0909:09, 2 November 2009 diff hist +53 m Category:130 Value Engineering article construction
29 October 2009
- 15:4315:43, 29 October 2009 diff hist −77 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, references to "questionnaire" have been replaced with "rating". Contractor Performance Rating is not to be confused with the Contractor Questionnaire.
- 15:3215:32, 29 October 2009 diff hist +270 m Main Page article construction, per TR
- 15:1615:16, 29 October 2009 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Performance Discussion: article construction
- 15:1515:15, 29 October 2009 diff hist 0 N File:110.3.jpg No edit summary current
- 10:5610:56, 29 October 2009 diff hist −15 m Help Article →Division Contacts: removed a contact that is now in another group
- 10:2810:28, 29 October 2009 diff hist +12 m Main Page article construction
- 08:3408:34, 29 October 2009 diff hist −32 m 903.18 Signing for School Areas →Table 903.16.5.10 Sight Distance Requirements (for use of S3-1 sign): Per Traffic, removed S4-1 reference since it has not been used in a long time.
28 October 2009
- 15:2415:24, 28 October 2009 diff hist −1 m 234.2 Diamond Interchanges article construction
- 15:1215:12, 28 October 2009 diff hist 0 N File:Thickness determination concrete.jpg No edit summary current
- 15:0615:06, 28 October 2009 diff hist 0 N File:Thickness determination asphalt.jpg No edit summary current
- 14:5114:51, 28 October 2009 diff hist +31 m Category:754 Bridge Engineering Assistance Program (BEAP) added photo
- 14:5014:50, 28 October 2009 diff hist 0 N File:754.jpg No edit summary current
- 14:3814:38, 28 October 2009 diff hist +167 m 821.18 Noxious Weeds added knapweed weevil photo
- 14:3514:35, 28 October 2009 diff hist 0 N File:821.18 knapweed weevil.jpg No edit summary current
- 10:1910:19, 28 October 2009 diff hist −37 m Category:1190 Graffiti Removers updated link for graffiti removers, per OR
27 October 2009
- 15:0715:07, 27 October 2009 diff hist −28 m Category:1160 Qualified Cleaning Compounds Updated link to cleaning compounds (that had been called "restricted cleaning compounds")
- 12:1312:13, 27 October 2009 diff hist −17 m Category:1036 Reinforcing Steel for Concrete updated link to Reinforcing Steel for Concrete
- 11:0211:02, 27 October 2009 diff hist −1,437 m Main Page rounding instructions for EPG 109
- 10:5710:57, 27 October 2009 diff hist +572 m Category:109 Payment Documentation Policy →Measurement and Payment: Per CM, clarification about how HQ expects rounding to be performed relative to when work is posted to the job.
- 08:3108:31, 27 October 2009 diff hist −14 m 136.13 Glossary article construction
23 October 2009
- 14:2814:28, 23 October 2009 diff hist 0 m 238.2 Land Surveying →238.2.6 Survey Supervision: article construction
22 October 2009
- 14:4914:49, 22 October 2009 diff hist −41 m 233.1 At-Grade Intersections - Driveways and Entrances article construction
- 14:4414:44, 22 October 2009 diff hist −4 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.1 Intersection Sight Distance Criteria: article construction
- 14:4314:43, 22 October 2009 diff hist −2 m Category:207 Linear Grading →207.2 Class 2 Linear Grading: article construction
- 14:4214:42, 22 October 2009 diff hist −83 m 230.2 Vertical Alignment article construction
- 14:1614:16, 22 October 2009 diff hist −2 m Category:233 At - Grade Intersections article construction
- 14:1414:14, 22 October 2009 diff hist −40 m 230.1 Horizontal Alignment article construction
- 14:1214:12, 22 October 2009 diff hist 0 N File:230.1.jpg No edit summary current
- 10:1810:18, 22 October 2009 diff hist +5,408 m 1020.5 Corrugated Metal Pipe (CMP) Inspection Guide →Table 1020.5.3 Corrugated Metallic-Coated Steel Circular Pipe (Riveted, Bolted or Spot-Welded Seam), from Std. Plan 725.00: added std plan table, per CM
- 08:2408:24, 22 October 2009 diff hist +1 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material article construction