User contributions for Smithk
Jump to navigation
Jump to search
17 July 2009
- 09:2409:24, 17 July 2009 diff hist −4 m Category:627 Contractor Surveying and Staking article construction
- 09:2109:21, 17 July 2009 diff hist +10 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →Method Of Measurement (Sec 203.8): article construction
- 09:1909:19, 17 July 2009 diff hist −185 m 238.4 Construction Surveying article construction
- 09:0009:00, 17 July 2009 diff hist −2 m 748.7 Bridge Reports and Layouts →748.7.4.3 Information Necessary: article construction
- 08:5908:59, 17 July 2009 diff hist −2 m 237.5 Special Provisions article construction
- 08:5808:58, 17 July 2009 diff hist −300 m 238.3 Route Surveying article construction
16 July 2009
- 13:3213:32, 16 July 2009 diff hist −17 m Main Page article construction
- 13:2713:27, 16 July 2009 diff hist +275 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.9.3 Payment Estimates: Clarification of payment guidance for the Resident Engineer's diary
- 10:2910:29, 16 July 2009 diff hist +1,255 m 643.4 Railroads →643.4.1.7 Railroad Crossing Median Islands: Inserted Quiet Zone article information into EPG 643.4.1.7
- 10:1010:10, 16 July 2009 diff hist −26 m 236.4 Description Writing and Titles article construction
- 10:0510:05, 16 July 2009 diff hist +42 m 236.3 Administration article construction
- 10:0210:02, 16 July 2009 diff hist +60 m 236.13 Designing Right of Way Plans article construction
- 10:0110:01, 16 July 2009 diff hist +1 m 236.3 Administration article construction
- 09:5809:58, 16 July 2009 diff hist −2 m 237.9 Submission of Plans and Supporting Documents →237.9.6.2 PS&E Submittal Package: article construction
- 09:3109:31, 16 July 2009 diff hist −2 m 232.5 Freeways article construction
- 09:3109:31, 16 July 2009 diff hist −2 m 232.4 Expressways article construction
- 09:3009:30, 16 July 2009 diff hist −2 m Category:235 Preliminary Plans →235.2.3 Project Agreements: article construction
- 09:2609:26, 16 July 2009 diff hist +2,475 m 236.13 Designing Right of Way Plans Inserted Functional Classification article's info into EPG 236.13.1
- 08:3508:35, 16 July 2009 diff hist −4 m Where to Find PDM Information in the EPG →Chapter VI, Pavement Structure Design: article construction
- 08:3208:32, 16 July 2009 diff hist −2 m 620.8 Islands →620.7.1 General (MUTCD Section 3G.01): article construction
- 08:3108:31, 16 July 2009 diff hist −4 m Category:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches →608.5 Paved Approaches: article construction
- 08:2708:27, 16 July 2009 diff hist +1,477 m 233.2 At-Grade Intersections with Stop and Yield Control Inserted "Entering and Stopping Sight Distance" article info as a box
- 07:5707:57, 16 July 2009 diff hist +9 Category:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches →608.1 Discussion: article construction
14 July 2009
- 15:5415:54, 14 July 2009 diff hist +4 236.6 Appraisal and Appraisal Review →236.6.3.1 Standard Appraisal Format
- 15:5315:53, 14 July 2009 diff hist +1,064 236.6 Appraisal and Appraisal Review →236.6.3.1 Standard Appraisal Format
- 13:1013:10, 14 July 2009 diff hist +8 m Main Page article construction
- 12:4812:48, 14 July 2009 diff hist +262 m 910.3 Dynamic Message Signs (DMS) →910.3.2.3 Message Priorities: Per Traffic, DMS Message Request Guidelines added
- 12:4412:44, 14 July 2009 diff hist 0 N File:910.3.2.3 DMS Message Approval Board Guidelines.doc No edit summary current
13 July 2009
- 10:0710:07, 13 July 2009 diff hist +2,330 m 127.7 Threatened and Endangered Species →127.7.3.9 Post-Letting Activities: article construction
- 10:0710:07, 13 July 2009 diff hist 0 N File:127.7.3.9.jpg No edit summary current
- 09:5209:52, 13 July 2009 diff hist 0 N File:944.3.jpg No edit summary current
- 09:5209:52, 13 July 2009 diff hist +447 m Category:944 Radio Operation →944.3 Mobile Unit Operating Procedure: article construction
10 July 2009
- 11:1911:19, 10 July 2009 diff hist −1 m 103.1 Bid Opening and Award Process Clarification, per Design, of the advertising period.
8 July 2009
- 15:2815:28, 8 July 2009 diff hist +1 m 127.2 Historic Preservation and Cultural Resources article construction
- 15:2515:25, 8 July 2009 diff hist +28 m 127.2 Historic Preservation and Cultural Resources article construction
- 15:0115:01, 8 July 2009 diff hist +3 m 620.1 General (MUTCD Chapter 3A) →620.1.7 Temporary Pavement Markings: article construction
- 10:5110:51, 8 July 2009 diff hist +71 m 127.2 Historic Preservation and Cultural Resources article construction
- 10:0710:07, 8 July 2009 diff hist +45 m 127.2 Historic Preservation and Cultural Resources →127.2.1.1 Historic Preservation Regulations and Laws: article construction
- 08:2308:23, 8 July 2009 diff hist +1,553 m 127.10 Section 4(f) Public Lands →127.10.2 Process: moved unnumbered "Section 4(f) Evaluations" article into this article
7 July 2009
- 15:4615:46, 7 July 2009 diff hist +43 m 232.1 Climbing Lanes article construction
- 15:4415:44, 7 July 2009 diff hist +43 m 233.3 Roundabouts →233.3.2.1 Justification for Use:: article construction
- 15:4215:42, 7 July 2009 diff hist +43 m 230.2 Vertical Alignment →230.2.1.7 Passing Sight Distance: article construction
- 15:4115:41, 7 July 2009 diff hist +44 m 231.3 Lane Width →231.3.1 Introduction: article construction
- 15:3915:39, 7 July 2009 diff hist +43 m Category:940 Access Management article construction
- 15:3615:36, 7 July 2009 diff hist +23 m 121.5 Asset Management →121.5.21 Level of Service: article construction
- 15:1915:19, 7 July 2009 diff hist −48 m 822.1 General Policy article construction
- 14:5114:51, 7 July 2009 diff hist +22 m 821.23 Additives and Adjuvants updated MSDS link, per Risk and Benefit
- 14:4814:48, 7 July 2009 diff hist +22 m 821.25 Products updated MSDS link, per Risk and Benefits
- 14:4714:47, 7 July 2009 diff hist +22 m 821.9 Labels and Safety Data Sheets (SDS) updated MSDS link, per Risk and Benefits
- 14:4714:47, 7 July 2009 diff hist +22 m 821.6 Inventory Control and Storage updated MSDS link, per Risk and Benefits