User contributions for EPG-Admin
Jump to navigation
Jump to search
26 February 2009
- 11:5711:57, 26 February 2009 diff hist +260 Main Page Added Delivery of Electronic Design Data for Pavement to Recent Changes.
- 11:5111:51, 26 February 2009 diff hist +214 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Moved Delivery of Pavement Data to 237.14.2, separate from GPS electronic data.
- 11:1311:13, 26 February 2009 diff hist +296 237.14 Electronic Design Data Delivery (BIM Deliverables) Added 237.14.1.8 pavement data to the list of electronic deliverables.
- 09:5609:56, 26 February 2009 diff hist +9 m Category:101 Standard Forms Added MCHR-9 designation to Discrimination in Employment poster.
25 February 2009
- 18:2718:27, 25 February 2009 diff hist +383 N Talk:135.4 Required Notices and Posters New page: The ''Discrimination In Employment is Prohibited by Law in Missouri'' ''(MCHR9)'' poster is required on all project bulletin boards per 135.4 of the EPG. However, it is not provided in th...
- 15:0715:07, 25 February 2009 diff hist +40 m 127.22 Off-Site Borrow, Spoil, and Staging Areas redirect link to "Borrow and Excess Material Areas"
- 15:0415:04, 25 February 2009 diff hist +10 m 127.4 Wetlands and Streams redirect link to "Borrow and Excess Material Areas"
- 15:0315:03, 25 February 2009 diff hist +20 m 127.2 Historic Preservation and Cultural Resources redirect link to "Borrow and Excess Material Areas"
- 15:0215:02, 25 February 2009 diff hist +10 m 320.1 Preliminary Geotechnical Report (PGR) redirect link to "Borrow and Excess Material Areas"
- 15:0115:01, 25 February 2009 diff hist +10 m 320.1 Preliminary Geotechnical Report (PGR) redirect link to "Borrow and Excess Material Areas"
- 14:5614:56, 25 February 2009 diff hist +10 m 238.4 Construction Surveying redirect link to "Borrow and Excess Material Areas"
- 14:5414:54, 25 February 2009 diff hist +10 m LPA:136.8 Local Public Agency Land Acquisition redirect link to "Borrow and Excess Material Areas"
- 14:5314:53, 25 February 2009 diff hist +11 m Category:Shoulder Maintenance redirect link to "Borrow and Excess Material Areas"
- 14:5014:50, 25 February 2009 diff hist +10 m Category:239 Construction Inspection Guidelines for Final Plans redirect link to "Borrow and Excess Material Areas"
- 14:4914:49, 25 February 2009 diff hist +21 m Category:235 Preliminary Plans redirect link to "Borrow and Excess Material Areas"
- 14:4614:46, 25 February 2009 diff hist +20 m Category:806 Pollution, Erosion and Sediment Control direct links to "Borrow and Excess Material Areas"
- 14:4114:41, 25 February 2009 diff hist +10 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction relink to new "Borrow and Excess Material Areas" article
- 14:3514:35, 25 February 2009 diff hist +1,890 Nm Borrow and Excess Material Areas new article to replace former article entitled "Borrow and Waste Areas"
- 14:3214:32, 25 February 2009 diff hist −34 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction change wording to reflect "contractor furnished borrow and excess material areas"
- 14:2614:26, 25 February 2009 diff hist +224 Category talk:203 Roadway and Drainage Excavation, Embankment and Compaction address question. current
- 14:0614:06, 25 February 2009 diff hist +320 N Category talk:203 Roadway and Drainage Excavation, Embankment and Compaction Question about borrow areas.
- 14:0514:05, 25 February 2009 diff hist −126 m 236.3 Administration reorder "Forms" listing (mostly alphabetical)
- 13:4213:42, 25 February 2009 diff hist −352 m Category:101 Standard Forms delete links to forms 3.4-1A, 3.4-1B and 3.4-2A
- 13:3913:39, 25 February 2009 diff hist +322 m 236.3 Administration correct address of forms 3.4-1A, 3.4-1B and 3.4-2A
- 13:3513:35, 25 February 2009 diff hist +436 m 236.3 Administration correct address of forms 3.4-1A and 3.4-1B to RW folder rather than the DE-ROW folder
- 13:2813:28, 25 February 2009 diff hist +241 m 236.3 Administration correct address of forms 3.4-1A, 3.4-1B, and 3.4-2A to RW folder rather than DE-ROW folder
- 13:1513:15, 25 February 2009 diff hist +242 m Category:101 Standard Forms correct links for forms 3.4-1A, 3.4-1B and 3.4-2A to RW folder rather than DE-ROW folder
- 13:0513:05, 25 February 2009 diff hist +20 m 231.1 Median Width enable link to "Category:617 Traffic Barrier"
23 February 2009
- 15:5415:54, 23 February 2009 diff hist −66 m 236.14 Change in Route Status Report remove metric values
- 15:4715:47, 23 February 2009 diff hist −508 m 236.13 Designing Right of Way Plans enable link to "Category:940 Access Management" and remove metric values
- 14:3514:35, 23 February 2009 diff hist +156 m 236.13 Designing Right of Way Plans add a link to "Why is Commission Certification Required for Condemnation" and enhance wording about the project's description.
- 13:4613:46, 23 February 2009 diff hist +799 Shoulder Surface Added A3 shoulder guidance and updated useage of A1, A2 and A3 shoulders.
- 10:2410:24, 23 February 2009 diff hist +36 m 236.6 Appraisal and Appraisal Review update address (from uploaded file to web based for article 101) of ADV Profile Report
- 09:5209:52, 23 February 2009 diff hist +4 m Category:806 Pollution, Erosion and Sediment Control change heading "level" for "Sediment Trap"
- 09:5009:50, 23 February 2009 diff hist +1,759 m Category:806 Pollution, Erosion and Sediment Control add "new" wording for temporary sediment basin and add wording for "sediment trap".
20 February 2009
- 15:5015:50, 20 February 2009 diff hist +26 m Category:206 Excavation for Structures →206.2 Class 3 Excavation
- 15:4915:49, 20 February 2009 diff hist +14 m Category:206 Excavation for Structures Clarification with the Specification
- 15:4615:46, 20 February 2009 diff hist +23 m Category:206 Excavation for Structures →206.2 Class 3 Excavation
- 15:4415:44, 20 February 2009 diff hist −34 m Category:206 Excavation for Structures Clarification with the revised specification
19 February 2009
- 11:0611:06, 19 February 2009 diff hist 0 m Category:239 Construction Inspection Guidelines for Final Plans correct spelling of "summary" located in the first sentence.
- 10:4210:42, 19 February 2009 diff hist +113 Category:239 Construction Inspection Guidelines for Final Plans No edit summary
- 09:0109:01, 19 February 2009 diff hist +153 m 236.16 Outdoor Advertising change address of links
- 08:5008:50, 19 February 2009 diff hist +451 m 236.16 Outdoor Advertising change address of links
- 08:3808:38, 19 February 2009 diff hist +299 m 236.16 Outdoor Advertising change address of links
- 08:3108:31, 19 February 2009 diff hist −7 m 236.16 Outdoor Advertising chage address of permit transfer link
- 08:2808:28, 19 February 2009 diff hist +98 m 236.16 Outdoor Advertising change address of links
- 08:2208:22, 19 February 2009 diff hist +54 m 236.16 Outdoor Advertising change address of "form" links in the section.
- 08:1508:15, 19 February 2009 diff hist +108 m 236.16 Outdoor Advertising change address of "ADV report" link
- 08:1008:10, 19 February 2009 diff hist +54 m 236.16 Outdoor Advertising chage address of "scanning" link
18 February 2009
- 16:2016:20, 18 February 2009 diff hist +336 m Talk:Main Page reply to question